Intervenor |
Case Number |
Case Description |
Total Cost Award |
---|---|---|---|
Assn. of Major Power Consumers | $433,066.98 | ||
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $30,345.56 | |
EB-2010-0008 | Payment Amounts application | $211,139.34 | |
EB-2010-0046 | IESO Rate application | $4,893.47 | |
EB-2010-0219 | Review of ED cost allocation | $14,240.83 | |
EB-2007-0722 P2 | Cust Service, rate class | $8,881.33 | |
EB-2010-0131 | Horizon 2011 Rates | $51,360.76 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $48,070.35 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $30,971.58 | |
EB-2011-0286 | OPG Filing Requirements | $1,073.50 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $2,656.63 | |
EB-2010-0249 | ED Syst Reliability Standards | $6,076.58 | |
EB-2011-0335 | West Coast Tornado Relief | $3,695.67 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $19,661.38 | |
Assn. of Power Producers in Ont | $34,918.80 | ||
EB-2010-0184P3 | Motion by CCC | $1,133.82 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $2,471.80 | |
EB-2011-0008 | EGD Deferral Accounts | $7,452.36 | |
EB-2011-0257 | C1 & M12 rate schedules | $610.21 | |
EB-2010-0184P2 | Motion by CCC | $10,151.99 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $13,098.62 | |
Building Owners & Managers Assn. | $80,267.76 | ||
EB-2011-0226 | Enbridge Customer Care | $8,787.50 | |
EB-2011-0008 | EGD Deferral Accounts | $3,969.57 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $29,354.50 | |
EB-2008-0346P | Guidelines for Gas Utilities | $10,065.00 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $24,373.04 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $3,718.15 | |
Jeffrey Bruce & Bonnie Bruce | $29,822.16 | ||
EB-2010-0023 | Bruce-Milton Trans. Project | $29,822.16 | |
Bruce Sharp | $129.61 | ||
EB-2010-0245 | Implementation of CP provision | $129.61 | |
Consumer Council of Canada | $859,494.54 | ||
EB-2010-0245 | Implementation of CP provision | $6,712.20 | |
EB-2010-0184P2 | Motion by CCC | $48,651.65 | |
EB-2008-0150T | Low Income Consumers | $14,543.10 | |
EB-2010-0039 P2 | St. Clair Line | $8,353.88 | |
EB-2010-0364 | Time of Use Pricing | $5,779.95 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $5,593.50 | |
EB-2009-0269 | 2010 CoS application | $19,204.35 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $38,562.46 | |
EB-2010-0008 | Payment Amounts application | $202,029.28 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $2,050.95 | |
EB-2011-0054 | Ottawa 2012 Rates | $58,440.45 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $30,037.11 | |
EB-2008-0346P | Guidelines for Gas Utilities | $18,120.30 | |
EB-2010-0184P3 | Motion by CCC | $59,453.41 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $1,491.60 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $73,314.80 | |
EB-2010-0131 | Horizon 2011 Rates | $83,768.62 | |
EB-2010-0279 | Ontario Power Authority | $70,780.47 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $44,943.66 | |
EB-2008-0381 | Deferred PILs | $20,097.95 | |
EB-2011-0008 | EGD Deferral Accounts | $8,390.25 | |
EB-2011-0226 | Enbridge Customer Care | $35,632.05 | |
EB-2011-0286 | OPG Filing Requirements | $932.25 | |
