As set out in the Report of the Board: A Renewed Regulatory Framework for Electricity (pdf) (the "RRFE Report"), three alternative rate-setting methods are available to electricity distributors: Price Cap Incentive Rate-setting (Price Cap IR); Custom Incentive Rate-setting (Custom IR); and Annual Incentive Rate-setting Index (Annual IR Index).
On December 29, 2015 the OEB issued a letter identifying a preliminary list of electricity distributors (pdf) ("the Rebasing List") that are scheduled to file a cost of service application in respect of their 2017 and 2018 rates assuming they opt for the Price Cap IR method. In light of the imbalance in the number of distributors scheduled to file a cost of service application for 2017 rates (31) and for 2018 rates (4), the OEB is inviting electricity distributors that are scheduled to file a cost of service application for 2017 rates to submit expressions of interest for a deferral to rebase for 2018 rates. The OEB will establish the final list of rebasers for 2017 rates in due course. The OEB will address deferrals from 2018 to 2019 at a later time.
This letter also sets out the deadlines by which notice must be given to the OEB in respect of various other matters relating to the setting of 2017 rates, and by which cost of service applications for 2017 rates are expected to be filed. The following table summarizes these deadlines.
Action |
OEB Deadline |
---|---|
Notification from any distributor on the 2017 Rebasing List that will be selecting either the Custom IR or Annual IR Index method and therefore will not be filing a cost of service rate application for 2017 rates | February 26, 2016 |
Notification from any distributor that is currently on Annual IR Index but that plans to file a cost of service rate application under the Price Cap IR method or a Custom IR application for 2017 rates | February 26, 2016 |
Letter from any distributor included on the 2017 Rebasing List that wishes to submit an expression of interest to defer rebasing beyond 2017 | February 26, 2016 |
Notification from any distributor that is not included on the 2017 Rebasing List but that plans to file a cost of service application for 2017 rates under the Price Cap IR method (early rebasing) | February 26, 2016 |
Deadline for cost of service (and Custom IR) applications for January 1, 2017 rates | April 29, 2016 |
Deadline for cost of service (and Custom IR) applications for May 1, 2017 rates | August 26, 2016 |
The following table identifies all 76 rate regulated electricity distributors in Ontario. The table contains links to select documents of a distributor’s rate application. These documents include:
- Key correspondence regarding the status of an application, including the choice of rate-setting method for 2017 rates. For applications to be decided under Delegated Authority, case management letters are used to communicate case steps and dates rather than a letter of direction and procedural order.
- The "Notice" issued by the OEB and to be published by the distributor, if applicable. The purpose of the Notice is to inform affected ratepayers and other stakeholders of the application, its nature and the impact on affected customers.
- The Decision issued by the OEB when it has made determinations on the application and the subsequent Rate Order and Tariff of Rates and Charges that reflects the Decision
2017 Electricity Distribution Rates Backgrounder (pdf)
Estimated Total Bill Impacts (pdf) (For May 1, 2017)
APPLICATIONS DOCUMENTS
This table provides a list of select documents related to each application. To view all publicly available documents for the application, click the case number associated with that particular distributor.
DEFINITIONS:
COS: Distributors rebasing under the Price Cap Incentive Rate-setting method
Price Cap IR: Distributors not rebasing under the Price Cap Incentive Rate-setting method
Custom IR: Distributors filing under the Custom Incentive Rate-setting method
Annual IR Index: Distributors filing under the Annual Incentive Rate-setting Index method
*DA – Delegated Authority: Pursuant to powers granted in Section 6 of the Ontario Energy Board Act, 1998, an employee of the OEB may make a decision on the application without holding a hearing. For these applications, there are normally no formal hearings and thus, no publication requirements of a formal Notice of Application. The process and timelines associated with the assessment of the applications by OEB staff are communicated to distributors by way of Case Management letters.
NoA: Notice of Application
Click the column header to sort the table by Distributor, Process, Application Received or Updated on. Click the column again to switch between ascending/descending order. To filter results, start typing in the search field below. As you type the table will re-sort to only show rows that match what you type (e.g. typing 'Niagara' will show only the rows for Canadian Niagara Power Inc., Niagara Peninsula Energy Inc. and Niagara-on-the-Lake Hydro Inc.).
