Archived decisions

2014

Electricity Decisions

Date Applicant Case # Description and documents

Dec 19, 2014

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge

EB-2014-0347

The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2015.

 

Decision with Reasons and Rate Order

Dec 18, 2014

Great Lakes Power Transmission Inc.

EB-2014-0238

The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2015 and 2016 Transmission Revenue Requirement.

 

Decision and Order

Dec 18, 2014

Canadian Niagara Power Inc.

EB-2014-0204

The Board has issued an Order for Interim Rates on Canadian Niagara Power Inc.'s 2015 and 2016 Transmission Revenue Requirement.

 

Order for Interim Rates

Nov 20, 2014

Ontario Power Generation

EB-2013-0321

The Board has issued its Decision regarding Ontario Power Generation’s payment amounts for its regulated hydroelectric and nuclear generating facilities.

 

Decision with Reasons

Nov 6, 2014

Ontario Power Authority

EB-2013-0326

The Board has issued its Decision and Order on OPA's application for a review of its proposed expenditure and revenue requirements and fees for the year 2014.

 

Decision and Order

Jul 18, 2014

In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge, effective July 1, 2014.

EB-2014-0222

The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge effective July 1, 2014.

 

Decision with Reasons and Order

May 22, 2014

Independent Electricity System Operator

EB-2013-0381

The Board has issued its Decision and Order on an application by the Independent Electricity System Operator for the approval of its proposed expenditure and revenue requirements and its proposed fees for the 2014 fiscal year.

 

Decision and Order

Jan 16, 2014

In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2014.

EB-2014-0005

The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2014.

Jan 9, 2014

Hydro One Networks Inc.

EB-2012-0031

The Board has issued its Rate Order for the 2014 Ontario Uniform Transmission Rates.

 

Rate Order

Gas Decisions

Date Applicant Case # Description and documents

Dec 19, 2014

Enbridge Gas Distribution Inc.

EB-2014-0348

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2015.

 

Decision and Interim Order

 

For more information about current natural gas rates, click here...

Dec 19, 2014

Union Gas Limited

EB-2014-0356

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2015.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Dec 19, 2014

Natural Resource Gas Limited

EB-2014-0358

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2015.

 

Decision and Interim Rate Order

 

For more information about current natural gas rates, click here...

Dec 18, 2014

Union Gas Limited

EB-2014-0271

The Board has issued its Decision and Order on an application by Union Gas Limited for an order or orders approving a multi-year incentive rate mechanism to determine rates for distribution, transmission and storage of gas effective January 1, 2015.

 

Decision and Rate Order

Sep 25, 2014

Union Gas Limited

EB-2014-0208

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2014.

 

Decision and Interim Order

 

Final Decision and Order (Nov 20-14)

 

For more information about current natural gas rates, click here...

Sep 25, 2014

Natural Resource Gas Limited

EB-2014-0206

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 25, 2014

Enbridge Gas Distribution Inc.

EB-2014-0191

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Aug 22, 2014

Enbridge Gas Distribution Inc.

EB-2012-0459

The Board has issued its Decision and Rate Order on an application by Enbridge Gas Distribution Inc. for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas commencing January 1, 2014.

 

Decision and Rate Order

 

Accounting Order

Aug 14, 2014

Board initiated proceeding

EB-2014-0199

The Board has issued its Decision and Order on its proceeding to review the Quarterly Rate Adjustment Mechanism process for natural gas distributors.

 

Decision and Order

Jul 17, 2014

Enbridge Gas Distribution Inc.

EB-2012-0459

The Board has issued its Decision with Reasons in an application for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas commencing January 1, 2014 to 2018.

 

Decision with Reasons

Jun 26, 2014

Enbridge Gas Distribution Inc.

EB-2014-0039

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2014.

 

Final Rate Order

 

For more information about current natural gas rates, click here...

Jun 19, 2014

Union Gas Limited

EB-2013-0109

The Board has issued its Decision and Rate Order on an application by Union Gas Limited for an order or orders clearing certain non-commodity related deferral accounts and sharing utility earnings pursuant to a Board approved earnings sharing mechanism.

 

Final Decision and Rate Order

May 22, 2014

Enbridge Gas Distribution Inc.

EB-2014-0039

The OEB announced that it will extend the period for which most Ontario residential customers of Enbridge Gas Distribution are required to pay for unexpected, high prices incurred during the cold winter months.

 

Decision and Order

May 8, 2014 Union Gas Limited EB-2013-0109

The Board has issued its Decision in an application for an order or orders clearing certain deferral accounts and sharing utility earnings pursuant to a Board-approved earnings sharing mechanism. The Decision also addresses a review of the Board's Decision and Order in EB-2011-0210 requiring Union to annually prepare and file separate audited financial statements for that portion of its business that is subject to rate regulation.

 

Decision

Apr 2, 2014

Natural Resource Gas Limited

EB-2014-0053

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2014.

 

Decision and Interim Order (Apr 1-14)

 

Interim Rate Order (Apr 2-14)

 

For more information about current natural gas rates, click here...

Mar 27, 2014

Enbridge Gas Distribution Inc.

EB-2014-0039

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2014.

 

Decision and Interim Order

 

For more information about current natural gas rates, click here...

Mar 21, 2014

Union Gas Limited

EB-2014-0050

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jan 30, 2014 Enbridge Gas Distribution Inc. and Union Gas Limited

EB-2012-0451

The Board has issued its Decision on the combined GTA-Parkway Proceeding regarding applications filed by Enbridge Gas Distribution Inc. and Union Gas Limited for leave to construct.

 

Decision and Order

2013

Electricity Decisions

Date Applicant Case # Description and documents

Dec 19, 2013

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge

EB-2013-0396

The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2014.

 

Decision and Rate Order

Dec 19, 2013

Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP

EB-2012-0300

The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2014 Transmission Revenue Requirement.

 

Decision and Order

Oct 8, 2013

K2 Wind Ontario Limited Partnership

EB-2012-0458

The Board has issued its Decision and Order on an application by K2 Wind Ontario Limited Partnership for an Order granting leave to construct a new transmission line and associated facilities.

 

Decision and Order

Aug 7, 2013

In the matter of a Board-initiated proceeding to designate an electricity transmitter to undertake development work for a new electricity transmission line between Northeast and Northwest Ontario: the East-West Tie Line

EB-2011-0140

The Board has chosen Upper Canada Transmission Inc. as the transmitter to complete development work for the East-West Tie Line.