EB-2008-0150V | FAWG | $2,610.30 | |
Can Energy Efficiency Alliance | $111,827.21 | ||
EB-2010-0279 | Ontario Power Authority | $73,000.00 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $38,827.21 | |
Can. Manufacturers & Exporters | $582,363.16 | ||
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $28,164.01 | |
EB-2010-0295 | Late payment penalties | $3,590.30 | |
EB-2011-0029 | 2011 QRAM | $1,091.58 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $42,702.70 | |
EB-2010-0008 | Payment Amounts application | $216,587.95 | |
EB-2011-0051 | 2011 QRAM App | $914.74 | |
EB-2010-0364 | Time of Use Pricing | $2,622.73 | |
EB-2010-0039 P2 | St. Clair Line | $66,113.24 | |
EB-2010-0046 | IESO Rate application | $12,842.04 | |
EB-2011-0135 | 2011 QRAM | $955.13 | |
EB-2011-0090 | OPG Motion | $9,766.78 | |
EB-2007-0722 P2 | Cust Service, rate cl | $1,818.98 | |
EB-2010-0219 | Review of ED cost allocation | $1,991.06 | |
EB-2010-0184P2 | Motion by CCC | $35,187.06 | |
EB-2011-0129 | 2011 QRAM | $574.89 | |
EB-2010-0245 | Implementation of CP provision | $1,344.42 | |
EB-2008-0408P2 | Transition to IFRS | $5,120.31 | |
EB-2011-0067 | Amendment to HONI licence | $1,281.99 | |
EB-2010-0279 | Ontario Power Authority | $51,884.20 | |
EB-2011-0290 | ARC Exemption Extension | $579.97 | |
EB-2011-0286 | OPG Filing Requirements | $532.23 | |
EB-2011-0297 | 2011 QRAM | $520.65 | |
EB-2011-0296 | QRAM app | $494.09 | |
EB-2007-0722P3 | Customer Service Code Phase 3 | $919.26 | |
EB-2011-0226 | Enbridge Customer Care | $27,329.40 | |
EB-2011-0257 | C1 & M12 rate schedules | $938.75 | |
EB-2011-0008 | EGD Deferral Accounts | $12,575.48 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $2,536.29 | |
EB-2010-0184P3 | Motion by CCC | $24,102.75 | |
EB-2011-0118 | Exemption from DSC S6.2.6/7 | $4,969.57 | |
EB-2011-0382 | QRAM Application | $1,213.90 | |
EB-2008-0346P | Guidelines for Gas Utilities | $14,192.65 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $2,919.96 | |
EB-2010-0249 | ED Syst Reliability Standards | $2,430.91 | |
EB-2011-0390 | 2012 QRAM | $727.72 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $825.47 | |
Council of Canadians | $31,701.97 | ||
EB-2010-0199 | 2010 Natural Gas Market Review | $31,701.97 | |
County of Middlesex | $29,852.86 | ||
EB-2010-0381 | London Reinforcement Project | $29,852.86 | |
Canadian Solar Industries n. | $41,004.84 | ||
EB-2011-0118 | Exemption from DSC S6.2.6/7 | $41,004.84 | |
Donald Rennick | $0.00 | ||
EB-2010-0102 | 2011 EDR app - IRM | $0.00 | |
Energy Probe | $664,628.27 | ||
EB-2010-0137 | 2011 EDR app | $17,942.32 | |
EB-2010-0008 | Payment Amounts application | $138,585.87 | |
EB-2009-0274 | Whitby Hydro 2010 CoS app | $26,285.04 | |
EB-2010-0074 | 2011 EDR app - IRM | $1,054.35 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $15,479.84 | |
EB-2009-0269 | 2010 CoS application | $17,714.66 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $7,937.00 | |
EB-2010-0138 | 2011 CoS app | $16,893.71 | |
EB-2010-0046 | IESO Rate application | $3,828.73 | |
EB-2010-0145 | 2011 Rates | $12,592.47 | |
EB-2010-0132 | 2011 Rates | $40,330.84 | |
EB-2010-0125 | 2011 CoS app | $16,289.76 | |