Distributor |
Process |
Letters |
App. Received |
NoA |
Decision / Rate Order |
Updated |
---|---|---|---|---|---|---|
Algoma Power Inc. EB-2016-0055 |
Price Cap IR | OEB Case Management Letter (Sep 7-16) | 2016/08/12 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Atikokan Hydro Inc. EB-2016-0056 |
COS | Letter re: delay in filing (Aug 25-16) | 2016/10/04 | NoA | Decision and Rate Order (Apr 13-17) | 2017/04/13 |
Attawapiskat Power Corporation | COS | |||||
Bluewater Power Distribution Corp. EB-2016-0057 |
Price Cap IR | Letter re: 2017 COS deferral (Oct 15-15) OEB response re: 2017 COS deferral (Mar 21-16) OEB Case Management Letter (Oct 18-16) |
2016/09/26 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Brantford Power Inc. EB-2016-0058 |
COS | Letter re: delay in filing (Apr 29-16) | 2016/05/04 | NoA | Decision and Order (Nov 24-16) | 2016/11/24 |
Burlington Hydro Inc. EB-2016-0059 |
Price Cap IR | OEB Case Management Letter (Nov 2-16) | 2016/10/12 | Decision and Rate Order (Apr 20-17) | 2017/04/20 | |
Canadian Niagara Power Inc. – Eastern Ontario Power / Fort Erie / Port Colborne EB-2016-0061 |
COS | 2016/04/29 | NoA |
Interim Rate Order (Dec 13-16)
Final Rate Order (Apr 6-17) |
2017/04/06 | |
Centre Wellington Hydro Ltd. EB-2016-0062 |
Price Cap IR | Letter re: 2017 COS deferral (Jan 5-16) OEB response re: 2017 COS deferral (Mar 21-16) |
2016/10/14 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Chapleau Public Utilities Corporation | Price Cap IR | |||||
COLLUS PowerStream Corp. EB-2016-0064 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 22-16) OEB response re: 2017 COS deferral (Jul 5-16) OEB Case Management Letter (Oct 7-16) |
2016/09/22 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Cooperative Hydro Embrun Inc. EB-2016-0065 |
Price Cap IR | OEB Case Management Letter (Sep 6-16) | 2016/08/16 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
E.L.K. Energy Inc. EB-2016-0066 |
COS | Letter re: delay in filing (Aug 25-16) | 2016/11/04 | NoA | Decision and Rate Order (Nov 2-17) | 2017/11/02 |
Energy + Inc. EB-2016-0060 |
Price Cap IR | OEB Case Management Letter (Oct 7-16) | 2016/09/26 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Enersource Hydro Mississauga Inc. EB-2016-0002 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 25-16) OEB response re: 2017 COS deferral (Mar 22-16) |
2016/08/15 | NoA | Decision and Rate Order (Dec 8-16) Final Rate Order (Dec 22-16) |
2016/12/22 |
Entegrus Powerlines Inc. EB-2016-0063 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/09/26 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
ENWIN Utilities Ltd. EB-2016-0067 |
Annual IR Index | Letter re: Plans for filing 2018 COS application (Jan 18-16) OEB Case Management Letter (Nov 23-16) |
2016/11/04 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Erie Thames Powerlines Corp. EB-2016-0068 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 9-16) OEB response re: 2017 COS deferral (Jul 5-16) OEB Case Management Letter (Oct 25-16) |
2016/10/17 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Espanola Regional Hydro Distribution Corporation | Price Cap IR | Letter re: converting to 2018 COS (Apr 24-17) | 2017/04/24 | |||
Essex Powerlines Corporation EB-2016-0069 |
Price Cap IR | Letter re: 2017 COS deferral (Jan 25-16) OEB response re: 2017 COS deferral (Mar 21-16) OEB Case Management Letter (Jan 19-17) |
2017/01/12 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Festival Hydro Inc. EB-2016-0070 |
Price Cap IR | 2016/08/15 | NoA | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Fort Albany Power Corporation | COS | |||||