 

Phase 2 Decision and Order

Jul 10, 2013

In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2013.

EB-2013-0231

The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2013.

 

Decision with Reasons and Order

Mar 28, 2013

Independent Electricity System Operator as Smart Metering Entity

EB-2012-0100

EB-2012-0211

The Board has issued its Decision and Order on an Application by the Independent Electricity System Operator for an Order fixing a Smart Metering Entity charge effective May 1, 2013.

 

Effective May 1, 2013, the SME charge to be levied and collected by the licensed electricity distributors identified in the Board’s annual Yearbook of Electricity Distributors from Residential and General Service <50kW customers shall be $0.79 per month. The SME charge shall be in effect from May 1, 2013 to October 31, 2018.

 

Decision and Order

Gas Decisions

Date Applicant Case # Description and documents

Dec 20, 2013

Enbridge Gas Distribution Inc.

EB-2013-0406

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Dec 19, 2013

Union Gas Limited

EB-2013-0413

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Dec 16, 2013

Natural Resource Gas Limited

EB-2013-0412

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2014.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Oct 7, 2013

Union Gas Limited

EB-2013-0202

The Board has issued its Decision and Order on an application by Union Gas Limited for an order or orders approving a multi-year incentive rate mechanism to determine rates for distribution, transmission and storage of gas effective January 1, 2014.

 

Decision and Order

Sep 23, 2013

Enbridge Gas Distribution Inc.

EB-2013-0295

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 19, 2013

Natural Resource Gas Limited

EB-2013-0317

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 19, 2013

Union Gas Limited

EB-2013-0316

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 12, 2013

Natural Resource Gas Limited

EB-2013-0183

The Board has issued its Rate Order on an application by Natural Resource Gas Limited for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas effective October 1, 2013.

 

Decision and Order (issued Aug 22, 2013)

 

Rate Order

Jul 4, 2013

Enbridge Gas Distribution Inc.

EB-2012-0394

The Board has issued its Decision and Order on Settlement Agreement in an application by Enbridge Gas Distribution Inc. seeking approval to update its Demand Side Management Plan

 

Decision and Order on Settlement Agreement

Jun 25, 2013

Enbridge Gas Distribution Inc.

EB-2013-0206

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jun 20, 2013

Natural Resource Gas Limited

EB-2013-0205

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective July 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jul 19, 2013

Union Gas Limited

EB-2013-0215

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective July 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

May 2, 2013

Enbridge Gas Distribution Inc.

EB-2012-0055

The Board has issued its Decision and Order in an application by Enbridge Gas Distribution Inc. for an order or orders approving the clearance or disposition of amounts recorded in certain deferral or variance accounts.

 

Decision and Order

Mar 21, 2013

Enbridge Gas Distribution Inc.

EB-2013-0045

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Mar 20, 2013

Natural Resource Gas Limited

EB-2013-0052

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Mar 19, 2013

Union Gas Limited

EB-2012-0337

The Board has issued its Decision and Order on Union Gas Limited`s 2013-2014 Large Volume Demand Side Management Plan.

Decision and Order

Mar 19, 2013

Union Gas Limited

EB-2013-0033

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Feb 28, 2013

Union Gas Limited

EB-2012-0087

The Board has issued its Decision and Rate Order on an application by Union Gas Limited for an Order or Orders amending or varying the rate or rates charged to customers as of October 1, 2012.

 

Decision and Rate Order

Jan 17, 2013

Union Gas Limited

EB-2011-0210

The Board has issued its Decision and Rate Order approving just and reasonable rates and other charges for Union Gas Limited for the sale, distribution, transmission and storage of natural gas commencing January 1, 2013.

 

Decision and Rate Order

2012

Electricity Decisions

Date Applicant Case # Description and documents

Dec 20, 2012

Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP

EB-2012-0300

The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2013 Transmission Revenue Requirement.

 

Decision and Order

Dec 20, 2012

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2013

EB-2012-0453

The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2013.

 

Decision with Reasons and Rate Order

Dec 20, 2012

Hydro One Networks Inc.

EB-2012-0031

The Board has issued its Rate Order for 2013 Ontario Uniform Transmission Rates.

 

Rate Order

Sep 13, 2012

Canadian Distributed Antenna Systems Coalition

EB-2011-0120

The Board has issued its Decision on Preliminary Issue and Order with respect to an application by the Canadian Distributed Antenna Systems Coalition (CANDAS) for access to LDC power poles.

 

Decision on Preliminary Issue and Order

Jun 7, 2012

Toronto Hydro-Electric System Limited

EB-2012-0079

The Board has released its Decision and Order regarding Toronto Hydro-Electric System Limited’s application seeking approval to establish a deferral account.

 

Decision and Order

Apr 3, 2012

Hydro One Remote Communities Inc.

EB-2011-0427

The Board has issued its Decision on the Hydro One Remote Communities Inc. application to adopt the USGAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, commencing January 1, 2012.

 

Decision and Order

Mar 23, 2012

Hydro One Networks Inc.

EB-2011-0399

The Board has issued its Decision on the Hydro One Networks Inc. application to adopt the USGAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, for its Distribution business, commencing January 1, 2012.

 

Decision and Order

Jan 31, 2012

West Coast
Huron Energy Inc.

EB-2011-0335

The Board has issued its Decision with Reasons on an application by West Coast Huron Energy Inc. for an order approving the recovery of costs caused by tornado damage.

 

Decision with Reasons 

Gas Decisions

Date Applicant Case # Description and documents

Dec 20, 2012

Enbridge Gas Distribution Inc.

EB-2012-0428

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Dec 19, 2012

Natural Resource Gas Limited

EB-2012-0454

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Dec 17, 2012

Union Gas Limited

EB-2012-0437

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2013.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Nov 26, 2012

Enbridge Gas Distribution Inc.

EB-2011-0354

The Board has issued a Decision on Supplementary Settlement Agreement Open Bill Access Program on an application by Enbridge Gas Distribution Inc. for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas commencing January 1, 2013.

 

Decision on Supplementary Settlement Agreement Open Bill Access Program

 

Interim Rate Order (issued Nov 29, 2012)

Oct 25, 2012

Union Gas Limited

EB-2011-0210

The Board has issued its Decision and Order approving just and reasonable rates and other charges for Union Gas Limited for the sale, distribution, transmission and storage of natural gas commencing January 1, 2013.