EB-2010-0144 | 2011 CoS app | $16,858.39 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $2,646.56 | |
EB-2008-0346P | Guidelines for Gas Utilities | $14,951.10 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,993.58 | |
EB-2011-0054 | Ottawa 2012 Rates | $44,183.77 | |
EB-2011-0273 | Grimby 2012 CoS | $19,950.74 | |
EB-2010-0249 | ED Syst Reliability Standards | $8,474.74 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $10,757.89 | |
EB-2011-0073 | Oshawa 2012 Rates | $26,628.41 | |
EB-2010-0141 | St.Thomas 2011 CoS | $13,953.23 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $15,648.25 | |
EB-2010-0136 | Kingston 2011 Rates | $31,385.97 | |
EB-2010-0279 | Ontario Power Authority | $26,781.41 | |
EB-2010-0131 | Horizon 2011 Rates | $65,248.26 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $33,196.52 | |
EB-2011-0008 | EGD Deferral Accounts | $4,587.54 | |
EB-2011-0226 | Enbridge Customer Care | $12,447.32 | |
Electrical Contractors Assn. On | $6,185.56 | ||
EB-2009-0180-3 | Streetlighting Valuation | $6,185.56 | |
Ecology Ottawa | $5,601.41 | ||
EB-2011-0054 | Ottawa 2012 Rates | $3,752.53 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,848.88 | |
Fallis, Falls & McMillan | $31,925.13 | ||
EB-2010-0023 | Bruce-Milton Trans. Project | $31,925.13 | |
Federation of Rental-housing | $63,610.65 | ||
EB-2010-0039 P2 | St. Clair Line | $14,580.65 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $14,669.34 | |
EB-2008-0346P | Guidelines for Gas Utilities | $9,989.10 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $2,734.15 | |
EB-2011-0226 | Enbridge Customer Care | $13,417.95 | |
EB-2011-0008 | EGD Deferral Accounts | $8,219.46 | |
Green Energy Coalition | $231,579.52 | ||
EB-2010-0279 | Ontario Power Authority | $69,931.19 | |
EB-2008-0346P | Guidelines for Gas Utilities | $25,740.72 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $2,595.78 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $31,378.01 | |
EB-2010-0008 | Payment Amounts application | $101,933.82 | |
Haldimand County Hydro | $13,291.63 | ||
EB-2011-0027 | leave to construct | $13,291.63 | |
Harry Lawson | $1,799.42 | ||
EB-2011-0013/ EB-2011-0014 | Jacob Pool | $1,799.42 | |
Industrial Gas Users Assn. | $62,140.65 | ||
EB-2011-0008 | EGD Deferral Accounts | $4,933.53 | |
EB-2011-0296 | QRAM app | $526.65 | |
EB-2011-0297 | 2011 QRAM | $456.59 | |
EB-2011-0390 | 2012 QRAM | $862.83 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $2,170.78 | |
EB-2008-0346P | Guidelines for Gas Utilities | $17,603.41 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $2,466.09 | |
EB-2011-0382 | QRAM Application | $382.57 | |
EB-2010-0184P3 | Motion by CCC | $1,925.31 | |
EB-2011-0051 | 2011 QRAM App | $1,011.99 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $15,578.11 | |
EB-2011-0029 | 2011 QRAM | $864.25 | |
EB-2010-0039 P2 | St. Clair Line | $4,623.16 | |
EB-2011-0129 | 2011 QRAM | $655.48 | |
EB-2010-0184P2 | Motion by CCC | $7,531.77 | |
EB-2011-0135 | 2011 QRAM | $548.13 | |
Kent Federation of Agriculture | $1,392.73 | ||
EB-2011-0013/ EB-2011-0014 | Jacob Pool | $1,392.73 | |
Low Income Energy Network | $109,840.69 | ||
EB-2011-0011P | Toronto Hydro CDM Plan | $12,377.19 | |