Fort Frances Power Corporation EB-2016-0071 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/10/17 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Greater Sudbury Hydro Inc. EB-2016-0072 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 26-16) OEB response re: 2017 COS deferral (Jul 5-16) OEB Case Management Letter (Nov 18-16) |
2016/11/07 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Grimsby Power Incorporated EB-2016-0073 |
Price Cap IR | OEB Case Management Letter (Nov 22-16) | 2016/10/14 | Decision and Rate Order (Dec 15-16) Letter re: correction (Dec 20-16) |
2016/12/20 | |
Guelph Hydro Electric Systems Inc. EB-2016-0075 |
Price Cap IR | OEB Case Management Letter (Sep 6-16) | 2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Halton Hills Hydro Inc. EB-2016-0076 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/10/17 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Hearst Power Distribution Co. Ltd. EB-2016-0224 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/10/18 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Horizon Utilities Corporation EB-2016-0077 |
Custom IR - Year 3 Update | 2016/08/11 | NoA | Decision and Order (Jan 12-17) Rate Order (Feb 2-17) |
2017/02/02 | |
Hydro 2000 Inc. EB-2016-0078 |
Price Cap IR | Letter re: 2017 COS deferral request (Jul 21-16) OEB response re: 2017 COS deferral request (Aug 22-16) OEB Case Management Letter (Dec 13-16) |
2016/12/07 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Hydro Hawkesbury Inc. EB-2016-0079 |
Price Cap IR | OEB Case Management Letter (Sep 6-16) | 2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Hydro One Brampton Networks Inc. EB-2016-0080 |
Price Cap IR | OEB Case Management Letter (Aug 29-16) |
2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/19 | |
Hydro One Networks Inc. EB-2016-0081 |
Custom IR - Year 3 Update | Decision and Rate Order (Dec 21-16) | 2016/12/21 | |||
Hydro One Networks Inc. - Norfolk, Haldimand, Woodstock EB-2016-0082 |
Res. Rate Design Change | OEB Case Management Letter (Oct 28-16) | 2016/10/18 | Decision and Rate Order (Dec 21-16) | 2016/12/21 | |
Hydro One Remote Communities Inc. EB-2016-0083 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 23-16) OEB response re: 2017 COS deferral (Jul 5-16) |
2016/11/09 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Hydro Ottawa Limited EB-2016-0084 |
Custom IR - Year 2 Update | OEB Case Management Letter (Oct 18-16) | 2016/08/15 | Decision and Rate Order (Dec 21-16) Final Rate Order (Dec 29-16) |
2016/12/29 | |
Innpower Corporation EB-2016-0085 |
COS | Letter re: intent to file Custom IR (Feb 26-16) Letter re: delay in filing (May 27-16) |
2016/11/28 | NoA |
Interim Rate Order (Dec 21-16)
Decision and Order (Mar 8-18)
Final Rate Order (May 3-18) |
2018/05/03 |
Kashechewan Power Corporation | COS | |||||
Kenora Hydro Electric Corporation Ltd. EB-2016-0086 |
Annual IR Index | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |||
Kingston Hydro Corporation EB-2016-0087 |
Custom IR - Year 2 Update | OEB Case Management Letter (Nov 11-16) | 2016/08/15 | NoA | Decision and Rate Order (Dec 29-16) | 2016/12/29 |
Kitchener-Wilmot Hydro Inc. EB-2016-0088 |
Price Cap IR | OEB Case Management Letter (Sep 6-16) | 2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Lakefront Utilities Inc. EB-2016-0089 |
COS | 2016/04/29 | NoA | Interim Rate Order (Dec 21-16) Final Rate Order (Jan 5-17) |
2017/01/05 | |
Lakeland Power Distribution Ltd. EB-2016-0090 |
Price Cap IR | Letter re: delay in filing (Aug 16-16) OEB Case Management Letter (Sep 7-16) |
2016/08/23 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
London Hydro Inc. EB-2016-0091 |
COS | 2016/08/26 | NoA | Decision and Rate Order (Mar 23-17) | 2017/03/23 | |
Midland Power Utility Corporation EB-2016-0092 |