 

Decision and Order

Oct 18, 2012

Union Gas Limited

EB-2012-0360

The Board has issued a Decision and Order on Motion to Review and Vary a previous Board Decision (EB-2012-0206) related to the issue of calculating the amount of margin sharing in the Short-Term Storage Account.

 

Decision and Order on Motion to Review and Vary

Sep 24, 2012

Enbridge Gas Distribution Inc.

EB-2012-0352

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 20, 2012

Natural Resource Gas Limited

EB-2012-0364

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Sep 19, 2012

Union Gas Limited

EB-2012-0345

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jul 18, 2012 Union Gas Limited EB-2012-0206

The Board has issued its Decision and Order on a Board Motion to determine the accuracy of the calculation of margin sharing related to Deferral Account 179-70 – Short-Term Storage and Other Balancing Services which was originally approved by the Board in the Union Gas Proceeding - EB-2011-0038.

 

Decision and Order on Board Motion

Jun 21, 2012

Natural Resource Gas Limited

EB-2012-0262

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective July 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jun 21, 2012

Enbridge Gas Distribution Inc.

EB-2012-0238

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

Jun 19, 2012

Union Gas Limited

EB-2012-0249

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective July 1, 2012.

 

Decision and Order

 

For more information about current natural gas rates, click here...

May 17, 2012

Natural Resource Gas Limited

EB-2010-0018

The Board has issued its Decision and Order - Phase 2 on an application by Natural Resource Gas Limited for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas and other discrete issues.

 

Decision and Order - Phase 2

May 10, 2012

Enbridge Gas Distribution Inc.

EB-2011-0277

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2012 under the guidance of the multi-year Incentive Regulation plan methodology.

 

Decision and Order

Mar 22, 2012

Enbridge Gas Distribution Inc.

EB-2012-0054

The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2012.

 

Decision and Order

Mar 21, 2012

Natural Resource Gas Limited

EB-2012-0069

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2012.

 

Decision and Order

Mar 19, 2012

Union Gas Limited

EB-2012-0070

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2012.

 

Decision and Order

Mar 1, 2012

Union Gas Limited

EB-2011-0210

The Board has issued its Decision on the Preliminary Issue and Procedural Order No. 2 for Union’s 2013 Cost of Service Proceeding.

 

Decision on Preliminary Issue and Procedural Order No. 2

Feb 23, 2012

Union Gas Limited

EB-2011-0025

The Board has issued a Partial Decision and Order on Union Gas Limited’s 2012 IRM application.

 

Partial Decision and Order (issued Feb 23, 2012, corrected Mar 1, 2012)

 

Partial Decision and Rate Order (issued Dec 2, 2011)

Jan 20, 2012

Union Gas Limited

EB-2011-0038

The Board has issued a Decision and Order on Union Gas Limited’s 2010 Earning Sharing Mechanism and 2010 Deferral Account Disposition proceeding. The Decision also includes approvals for a cost allocation methodology to be used to allocate costs between Union’s utility and non-utility storage businesses.

 

Decision and Order

2011

Electricity Decisions

Date Applicant Case # Description and documents

Dec 21, 2011

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2012.

EB-2011-0405

The Board has issued a decision and order setting the Charge for Rural or Remote Electricity Rate Protection for 2012.

 

Decision with Reasons

Dec 20, 2011

Hydro One Networks Inc.

EB-2011-0268

The Board has issued its Rate Order for 2012 Ontario Uniform Transmission Rates.

 

Rate Order

Dec 9, 2011

PowerStream Inc.

EB-2011-0128

The Board has issued a Decision and Order on an application by PowerStream Inc. for an order or orders approving or fixing a just and reasonable distribution rates related to Smart Meter deployment, to be effective November 1, 2011.

 

Decision and Order (corrected Dec 9-11)

 

Rate Order

Dec 8, 2011

Consumers Council of Canada

EB-2010-0184

The Board has issued a Decision and Order dismissing a motion from the Consumers Council of Canada seeking a finding that the Special Purpose Charge is unconstitutional.

 

Decision and Order

Nov 23, 2011 Hydro One Networks Inc. EB-2011-0268

The Board has issued its Decision on the application by Hydro One Networks Inc. to adopt the US GAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, for its transmission business commencing January 1, 2012.

 

Decision and Order

Nov 2, 2011 TransCanada Power Transmission (Ontario) L.P. EB-2011-0260

The Board issued a Decision and Order amending TransCanada Power Transmission (Ontario) L.P.’s electricity transmission licence by changing the effective date of the licence to the earlier of:

  • the date upon which TransCanada Transmission is designated as a developer of transmission assets in Ontario pursuant to a Board designation process; and
  • the date upon which TransCanada Transmission applies to own or operate a transmission system by seeking to amend schedule 1 of its licence to specify the facilities to be owned and/or operated by TransCanada Transmission.

 

Decision & Order

 

Licence

 

Aug 3, 2011

Toronto Hydro Energy Services Inc.

Toronto Hydro-Electric System Limited

1798594 Ontario Inc.

EB-2009-0180

EB-2009-0181

EB-2009-0182

EB-2009-0183

The Board has issued a Decision and Order relating to the transfer of certain streetlighting assets in the City of Toronto (found to be distribution assets by the Board in its Decision and Order dated February 11, 2010) from Toronto Hydro Energy Services Inc. to Toronto Hydro-Electric System Limited.

 

Decision and Order

Jun 24, 2011

Ontario Energy Board

EB-2008-0381

The Board has issued its Decision and Order on the combined proceeding to determine the accuracy of the final account balances with respect to Account 1562 Deferred Payments in Lieu of Taxes for EnWin Utilities Ltd., Halton Hills Hydro Inc., and Barrie Hydro Distribution Inc. (PowerStream Inc.).

 

Decision and Order

May 24, 2011

Chatham-Kent Transmission Inc.

EB-2010-0351

The Board issued a Decision and Order in an application by Chatham-Kent Transmission Inc. for an electricity transmission licence.

 

Decision and Order

 

Licence

May 20, 2011

ACH Limited Partnership

EB-2011-0065

EB-2011-0068

The Board issued its Decision and Order in an application by ACH Limited Partnership to amend its electricity generator licence.

