Search
Content types
Keywords
Date
Enbridge Gas 2023 Panhandle Regional Expansion Project (EB-2022-0157) - Technical Conference
Reliability and Power Quality Review (RPQR) - Loss of Supply Reporting Subgroup Meeting #3
Whats new - 2022-09-29
Whats new - 2022-09-29
Whats new - 2022-09-29
Whats new - 2022-09-29
EPCOR South Bruce (EB-2022-0184) - Settlement Conference
Whats new - 2022-09-27
Electricity Reporting & Record Keeping Requirements (RRR): Section 2.1.5.3 Supply and Delivery
Provides data related to the total amount of electricity in kWh that has flowed into the distribution system (from the IESO-controlled grid, the distribution system of a host distributor, and all embedded generation facilities) and the dollar amount charged by any host distributor for transmission or low voltage services. Note that the start year for this data file is 2015.
The data points that were left blank by distributors have been populated with zeros.
https://www.oeb.ca/documents/opendata/rrr/2024/2.1.5.3 Supply and Delivery Analysis.xml
Archive:
Data published August 27, 2024
Data published October 6, 2023
Data published September 29, 2022
Electricity Reporting & Record Keeping Requirements (RRR): Section 2.1.5.4 Demand and Revenue
Provides data related to a distributor’s annual billings and energy- related determinants (i.e., total consumption (kWh) and demand (kW)) for customers and connections broken down by generic rate class. Note that the start year for this data file is 2015.
The data points that were left blank by distributors have been populated with zeros.
https://www.oeb.ca/documents/opendata/rrr/2024/2.1.5.4 Demand and Revenue.xml
Archive:
Data published January 10, 2025
Data published October 6, 2023
Data published September 29, 2022
Electricity Reporting & Record Keeping Requirements (RRR): Section 2.1.5.5 Utility Characteristics
Provides data regarding a distributor’s licensed service area (both rural and urban), maximum monthly peak load (summer and winter peak load with and without embedded generation), average peak load (with and without embedded generation), average load factor (with and without embedded generation), and overheard and underground circuit kilometers broken down by primary and secondary lines. Note that primary and secondary breakdown is only available after 2019. The other data points are available from 2015 onwards.
The data points that were left blank by the distributors have been populated with zeros.
https://www.oeb.ca/documents/opendata/rrr/2024/2.1.5.5 Utility Characteristics.xml
Archive:
Data published August 27, 2024
Date published October 6, 2023
Data published September 29, 2022
FAQs
Use it to find case-related documents: Regulatory Document Search (RDS)
We want to hear from you. Learn more here.
We have programs that can help. See if you qualify.