Price Cap IR | Letter re: 2017 COS deferral (Dec 1-15) OEB response re: 2017 COS deferral (Mar 22-16) OEB Case Management Letter (Nov 23-16) |
2016/11/07 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Milton Hydro Distribution Inc. EB-2016-0093 |
Price Cap IR | OEB Case Management Letter (Nov 14-16) | 2016/11/02 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Newmarket – Tay Power Distribution Ltd. EB-2016-0275 |
Annual IR Index | 2016/11/09 | NoA | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Niagara Peninsula Energy Inc. EB-2016-0094 |
Price Cap IR | OEB Case Management Letter (Oct 7-16) |
2016/09/26 | Decision and Rate Order (May 5-17) | 2017/05/04 | |
Niagara-on-the-Lake Hydro Inc. EB-2016-0095 |
Price Cap IR | OEB Case Management Letter (Oct 18-16) | 2016/10/05 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
North Bay Hydro Distribution Limited EB-2016-0214 |
Price Cap IR | OEB Case Management Letter (Oct 7-16) | 2016/09/26 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Northern Ontario Wires Inc. EB-2016-0096 |
COS | Letter re: intent to file COS (Feb 25-16) | 2016/09/16 | NoA | Decision and Rate Order (Mar 23-16) | 2017/03/23 |
Oakville Hydro Electricity Distribution Inc. EB-2016-0097 |
Price Cap IR | OEB Case Management Letter (Oct 20-16) | 2016/08/15 | Decision and Rate Order (Jan 5-17) | 2017/01/05 | |
Orangeville Hydro Limited EB-2016-0098 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/10/14 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Orillia Power Distribution Corp. EB-2016-0099 EB-2016-0321 |
Price Cap IR |
Letter re: 2017 COS deferral (Jan 5-15) OEB Case Management Letter (Oct 7-16) |
2016/09/26 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Oshawa PUC Networks Inc. EB-2016-0323 |
Custom IR - Year 3 Update | OEB Case Management Letter (Dec 12-16) | 2016/10/31 | Decision and Rate Order (Dec 21-16) Final Rate Order (Dec 22-16) |
2016/12/22 | |
Ottawa River Power Corporation EB-2016-0218 |
Price Cap IR | OEB Case Management Letter (Dec 2-16) | 2016/11/29 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Peterborough Distribution Inc. EB-2016-0100 |
COS |
Letter re: COS deferral (Feb 2-17) |
2017/04/01 | |||
PowerStream Inc. EB-2015-0003 (note: PowerStream filed their year 2 update application under their assigned 2016 EB number) |
Custom IR - Year 2 Update | |||||
PUC Distribution Inc. EB-2016-0102 |
Price Cap IR | Letter re: 2017 COS deferral (May 30-16) OEB response re: 2017 COS deferral (Aug 22-16) OEB Case Management Letter (Oct 28-16) |
2016/10/14 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Renfrew Hydro Inc. EB-2016-0166 |
COS | 2016/06/14 | NoA | Decision and Rate Order (Feb 9-17) | 2017/02/09 | |
Rideau St. Lawrence Distribution Inc. EB-2015-0100 |
Price Cap IR | 2016/10/21 | NoA | Decision and Rate Order (Jun 15-17) | 2017/06/15 | |
Sioux Lookout Hydro Inc. EB-2016-0103 |
Price Cap IR | Letter re: 2017 COS deferral (Jan 4-16) OEB response re: 2017 COS deferral (Mar 22-16) OEB Case Management Letter (Oct 18-16) |
2016/10/03 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
St. Thomas Energy Inc. EB-2016-0104 |
Price Cap IR | OEB Case Management Letter (Sep 7-16) | 2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Thunder Bay Hydro Electricity Distribution EB-2016-0105 |
COS | Letter re: delay in filing (Aug 26-16) | 2016/09/09 | NoA |
Decision and Order (Sep 21-17)
Final Rate Order (Oct 19-17) |
2017/10/19 |
Tillsonburg Hydro Inc. EB-2016-0106 |
Annual IR | Letter re: 2017 COS deferral (Jan 20-16) OEB response re: 2017 COS deferral (Jul 5-16) OEB Case Management Letter (Nov 14-16) |