 

Decision and Order

May 6, 2011

Ontario Waterpower Association

EB-2011-0067

On May 5, 2011, the Board made an oral Decision and Order on an application filed by the Ontario Waterpower Association under section 74(1)(b) of the Ontario Energy Board Act, 1998, to amend the distribution licence of Hydro One Networks Inc. to exempt Hydro One from sections 6.2.4.1(e)(i) and 6.2.18(a) of the Distribution System Code for waterpower generation facilities and to substitute a special rule for waterpower generation facilities.

 

The full Decision with Reasons is available in the transcript of the proceeding (volume 2) beginning at page 55:

 

Hearing Transcript

Apr 25, 2011

Independent Electricity System Operator

EB-2010-0046

The Board has rendered an oral Decision on an application by the Independent Electricity System Operator (the “IESO”) for the approval of its proposed expenditure and revenue requirements and its proposed fees for the 2011 fiscal year.

 

The Board accepted the parties’ settlement proposal in which the parties had reached agreement on all issues except Issue 3.3 concerning the amount of the accumulated operating surplus that should be retained by the IESO as an operating reserve. The IESO had proposed retaining $13.1 million of the total accumulated surplus of $23.3 million. The Board denied that amount and instead decided that the IESO should retain $5 million as an operating reserve and return the remainder, estimated at $18.3 million, to the market participants in the next billing period (May 2011).

 

Hearing Transcript (see page 10 for Decision on Settlement Proposal and page 50 for Decision on Issue 3.3)

 

Settlement Proposal

Mar 25, 2011

Toronto Hydro-Electric System Limited

EB-2010-0354

The Board has issued a Decision and Order on Motion from Toronto Hydro-Electric System Limited in relation to the Board’s October 29, 2010 Decision (EB-2010-0193) on Toronto Hydro’s application for contact voltage cost recovery.

 

Decision and Order on Motion

Mar 10, 2011

Ontario Power Generation

EB-2010-0008

The Board has issued its Decision regarding Ontario Power Generation’s payment amounts for its regulated hydroelectric and nuclear generating facilities.

 

Decision with Reasons

Mar 8, 2011

Horizon Utilities Corporation

EB-2010-0292

The Board has issued a Decision and Order regarding an application by Horizon Utilities Corporation for an increased Smart Meter Funding Adder.

 

Decision and Order

Feb 28, 2011

Directive - Minister of Energy

EB-2011-0055

The Board has issued a Decision and Order regarding a Directive from the Minister of Energy requiring the Ontario Energy Board to amend Hydro One Networks Inc.'s transmission licence.

 

Decision and Order (corrected Mar 1, 2011)

 

Cover Letter Errata

 

Errata Sheet

 

Feb 22, 2011

Ontario Energy Board

EB-2010-0295

The Board has issued its Decision and Order in the Late Payment Penalty Generic hearing.

 

Decision and Order

Jan 17, 2011

Hydro One Networks Inc.

EB-2010-0002

The Board has issued its Rate Order for 2011 Ontario Uniform Transmission Rates.

 

Rate Order (Revised Jan 18-11)

Gas Decisions

Date Applicant Case # Description and documents

Dec 21, 2011

Natural Resource Gas Limited

EB-2011-0392

The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2012.

 

Decision and Order

Dec 21, 2011

Enbridge Gas Distribution Inc

EB-2011-0390

The Board has approved changes to the prices Enbridge Gas Distribution Inc will charge its customers for natural gas effective January 1, 2012.

 

Decision and Order

Dec 16, 2011

Union Gas Limited

EB-2011-0382

The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2012.

 

Decision and Order

Dec 2, 2011

Union Gas Limited

EB-2011-0025

The Board has issued a Partial Decision and Rate Order on Union Gas Limited's 2012 IRM application.

 

Partial Decision and Rate Order

Sep 22, 2011 Enbridge Gas Distribution Inc EB-2011-0296

The Board has approved changes to the natural gas rates Enbridge Gas Distribution Inc. will charge its customers effective October 1, 2011.

 

Decision and Order

Sep 20, 2011 Natural Resource Gas Limited EB-2011-0301

The Board has approved changes to the natural gas rates Natural Resource Gas Limited will charge its customers effective October 1, 2011.

 

Decision and Order

Sep 19, 2011

Union Gas Limited

EB-2011-0297

The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective October 1, 2011.

 

Decision and Order

Jul 25, 2011

Union Gas Limited

EB-2011-0040

EB-2011-0041

EB-2011-0042

The Board has granted Union Gas Limited leave to construct approximately 100 kilometres of natural gas pipeline and ancillary facilities to the Red Lake District northwest of Kenora.

 

Decision with Respect to Preliminary Questions and Final Decision and Orders

Jul 19, 2011

Union Gas Limited

EB-2011-0013

EB-2011-0014

EB-2011-0015

The Board has issued its Decision with Reasons approving the Union Gas application for the designation, construction and operation of the Jacob Storage Pool in Southwestern Ontario.

 

Decision with Reasons

Jun 22, 2011

Enbridge Gas Distribution Inc.

EB-2011-0129

The Board has approved changes to the natural gas prices Enbridge Gas Distribution Inc. charges its customers effective July 1, 2011.

 

Decision and Order

Jun 20, 2011

Union Gas Limited

EB-2011-0135

The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective July 1, 2011.

 

Decision and Order

Jun 14, 2011

Natural Resource Gas Limited

EB-2011-0208

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective July 1, 2011.

 

Decision and Order

Mar 22, 2011

Enbridge Gas Distribution Inc.

EB-2011-0051

The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective April 1, 2011.

 

Decision and Order

Mar 22, 2011

Natural Resource Gas Limited

EB-2011-0059

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective April 1, 2011.

 

Decision and Order

Mar 22, 2011

Enbridge Gas Distribution Inc.

EB-2010-0302

The Board has issued its Decision and Order with respect to an application by Enbridge Gas Distribution Inc. for construction of several pipelines as part of Enbridge’s storage enhancement project in St. Clair Township.

 

Decision and Order

Mar 22, 2011

King Township

EB-2011-0024

The Board has issued its Decision on a Motion by King Township for a review of the Board’s Decision and Order approving the construction of the Enbridge Gas Distribution Inc. pipeline to serve the York Energy Centre.

 

Decision

Mar 17, 2011

Union Gas Limited

EB-2011-0029

The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective April 1, 2011.