EB-2010-0279 | Ontario Power Authority | $25,000.00 | |
EB-2007-0722P3 | Customer Service Code Phase 3 | $9,319.46 | |
EB-2008-0150V | FAWG | $420.37 | |
EB-2008-0346P | Guidelines for Gas Utilities | $24,936.31 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,875.52 | |
EB-2008-0150 F | Fawg II | $132.47 | |
EB-2008-0150T | Low Income Consumers | $1,025.61 | |
EB-2007-0722 P2 | Cust Service, rate class | $6,930.00 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $25,206.76 | |
EB-2011-0011 | CDM application | $2,617.00 | |
London Property Management Assn. | $72,603.06 | ||
EB-2010-0199 | 2010 Natural Gas Market Review | $15,846.91 | |
EB-2007-0722 P2 | Cust Service, rate class | $15,840.00 | |
EB-2010-0219 | Review of ED cost allocation | $5,818.79 | |
EB-2010-0245 | Implementation of CP provision | $11,964.22 | |
EB-2010-0364 | Time of Use Pricing | $4,863.61 | |
EB-2008-0346P | Guidelines for Gas Utilities | $11,228.49 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $1,540.76 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $1,305.15 | |
EB-2007-0722P3 | Customer Service Code Phase 3 | $4,195.13 | |
Lac Seul First Nation | $27,785.23 | ||
EB-2011-0106 | Leave to construct | $27,785.23 | |
Machacek | $0.00 | ||
EB-2011-0217 | leave to construct | $0.00 | |
Ontario Assn. Phys. Plant Adm. | $760.00 | ||
EB-2011-0052 | Incentive Regulation Plan Gas | $760.00 | |
Ontario Sustainable Energy Assn. | $58,828.41 | ||
EB-2008-0346P | Guidelines for Gas Utilities | $25,796.55 | |
EB-2011-0118 | Exemption from DSC S6.2.6/7 | $33,031.86 | |
Pollution Probe | $200,507.15 | ||
EB-2008-0346P | Guidelines for Gas Utilities | $11,142.88 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $494.10 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,109.63 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $1,188.24 | |
EB-2010-0279 | Ontario Power Authority | $16,942.14 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $7,673.71 | |
EB-2010-0364 | Time of Use Pricing | $2,298.99 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $11,986.14 | |
EB-2011-0011 | CDM application | $0.00 | |
EB-2010-0008 | Payment Amounts application | $147,671.32 | |
Ross Firm Group | $31,779.55 | ||
EB-2010-0023 | Bruce-Milton Trans. Project | $31,779.55 | |
Salvation Army Centre of Hope | $515.61 | ||
EB-2008-0150T | Low Income Consumers | $515.61 | |
School Energy Coalition | $978,976.80 | ||
EB-2011-0090 | OPG Motion | $10,131.00 | |
EB-2010-0219 | Review of ED cost allocation | $8,151.00 | |
EB-2007-0722 P2 | Cust Service, rate class | $5,478.00 | |
EB-2008-0408P2 | Transition to IFRS | $11,979.00 | |
EB-2010-0138 | 2011 CoS app | $13,537.24 | |
EB-2010-0144 | 2011 CoS app | $8,872.80 | |
EB-2010-0364 | Time of Use Pricing | $4,823.00 | |
EB-2010-0132 | 2011 Rates | $28,847.36 | |
EB-2010-0354 | motion to review | $4,554.00 | |
EB-2010-0145 | 2011 Rates | $9,968.16 | |
EB-2010-0130 | 2011 IRM app | $2,442.00 | |
EB-2010-0008 | Payment Amounts application | $211,131.12 | |
EB-2010-0137 | 2011 EDR app | $12,721.00 | |
EB-2010-0104 | 2011 IRM app | $2,673.00 | |
EB-2011-0011 | CDM application | $2,617.00 | |
EB-2009-0274 | Whitby Hydro 2010 CoS app | $30,029.76 | |