2016/11/04 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Toronto Hydro-Electric System Limited EB-2016-0254 |
Custom IR - Year 3 Update | OEB Case Management Letter (Oct 18-16) | 2016/08/22 | Decision and Rate Order (Dec 21-16) Final Rate Order (Dec 21-16) |
2016/12/21 | |
Veridian Connections Inc. EB-2016-0107 |
Price Cap IR | OEB Case Management Letter (Nov 18-16) | 2016/11/07 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Wasaga Distribution Inc. EB-2016-0108 |
Price Cap IR | OEB Case Management Letter (Oct 28-16) | 2016/10/14 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Waterloo North Hydro Inc. EB-2016-0109 |
Price Cap IR | OEB Case Management Letter (Sep 6-16) | 2016/08/15 | Decision and Rate Order (Dec 8-16) | 2016/12/20 | |
Welland Hydro Electric System Corp. EB-2016-0110 |
COS | Letter re: delay in filing (Aug 22-16) Letter re: delay in filing (Sep 29-16) |
2016/12/21 | NoA | Decision and Rate Order (May 4-17) | 2017/05/04 |
Wellington North Power Inc. EB-2016-0111 |
Price Cap IR | 2016/10/14 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | ||
West Coast Huron Energy Inc. EB-2016-0112 |
Price Cap IR | Letter re: 2017 COS deferral (Feb 24-16) OEB response re: 2017 COS deferral (Jul 5-16) OEB Case Management Letter (Nov 15-16) |
2016/11/07 | Decision and Rate Order (Mar 30-17) | 2017/03/30 | |
Westario Power Inc. EB-2016-0113 |
Price Cap IR | Letter re: delay in filing (Apr 29-16) Letter re: 2017 COS deferral request (Oct 28-16) OEB Case Management Letter (Feb 16-17) |
2016/12/23 | Decision and Rate Order (Apr 13-17) | 2017/04/13 | |
Whitby Hydro Electric Corporation EB-2016-0114 |
Price Cap IR | Letter re: 2017 COS deferral (Dec 31-15) OEB response re: 2017 COS deferral (Mar 22-16) |
2016/08/15 | NoA | Decision and Rate Order (Dec 8-16) Decision and Rate Order (Dec 22-16) Final Rate Order (Dec 22-16) |
2016/12/22 |
ASSOCIATED DECISIONS
Date |
Issue / Document |
---|---|
Jun 1-17 |
The OEB issued its Decision and Order on the Green Energy Plan Electricity Rate Protection Benefit and Charge (Ontario Regulation 330/09), effective May 1, 2017. |
Apr 25-17 |
The OEB has issued an Order for OESP Credits to all licensed electricity distributors. |
Mar 23-17 |
The OEB has issued a Decision and Order that rescinds the OESP charge as of May 1, 2017 and until further notice. |
Dec 21-16 |
The OEB has issued an Order for OESP Credits. The OESP credits will remain at the current level for January 1, 2017. |
Dec 15-16 |
The OEB has issued a Decision and Order setting regulatory charges effective January 1, 2017, including the charge for the Ontario Electricity Support Program. |
UPDATES
Date |
Issue / Document |
---|---|
May 5-17 |
The OEB has issued a letter re: Review of Fixed Monthly Charge for microFIT Generator Service Classification. |
Oct 27-16 |
The OEB has issued a letter which sets out the Cost of Capital Parameter Updates for Cost of Service Applications with Rates effective in 2017.
|
Oct 27-16 |
Consistent with the policy determinations set out in the Report of the Board on Rate Setting Parameters and Benchmarking under the Renewed Regulatory Framework for Ontario's Electricity Distributors (EB-2010-0379) (Issued November 21, 2013 and updated December 4, 2013), the OEB has calculated the value of the inflation factor for incentive rate setting under the Price Cap IR and Annual Index plans, for rate changes effective in 2017, to be 1.9%. The derivation of this is shown in the following table. The OEB will adjust the price escalator in each applicable electricity distributor's 2017 Incentive Regulation Mechanism model such that this inflationary adjustment is reflected in distribution rate changes resulting from Price Cap IR and Annual Index applications effective in 2017.