 

Decision and Order

Feb 17, 2011

Natural Resource Gas Limited

EB-2010-0018

The Board has issued its Decision approving just and reasonable rates and other charges for Natural Resource Gas for the sale, distribution, transmission and storage of natural gas for the 2011 fiscal year.

 

Rate Order

2010

Electricity Decisions

Date Applicant Case # Description and documents

Dec 23, 2010

Hydro One Networks Inc.

EB-2010-0002

The Board has issued a Decision with Reasons on an application by Hydro One Networks Inc. for an order or orders approving a transmission revenue requirement and rates and other charges for the transmission of electricity for 2011 and 2012.

 

Decision with Reasons

Dec 21, 2010

In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2010 as required under Section 79(1) of the Ontario Energy Board Act, 1998 and Ontario Regulation 330/09.

EB-2010-0191

The Board has issued a decision setting the Renewable Generation Connection Rate Protection compensation amount for 2011 pursuant to O. Reg. 330/09.

 

Decision with Reasons

Dec 20, 2010

Hydro One Networks Inc.

EB-2010-0229

The Board has issued a Decision and Order on a licence amendment application filed by Hydro One Networks Inc.

 

Decision and Order

Dec 20, 2010

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2011.

EB-2010-0397

The Board has issued a decision setting the rate for Rural or Remote Electricity Rate Protection for 2011.

 

Decision with Reasons

Dec 17, 2010

Hydro One Networks Inc.

EB-2010-0228

The Board has issued a Decision and Order for Hydro One Networks Inc. for new Joint Use charges related to generation projects and new and revised fees for a Connection Impact Assessment.

 

Decision and Order

Dec 13, 2010

PowerStream Inc.

EB-2010-0209

The Board has approved adjusted distribution rates for PowerStream Inc. to include smart meter related costs incurred to install 137,356 smart meters in 2008 and 2009. The new rates are effective January 1, 2011.

 

Rate Order

Dec 2, 2010

Ontario Power Authority

EB-2010-0220

The Board has issued a Decision and Order and a Licence on a licence application filed by the Ontario Power Authority.

 

Decision and Order

 

Licence

Nov 19, 2010

PowerStream Inc.

EB-2010-0209

The Board has issued a Decision and Order in the matter of PowerStream Inc.’s Smart Meter Cost Recovery Application for meters installed in 2008 and 2009.

 

Decision and Order (corrected version posted Nov 22-10)

Nov 18, 2010

Summitt Energy Management Inc.

EB-2010-0221

The Board has issued an administrative penalty and costs totaling up to $299,000 against Summitt Energy Management related to sales agent activities that contravened the Ontario Energy Board Act,1998.

 

Decision and Order

Nov 11, 2010

Toronto Hydro-Electric System Limited

EB-2010-0193

The Board has announced electricity distribution rates for Toronto Hydro-Electric System Limited. The new rates are effective November 1, 2010.

 

Rate Order

Nov 1, 2010

Five Nations Energy Inc.

EB-2009-0387

The Board has issued its Decision and Order on an application by Five Nations Energy Inc. for 2010 transmission rates

 

Decision and Order

Oct 29, 2010

Toronto Hydro-Electric System Limited

EB-2010-0193

The Board has issued a Decision on an application by Toronto Hydro-Electric System Limited for recovery of approved costs incurred for the emergency correction of contact voltage conditions on its system.

 

Decision

Aug 5, 2010

Consumers Council of Canada

Canadian Manufacturers and Exporters

EB-2010-0184

The Board has issued a Decision with Reasons dismissing a motion by the Canadian Manufacturers and Exporters to stay assessments of the Special Purpose Charge pending a hearing on the constitutionality of the assessments. The motion had been dismissed in a decision with reasons to follow issued on July 26.

 

Decision with Reasons

 

Decision (July 26, 2010)

Mar 24, 2010

Horizon Utilities Corporation

EB-2009-0332

The Board has issued a Decision in the matter of Horizon Utilities Corporation’s application for an order approving the recovery of certain amounts related to an unforeseen loss of revenue to be effective May 1, 2010.

 

Decision

Mar 23, 2010

York Energy Centre LP

EB-2009-0242

The Board has issued a Decision and Order in the matter of York Energy Centre LP’s application for an electricity generation licence.

 

Decision and Order

 

Licence

Mar 17, 2010

Ontario Energy Board

EB-2009-0326

The Board has approved a province-wide fixed monthly charge for all electricity distributors related to the microFIT Generator rate class at $5.25 per month, effective September 21, 2009.

 

Rate Order

Feb 23, 2010

Ontario Energy Board

EB-2009-0326

The Board has issued a Decision and Order with respect to a just and reasonable rate to be charged by an electricity distributor for the recovery of costs associated with a microFIT generator, i.e. an electricity generation facility contracted under the Ontario Power Authority’s microFIT program and connected to the distributor’s system.

 

Decision and Order

Feb 22, 2010

Toronto Hydro-Electric System Limited

EB-2009-0308

The Board has issued a Compliance Order against Toronto Hydro-Electric System Limited, which will ensure new condominiums have access to choice for smart meter suppliers.

 

Compliance Order

Feb 11, 2010

Toronto Hydro-Electric System Limited

Toronto Hydro Energy Services Inc.

1798594 Ontario Inc.

EB-2009-0180

 

EB-2009-0181

 

EB-2009-0182

 

EB-2009-0183

An application by 1798594 Ontario Inc. seeking an electricity distribution icence;

 

An application by Toronto Hydro Energy Services Inc. seeking an order granting leave to sell streetlighting assets as an entirety or substantially as an entirety to 1798594 Ontario Inc.;

 

An application Toronto Hydro Energy Services Inc. seeking an order granting leave to sell streetlighting assets necessary in serving he public to 1798594 Ontario Inc.;

 

An application by Toronto Hydro-Electric System Limited and 1798594 ntario Inc. seeking leave to amalgamate;

 

A request by 1798594 Ontario Inc. seeking the cancellation of the distribution licence applied for in a separate application;

 

An application by 1798594 Ontario Inc. and Toronto Hydro-Electric System Limited for an order assigning Toronto Hydro-Electric System Limited’s electricity distribution licence to a proposed amalgamated entity consisting of 1798594 Ontario Inc. and Toronto Hydro-Electric System Limited.

 

Decision and Order

Jan 29, 2010

Enersource Hydro Mississauga Inc.