EB-2010-0074 | 2011 EDR app - IRM | $5,511.00 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $23,986.76 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $10,560.00 | |
EB-2010-0295 | Late payment penalties | $5,053.00 | |
EB-2009-0269 | 2010 CoS application | $15,419.08 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $83,434.36 | |
EB-2010-0131 | Horizon 2011 Rates | $78,829.32 | |
EB-2010-0279 | Ontario Power Authority | $25,388.00 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $21,128.00 | |
EB-2010-0141 | St.Thomas 2011 CoS | $14,196.76 | |
EB-2008-0381 | Deferred PILs | $57,784.64 | |
EB-2010-0136 | Kingston 2011 Rates | $32,505.44 | |
EB-2011-0286 | OPG Filing Requirements | $3,176.00 | |
EB-2011-0008 | EGD Deferral Accounts | $5,709.00 | |
EB-2011-0226 | Enbridge Customer Care | $18,480.00 | |
EB-2009-0180-3 | Streetlighting Valuation | $4,950.00 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,320.00 | |
EB-2011-0273 | Grimby 2012 CoS | $16,764.00 | |
EB-2011-0054 | Ottawa 2012 Rates | $52,011.00 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $43,190.00 | |
EB-2011-0073 | Oshawa 2012 Rates | $37,899.00 | |
EB-2011-0335 | West Coast Tornado Relief | $2,442.00 | |
EB-2010-0249 | ED Syst Reliability Standards | $12,046.00 | |
EB-2008-0346P | Guidelines for Gas Utilities | $25,971.00 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $3,630.00 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $3,301.00 | |
EB-2011-0428 | Accounting Procedures Handbook | $4,818.00 | |
EB-2011-0328 | CKH Merger | $1,518.00 | |
Six Nations Council | $33,872.74 | ||
EB-2011-0063 | Grand Renewable Leave to Const | $33,872.74 | |
Toronto & Region Conservation | $13,612.50 | ||
EB-2008-0346P | Guidelines for Gas Utilities | $13,612.50 | |
Taykwa Tagamou Nation | $5,009.09 | ||
EB-2011-0115 | Leave to construct | $5,009.09 | |
Vulnerable Energy Cons Coa. | $714,783.73 | ||
EB-2010-0136 | Kingston 2011 Rates | $23,698.31 | |
EB-2011-0049 | 2011 EDR - IRM | $686.00 | |
EB-2010-0141 | St.Thomas 2011 CoS | $17,035.78 | |
EB-2010-0140 | 2011 EDR app - CoS | $12,862.58 | |
EB-2011-0011P | Toronto Hydro CDM Plan | $13,433.20 | |
EB-2010-0279 | Ontario Power Authority | $24,184.76 | |
EB-2010-0131 | Horizon 2011 Rates | $50,526.28 | |
EB-2010-0142 | Toronto Hydro 2011 Rates | $35,313.09 | |
EB-2011-0226 | Enbridge Customer Care | $12,180.73 | |
EB-2011-0008 | EGD Deferral Accounts | $4,863.35 | |
EB-2008-0150V | FAWG | $1,886.51 | |
EB-2005-0201 | Trafalgar Expansion | $8,520.67 | |
EB-2007-0722P3 | Customer Service Code Phase 3 | $4,984.97 | |
EB-2008-0346P | Guidelines for Gas Utilities | $13,881.70 | |
EB-2011-0128 | Smart Meter Cost RecPower Str. | $3,258.52 | |
EB-2011-0052 | Incentive Regulation Plan Gas | $1,372.01 | |
EB-2011-0268 | 2011-12 Tx Revenue Req | $2,315.27 | |
EB-2010-0184P3 | Motion by CCC | $12,092.38 | |
EB-2011-0172 | Horizon Utilities LRAM | $1,577.29 | |
EB-2011-0174 | Hydro One Brampton 2012 EDR | $1,826.75 | |
EB-2010-0249 | ED Syst Reliability Standards | $1,543.52 | |
EB-2011-0206 | Whitby Hydro LRAM | $1,629.26 | |
EB-2011-0335 | West Coast Tornado Relief | $2,744.02 | |
EB-2011-0073 | Oshawa 2012 Rates | $23,136.00 | |
EB-2011-0144 | Toronto Hydro 2012-14 Rates | $12,442.40 | |
