Enbridge Gas Inc. - Ontario Line - Overlea Station Relocation Project

Enbridge Gas Inc.
EB-2024-0250

Enbridge Gas Inc. (Enbridge Gas) has applied under section 95 (1) of the Ontario Energy Board Act, 1998 (OEB Act) for an exemption from the requirement to obtain leave to construct approximately 1.6 km of natural gas pipeline and related assets (Project). The Project consists of:

  • 1,100 m of NPS 8-inch polyethylene (PE) intermediate pressure (IP) natural gas pipeline
  • 120 m of NPS 2-inch PE IP natural gas pipeline
  • 35 m of NPS 6-inch PE IP natural gas pipeline
  • 360 m of NPS 4-inch PE IP natural gas pipeline
  • A new Header Station
  • A new District Station

Enbridge Gas submits that the Project should be exempt from the requirement to obtain leave to construct due to special circumstances, including:

  • The Project is needed to accommodate the construction of the Ontario Line, a priority transit project being developed by the Province of Ontario, the City of Toronto, and Metrolinx
  • That Metrolinx will pay for the Project and there will be no cost impacts on existing ratepayers
  • All lands required for the Project are under the control of Metrolinx and the City of Toronto

An exemption supports the spirit and stated purpose of the Building Transit Faster Act, 2020, which is to expedite the delivery of transit projects of provincial significance by removing barriers and streamlining processes that may result in delays to the timely completion of these projects The Project includes an approximately 70 m section of new pipeline that will be larger in diameter than the original pipeline it is replacing. In this application, the OEB will determine whether there are special circumstances that warrant granting Enbridge Gas an exemption from the requirement of seeking leave to construct a hydrocarbon pipeline under subsection 90 (1) of the (OEB Act). If an exemption is granted, no further approval will be needed from the OEB to allow Enbridge Gas to construct the Project.

Enbridge Gas filed a previous application under section 90 (1) of the OEB Act, that sought leave to construct the Overlea Station project (EB-2024-0141). The previous application is presently in abeyance pending the outcome of the current application.

The location of the proposed pipelines is shown in the map. 

Ontario Line (OL) - Overlea Relocation map

 

See the application notice 
See the application 
See all documents related to this application 
The above links will take you to our document repository

Participate

There are three ways to participate in the OEB hearing process: as an Intervenor, submitting a Letter of Comment or to Follow a Proceeding.

This table illustrates the different levels of participation. Find out more about participating in an OEB hearing, including becoming an intervenor.

Participation ActivitiesIntervenorLetter of CommentFollow a Proceeding
Receive OEB-issued documents by email
Submit a Letter of Comment
Listen to live broadcast of the oral hearing
Participate in oral hearing
Present Evidence
Respond to questions about evidence
Ask other parties to the proceeding questions
Provide argument

Submit a letter of comment

You can submit a letter of comment that will be considered by the panel deciding the application. Unless the notice states otherwise, your letter of comment will be accepted until the record of the proceeding is closed (which usually occurs with the filing of the applicant’s final reply argument). However, you are encouraged to submit your letter as early in the process as you can. Depending on timing of receipt of letters of comment, the applicant will typically provide a respond to the issues raised in those letters. Your letter will be provided directly to the panel of Commissioners who will be deciding whether the application is approved. The panel will consider your comments in reaching their decision. The panel will only be able to consider comments which relate to issues which are within the authority of the OEB and relevant to the issues being considered by the panel.

More about commenting and privacy
All letters of comment sent to the OEB are placed on the public record. This means the letters will be placed on our website. Before the letter of comment is placed on the public record, personal contact information contained in the address, phone number, and email address fields of this form is removed. The individual's name and the content of the letter will become part of the public record.

If you would like a response from the applicant, please send a copy of your letter directly to the applicant, including your personal contact information. The OEB removes your personal contact information from your letter for privacy reasons before it is posted to our website.

Add Your Letter of Comment

All information provided in this field will be made publicly available and placed on the OEB website. Please do not include any personal contact information in this section.
Upload an attachment only if you need to submit additional information relating to your comment. Only PDF and Word files will be accepted. All information provided in the document you attach will be made publicly available and placed on the OEB website. Please do not include any personal contact information in your attached document.
Choose file
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Get updates about this application:

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Or mail the below address with the reference number EB-2024-0250

Ontario Energy Board
P.O. Box 2319
2300 Yonge Street, 27th Floor
Toronto ON M4P 1E4
Attn: Registrar