EB-2009-0405

The Board has issued a Decision and Rate Order approving an application by Enersource Hydro Mississauga Inc. to dispose of several deferral and variance account balances.

 

Decision and Rate Order

Jan 27, 2010

Toronto Hydro-Electric System Limited

EB-2009-0308

The Board has issued a Decision and Order finding that Toronto Hydro-Electric System Limited has failed to connect smart meters to two condominiums in the City of Toronto contrary to section 28 of the Electricity Act, 1998 and various sections of the Distribution System Code.

 

The Board found that Toronto Hydro’s refusal to provide a bulk meter connection, and its requirement that each resident of a condominium become a direct customer of Toronto Hydro, did not comply with the Electricity Act.

 

Decision and Order

Gas Decisions

Date Applicant Case # Description and documents

Dec 21, 2010

Enbridge Gas Distribution Inc.

EB-2010-0347

The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective January 1, 2011.

 

Decision and Order

Dec 21, 2010

Natural Resource Gas Limited

EB-2010-0366

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective January 1, 2011.

 

Decision and Order

Dec 17, 2010

Union Gas Limited

EB-2010-0359

The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective January 1, 2011.

 

Decision and Order

Dec 6, 2010

Natural Resource Gas Limited

EB-2010-0018

The Board has issued its Decision and Order on Natural Resource Gas Limited's 2011 rates.

 

Decision and Order

Sep 23, 2010

Enbridge Gas Distribution Inc.

EB-2010-0258

The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective October 1, 2010.

 

Decision and Order

Sep 17, 2010

Union Gas Limited

EB-2010-0265

The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective October 1, 2010.

 

Decision and Order

Sep 17, 2010

Natural Resource Gas Limited

EB-2010-0268

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective October 1, 2010.

 

Decision and Order

Aug 26, 2010

Enbridge Gas Distribution Inc.

EB-2010-0231

The Board has issued a Decision and Order regarding an application by Enbridge Gas Distribution Inc. for an order or orders approving a system reliability Settlement Agreement.

 

Decision and Order

Jun 28, 2010

Enbridge Gas Distribution Inc.

EB-2010-0186

The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective July 1, 2010.

 

Decision and Order

Jun 18, 2010

Union Gas Limited

EB-2010-0201

The Board has approved changes to the natural gas commodity price Union Gas Limited will charge its customers effective July 1, 2010.

 

Decision and Order

Jun 18, 2010

Natural Resource Gas Limited

EB-2010-0187

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective July 1, 2010.

 

Decision and Order

May 18, 2010

Enbridge Gas Distribution Inc.

EB-2009-0172

The Board issued its Decision relating to an application by Enbridge Gas to approve rates for distribution, transmission and storage of gas commencing January 1, 2010.

 

Decision - Return on Equity for Earnings Sharing and DSM Industrial Pilot Project

May 18, 2010

Natural Resource Gas Limited

EB-2010-0024

The Board granted NRG’s request for an exemption from filings its Service Quality data, as required under the Gas Distribution Access Rule (“GDAR”), for the year 2009 with the exception of that data required under Section 7.3.6.1 of the GDAR. The Board has denied NRG’s request for an exemption from Section 7.3.1 of the GDAR.

 

Decision and Order

May 13, 2010

Union Gas Limited

EB-2010-0154

The Board has approved Union’s request for an exemption from the requirements of Section 90 of the Act for an Order granting Leave to Construct natural gas pipeline and ancillary facilities in the City of Greater Sudbury.

 

Decision and Order

Apr 1, 2010

Universal Energy Corporation

EB-2009-0364

The Board has ordered that the renewal of the gas marketer licence of Universal Energy Corporation be subject to certain conditions, as a result of concerns raised regarding the conduct of the applicant.

 

Decision and Order

Mar 23, 2010

Enbridge Gas Distribution Inc.

EB-2010-0048

The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective April 1, 2010.

 

Decision and Order

Mar 17, 2010

Union Gas Limited

EB-2010-0040

The Board has approved changes to the natural gas commodity price Union Gas Limited will charge its customers effective April 1, 2010.

 

Decision and Order

Mar 16, 2010

Natural Resource Gas Limited

EB-2010-0049

The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective April 1, 2010.

 

Decision and Order

Mar 10, 2010

Dawn Gateway Pipeline Limited Partnership

EB-2009-0422

The Board has approved an application by the Dawn Gateway Pipeline Limited Partnership to construct a 17 kilometre natural gas pipeline and associated facilities in the Townships of St. Clair and Dawn-Euphemia.

 

Decision and Order

Mar 2, 2010

Union Gas Limited

EB-2008-0411

The Board has issued its Decision and Order in regards to an Application by Union Gas Limited pursuant to section 43(1) of the Act, for an Order or Orders granting leave to sell 11.7 kilometers of natural gas pipeline running between the St. Clair Valve Site and Bickford Compressor Site in the Township of St. Clair.

 

Decision and Order

 

Decision and Order (May 11, 2010)

 

Decision and Order (Nov 27, 2009)

Jan 19, 2010

Enbridge Gas Distribution Inc.

EB-2009-0341

The Board has issued its Decision on Enbridge Gas Distribution Inc.’s application to dispose of its 2008 Demand Side Management Variance Accounts.

 

Decision on EGD’s 2008 DSMVA’s

2009

Electricity Decisions

Date Applicant Case # Description and documents

Dec 24, 2009

In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2010.

EB-2009-0419

The Board has issued a decision setting the rate for Rural or Remote Electricity Rate Protection for 2010.

 

Decision with Reasons

Dec 10, 2009

Toronto Hydro-Electric System Limited

EB-2009-0243

The Board has issued a Decision on an application by Toronto Hydro-Electric System Limited for recovery of costs for the emergency correction of contact voltage conditions on its system.

 

Decision (corrected Dec 11, 2009)

Oct 15, 2009

Toronto Hydro-Electric System Limited

EB-2009-0308

On October 14, the Board issued a Decision and Order in response to a Motion filed by Toronto Hydro-Electric System Limited.

 

Decision and Order

Sep 29, 2009

Ontario Energy Savings L.P. / Just Energy Ontario L.P.

EB-2009-0257

The Board has issued a Decision and Order regarding an application filed by Ontario Energy Savings L.P. for a name change amendment to their gas marketer and electricity retailer licences.