EB-2011-0054 | Ottawa 2012 Rates | $50,672.06 | |
EB-2011-0273 | Grimby 2012 CoS | $18,158.30 | |
EB-2008-0150 F | Fawg II | $2,315.27 | |
EB-2011-0295 | Enbridge 2012-14 DSM Plan | $1,283.66 | |
EB-2009-0269 | 2010 CoS application | $13,205.59 | |
EB-2010-0295 | Late payment penalties | $2,229.51 | |
EB-2010-0199 | 2010 Natural Gas Market Review | $4,544.77 | |
EB-2010-0331/ EB-2010-0332 | 2011-14 CDM Programs | $5,623.15 | |
EB-2010-0078 | 2011 EDR app - IRM | $1,715.01 | |
EB-2010-0098 | 2011 EDR app - IRM | $1,029.00 | |
EB-2010-0119 | 2011 EDR app - IRM | $1,457.76 | |
EB-2010-0095 | 2011 EDR app - IRM | $2,143.77 | |
EB-2010-0067 | 2011 EDR app - IRM | $2,315.27 | |
EB-2010-0082 | 2011 EDR app - IRM | $771.76 | |
EB-2010-0087 | 2011 EDR app - IRM | $514.50 | |
EB-2010-0096 | 2011 EDR app - IRM | $600.26 | |
EB-2010-0099 | 2011 EDR app - IRM | $1,457.76 | |
EB-2010-0143 | 2011 EDR app - IRM | $1,543.51 | |
EB-2010-0074 | 2011 EDR app - IRM | $2,701.93 | |
EB-2010-0093 | 2011 EDR app - IRM | $428.77 | |
EB-2010-0068 | 2011 EDR app - IRM | $428.75 | |
EB-2010-0101 | 2011 EDR app - IRM | $1,886.51 | |
EB-2010-0106 | 2011 EDR app - IRM | $1,200.50 | |
EB-2010-0115 | 2011 EDR app - IRM | $1,800.76 | |
EB-2010-0065 | 2011 EDR app - IRM | $1,715.72 | |
EB-2009-0274 | Whitby Hydro 2010 CoS app | $25,136.41 | |
EB-2010-0076 | 2011 EDR app - IRM | $1,800.77 | |
EB-2010-0072 | 2011 EDR app - IRM | $686.00 | |
EB-2010-0104 | 2011 IRM app | $2,829.77 | |
EB-2010-0117 | 2011 EDR app - IRM | $2,143.76 | |
EB-2010-0102 | 2011 EDR app - IRM | $428.74 | |
EB-2010-0137 | 2011 EDR app | $12,176.57 | |
EB-2010-0008 | Payment Amounts application | $78,853.84 | |
EB-2010-0130 | 2011 IRM app | $2,915.52 | |
EB-2010-0145 | 2011 Rates | $11,632.46 | |
EB-2010-0046 | IESO Rate application | $5,849.75 | |
EB-2010-0110/ EB-2010-0365 | 2011 EDR app - IRM | $2,058.01 | |
EB-2010-0079 | 2011 EDR app - IRM | $1,457.75 | |
EB-2010-0105 | 2011 EDR app - IRM | $1,543.51 | |
EB-2010-0107 | 2011 EDR app - IRM | $1,457.76 | |
EB-2010-0083 | 2011 EDR app - IRM | $1,972.27 | |
EB-2010-0132 | 2011 Rates | $32,636.34 | |
EB-2010-0116 | 2011 EDR app - IRM | $686.00 | |
EB-2009-0266 | 2010 CoS rates app | $14,862.38 | |
EB-2010-0364 | Time of Use Pricing | $4,373.27 | |
EB-2010-0144 | 2011 CoS app | $18,779.37 | |
EB-2010-0125 | 2011 CoS app | $17,432.82 | |
EB-2010-0138 | 2011 CoS app | $12,749.80 | |
EB-2008-0408P2 | Transition to IFRS | $6,602.79 | |
EB-2010-0135 | 2011 EDR app - CoS | $9,861.31 | |
EB-2010-0245 | Implementation of CP provision | $3,059.99 | |
EB-2007-0722 P2 | Cust Service, rate class | $2,383.12 | |
EB-2010-0219 | Review of ED cost allocation | $14,148.83 | |
EB-2008-0150T | Low Income Consumers | $13,291.33 | |
EB-2011-0193 | Parry Sound Delivery Charges | $1,234.29 | |
Catharine Gale Walford | $40,352.78 | ||
EB-2010-0023 | Bruce-Milton Trans. Project | $40,352.78 | |
Robert Watson | $41,914.12 | ||
EB-2010-0023 | Bruce-Milton Trans. Project | $41,914.12 | |
Wayne M'Lellan | $728.81 | ||
EB-2011-0118 | Exemption from DSC S6.2.6/7 | $728.81 | |
Yellow Creek Farms | $1,445.93 | ||
EB-2011-0118 | Exemption from DSC S6.2.6/7 | $1,445.93 | |
Total | $5,649,921.06 |