Sources:
Data accessed August 31, 2016 |
Aug 23-16 |
The OEB has posted an updated version of the Tariff Schedule and Bill Impacts Model (Version 1.02) below (under the Jul 8-16 entry). This model is applicable to 2017 cost of service applications. The model fixes the following:
Users are reminded to follow the posted instructions. Also, entries on the model should be keyed – rates entered as numbers, rather than linking cells to other models. Enquires should be addressed through the OEB’s Industry Relations Enquiry form. |
Aug 4-16 |
The OEB has issued updated Revenue Requirement Work Form (RRWF) and the Lost Revenue Adjustment Mechanism Variance Account (LRAM) models. These models reflect feedback received at and subsequent to the July 28, 2016 Orientation session. The updated models can be accessed through the links on the Jul-8-16 entry below. The RRWF has been updated to correct certain cell formulae on Sheet 11 – Cost Allocation pertaining to row 51. The corrections affect presentation of certain information, but do not affect the calculations of the revenue requirement through to rates on the RRWF. For utility staff who have already populated Version 7.01 of the RRWF, you may wish to contact OEB staff to make the necessary changes. For the LRAMVA, Tab 3: Distribution Rates has been updated for the example rate years, and a comment added to indicate that LDCs can adjust the rate class-specific LRAMVA threshold amounts to align with any approved amounts that may be found in a Settlement Agreement. |
Jul 26-16 |
The OEB is holding an orientation session on July 28th for electricity distributors that will file a cost of service or custom IR application for 2017 – January 2018. The session materials are below: |
Jul 26-16 |
The OEB has posted the 2017 Revenue to Cost Ratio Adjustment Model. |
Jul 25-16 |
The OEB has posted an update to the Income Tax/PILs Work Form applicable for 2017 Cost of Service applications. This corrects calculations of CEC. The OEB has also posted the Checklist applicable to 2017 Cost of Service applications. The OEB has also posted an updated version of the LRAMVA Work Form to correct certain formulae and to provide additional guidance on how the spreadsheets should be filled out. Links to these spreadsheets are posted under the Jul 8-16 entry below. |
Jul 21-16 |
The OEB has posted the following updated models related to 2017 Cost of Service applications: RRWF Version 7.01, PILs Model Version 1.01, Chapter 2 Appendices Version 2.301, Deferral and Variance Account (DVA) Continuity Model Version 2.8, Cost Allocation Model Version 3.4. These correct minor errors based on testing and feedback received. For the Chapter 2 Appendices, only Appendix 2-IB has been updated. The updated models are accessible through the links under the Jul 8-16 entry. |
Jul 21-16 |
The OEB has posted the 2017 IRM Rate Generator Model.
|
Jul 14-16 |
The OEB has issued updated versions of Chapters 1, 2 and 3 of the Filing Requirements for Electricity Distribution Rate Applications for 2017 rates.
|
The OEB has issued versions of the Chapter 2 Appendices and various Models to be used for 2017 Cost of Service Applications. The models are considered final. Queries regarding the models should be sent using the Industry Relations Enquiry form. Cost of Service Models:
|
|
May 19-16 |
The OEB has issued a Report that updates the policy related to the Lost Revenue Adjustment Mechanism Variance Account (LRAMVA) calculation and the application of peak demand savings from Conservation and Demand Management (CDM) Programs. |
Dec 29-15 |
The OEB has issued a letter identifying a preliminary list of distributors that are scheduled to file a cost of service application in respect of 2017 and 2018 rates under the Price Cap Incentive Rate-setting method. This letter also sets out the deadlines by which notice must be given to the OEB in respect of various matters relating to the setting of 2017 rates, and by which cost of service applications for 2017 rates are expected to be filed. |