 

Decision and Order

Sep 8, 2009

North Bay Hydro Distribution Limited

EB-2009-0113

The Board has denied a request from North Bay Hydro Distribution Limited to establish rate riders for the purpose of collecting revenues based on corrected retail settlement variance account "RSVA" balances.

 

Decision and Order

Aug 25, 2009

Espanola Regional Hydro Distribution Corporation

EB-2009-0056

The Board has issued a Rate Order approving changes to the 2009 electricity distribution rates for Espanola Regional Hydro Distribution Corporation.

 

Rate Order

Aug 25, 2009

In the matter of a motion by VECC requesting the Board to review and vary certain aspects of Decision and Order EB-2008-0233 dated April 6, 2009 and Decision and Order EB-2008-0226 dated April 17, 2009.

EB-2009-0130

The Board has issued a Rate Order to reflect its Decision on VECC’s motions to review and vary its Decisions on 2009 electricity distribution rates for Innisfil Hydro and COLLUS Power.

 

Rate Order

 

Oral Decision (starting on pg. 73 of transcript)

Aug 21, 2009

London Hydro Inc.

EB-2008-0235

The Board has issued its Decision on an application by London Hydro Inc. for 2009 electricity distribution rates.

 

Decision and Order

Aug 13, 2009

IN THE MATTER OF an order or orders authorizing certain distributors to conduct specific discretionary metering activities under section 53.18 of the Electricity Act, 1998, S.O. 1998, c. 15, Schedule A.

EB-2009-0111

The Board has issued a Decision and Order in proceeding EB-2009-0111 commenced on its own motion to determine whether, and if so under what conditions, exempt distributors should be authorized to conduct discretionary metering activities. For purposes of this proceeding, the exempt distributor must distribute electricity on land where a residential complex or an industrial, commercial or office building is located. The discretionary metering activities relate to the installation of smart sub-metering systems.

 

Decision and Order

Aug 13, 2009

Niagara-on-the-Lake Hydro Inc.

EB-2009-0149

The Board has issued a Decision and Order approving revisions to Niagara-on-the-Lake Hydro Inc.’s Retail Transmission Service Rates.

 

Decision and Order

Jul 31, 2009

Espanola Regional Hydro Distribution Corporation

EB-2009-0056

The Board has issued a decision for Espanola’s application to reflect in rates an amount for Payment In Lieu of Taxes. The impact of this application will be an increase of $0.53 on the monthly bill of a typical residential customer effective September 1, 2009.

 

Decision

Jul 27, 2009

Powerstream Inc.

EB-2008-0244

The Board has issued its Decision on an application by Powerstream Inc. for 2009 electricity distribution rates.

 

Decision

Jul 10, 2009

Tillsonburg Hydro Inc.

EB-2008-0246

The Board has issued its Decision on an application by Tillsonburg Hydro Inc. for 2009 electricity distribution rates.

 

Decision

Jul 7, 2009

Welland Hydro-Electric System Corp.

EB-2008-0247

The Board has issued its Decision on an application by Welland Hydro for 2009 electricity distribution rates.

Decision and Order

Jul 6, 2009

In the matter of a motion by VECC requesting the Board to review and vary certain aspects of Decision and Order EB-2008-0233 dated April 6, 2009 and Decision and Order EB-2008-0226 dated April 17, 2009.

EB-2009-0130

The Board has issued an Oral Decision on VECC’s motions to review and vary its Decisions on 2009 electricity distribution rates for Innisfil Hydro and COLLUS Power.

 

Oral Decision (starting on pg. 73 of transcript)

Jun 17, 2009

West Coast Huron Energy Inc.

EB-2008-0248

The Board has issued its Decision on an application by West Coast Huron Energy Inc. for 2009 electricity distribution rates.

 

Decision and Order

Jun 12, 2009

Kitchener-Wilmot Hydro Inc.

EB-2009-0138

The Board has issued an oral Decision on an application pursuant to section 74 of the Ontario Energy Board Act, 1998 by Kitchener-Wilmot Hydro Inc. to amend electricity distribution licence.

 

Oral Decision

 

Full Transcript

Jun 3, 2009

Thunder Bay Hydro Electricity Distribution Inc.

EB-2008-0245

The Board has issued its Decision on an application by Thunder Bay Hydro Electricity Distribution Inc. for 2009 electricity distribution rates.

 

Decision and Order

Jun 1, 2009

Peterborough Distribution Inc.

EB-2008-0241

The Board has issued its Decision on an application by Peterborough Distribution Inc. for 2009 electricity distribution rates.

 

Decision

May 28, 2009

Hydro One Networks Inc.

EB-2008-0272

The Board has issued a Decision and Order regarding an application by Hydro One Networks Inc. for the 2009 and 2010 transmission revenue requirement and rates.

 

Decision

May 15, 2009

Hydro One Networks Inc.

EB-2009-0136

The Board has issued a Decision and Order regarding an application by Hydro One Networks Inc. seeking an order granting leave to sell distribution system assets to Haldimand County Hydro Inc.

 

Decision and Order

May 12, 2009

Midland Power Utility Corporation

EB-2008-0236

The Board has issued its Decision on an application by Midland Power Utility Corporation for 2009 electricity distribution rates.

 

Decision and Order

May 11, 2009

Ontario Power Generation Inc.

EB-2009-0038

The Board has issued its Decision and Order concerning Ontario Power Generation Inc.'s Motion for a review and variance of the Board's Payments Decision (EB-2007, 200905) dated November 3, 2008.

 

Decision and Order

May 8, 2009

Lakeland Power Distribution Ltd.

EB-2008-0234

The Board has issued its Decision on an application by Lakeland Power Distribution Ltd. for 2009 electricity distribution rates.

 

Decision and Order

May 5, 2009

Great Lakes Power Limited, Great Lakes Power Distribution Inc., Great Lakes Power Transmission Inc., Great Lakes Power Transmission LP

EB-2009-0072

EB-2009-0073

EB-2009-0075

The Board has issued a Decision and Order regarding joint applications by Great Lakes Power Limited, Great Lakes Power Distribution Inc. and Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP, for various orders under sections 18, 60, 74, 77(5) and 86(1) of the Ontario Energy Board Act, 1998.

 

Decision and Order

May 5, 2009

Direct Energy Marketing Limited

EB-2009-0117

The Board has issued an Order pursuant to section 112.5 of the Ontario Energy Board Act,1998 that Direct Energy Marketing Limited pay an administrative penalty.

 

Order

Apr 30, 2009

Hydro One Remote Communities Inc.

EB-2008-0232

The Board has issued its Decision on an application by Hydro One Remote Communities Inc. for 2009 electricity distribution rates.

 

Decision and Order

Apr 29, 2009

Centre Wellington Hydro Ltd.

EB-2008-0225

The Board has issued its Decision on an application by Centre Wellington Hydro Ltd. for 2009 electricity distribution rates.

 

Decision and Order

Apr 24, 2009

Universal Energy Corporation

EB-2009-0118

The Board has issued an Order pursuant to section 112.5 of the Ontario Energy Board Act,1998 that Universal Energy Corporation pay an administrative penalty.

 

Order

Apr 24, 2009

Westario Power Inc.

EB-2008-0250

The Board has issued its Decision on an application by Westario Power Inc. for 2009 electricity distribution rates.

 

Decision and Order

Apr 22, 2009

Northern Ontario Wires Inc.

EB-2008-0238

The Board has issued its Decision on an application by Northern Ontario Wires Inc. for 2009 electricity distribution rates.

 

Decision and Order

Apr 17, 2009

IN THE MATTER OF the Board’s Guidelines for Reviewing Electricity LDC Variance and Deferral Accounts pursuant to Section 78 of the Ontario Energy Board Act.

EB-2009-0091

The Board has issued an Order pertaining to the review of balances in the RSVApower account and the RSVApower sub-account Global Adjustment (Account 1588) for all the LDCs listed in Appendix A for the period ending December 31, 2008. The Board finds that there is no requirement for disposition at this time. This Order does not limit the decision making authority of the Board in the review and potential disposition of any specific LDCs Account 1588 that may currently be under review by the Board or where disposition of the balance of Account 1588 has been ordered.

 

Order

Apr 17, 2009

COLLUS Power Corp.

EB-2008-0226

The Board has issued its Decision on an application by COLLUS Power Corp. for 2009 electricity distribution rates.

 

Decision and Order

Apr 9, 2009

EnWin Utilities Ltd.

EB-2008-0227

The Board has issued its Decision on an application by EnWin Utilities Ltd. for 2009 electricity distribution rates.

 

Decision and Order

Apr 7, 2009

Ontario Power Authority

EB-2008-0312

The Board has issued its Decision and Order on an application by the Ontario Power Authority for review and approval of its proposed expenditures and revenue requirement and its proposed fees for the year 2009.

 

Decision and Order

Apr 6, 2009

Innisfil Hydro Distribution Systems Limited

EB-2008-0233

The Board has issued its Decision on an application by Innisfil Hydro Distribution Systems Limited (EB-2008-0233) for 2009 electricity distribution rates.

 

Decision and Order

Mar 31, 2009

Independent Electricity System Operator

EB-2008-0340

The Board has issued its Decision and Order on an application by the Independent Electricity System Operator for review and approval of its proposed revenue requirement, capital expenditures and fees for fiscal 2009.

 

Decision and Order

Mar 25, 2009

Niagara-on-the-Lake Hydro Inc.

EB-2008-0237

Today the Ontario Energy Board issued its Decision on an application by Niagara-on-the-Lake Hydro Inc. (EB-2008-0237) for 2009 electricity distribution rates.

 

Decision and Order

Feb 11, 2009

Town of Cochrane

Northern Ontario Wires Inc.

EB-2008-0339

Today, the Ontario Energy Board issued a Decision and Order approving an application by the Town of Cochrane to acquire all outstanding shares of Northern Ontario Wires Inc.

 

Decision and Order

Feb 9, 2009

Middlesex Power Distribution Corporation

Dutton Hydro Limited

Newbury Power Inc.

EB-2008-0332

EB-2008-0350

Today, the Board issued its Decision and Order regarding an application by Middlesex Power Distribution Corporation to acquire Dutton Hydro Limited and Newbury Power Inc. under section 86(2)(a) of the Ontario Energy Board Act, 1998.

 

Decision and Order

Jan 21, 2009

Summitt Energy Management Inc.

EB-2009-0006

Today the Ontario Energy Board issued an order pursuant to section 112.5 of the Ontario Energy Board Act,1998 (the “Act”) that Summitt Energy Management pay an administrative penalty in the amount of $70,000.00.

 

Order (revised Jan 30, 2009)

Jan 21, 2009

Universal Energy Corporation

EB-2009-0005

Yesterday the Ontario Energy Board issued an order pursuant to section 112.5 of the Ontario Energy Board Act,1998 (the “Act”) that Universal Energy Corporation pay an administrative penalty in the amount of $127,500.00.

 

Order

Jan 20, 2009

Town of Essex

E.L.K. Energy Inc.

EB-2008-0310

Yesterday, the Ontario Energy Board issued an oral Decision approving an application by the Town of Essex to acquire all of the remaining shares in E.L.K. Energy Inc. effective January 31, 2009.

 

Oral Decision

 

Order

 

Full Transcript

Jan 8, 2009

Erie Thames Powerlines Corporation

EB-2008-0375

Today the Ontario Energy Board issued a Decision and Order amending the distribution licence of Erie Thames Powerlines Inc. to reflect an interim exemption from section 6.5.4 of the Board’s Distribution System Code.

 

Decision and Order

2009 Gas Decisions

Date Applicant Case # Description and documents

Dec 22, 2009

Enbridge Gas Distribution Inc.

EB-2009-0172

The Board has issued its Decision on a Preliminary Motion in the Enbridge Gas Distribution Inc. 2010 rates proceeding in which Enbridge sought to include its Green Energy Initiatives project costs in the regulated rates of the utility. The Board’s Decision has denied the costs to be included in the rates.

 

Decision on a Preliminary Motion

Dec 22, 2009

Natural Resource Gas Limited

EB-2009-0407

The Board has approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective January 1, 2010.

 

Decision and Order

Dec 21, 2009

Enbridge Gas Distribution Inc.

EB-2009-0398

The Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2010.

 

Decision and Order

Dec 18, 2009

Union Gas Limited

EB-2009-0410

The Board has approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective January 1, 2010.

 

Decision and Order

Nov 9, 2009 Union Gas Limited EB-2009- 0275

The Board has approved an application by Union Gas Limited for an annual incremental rate adjustment. The change is part of its multi-year incentive rate mechanism for regulated natural gas distribution, transmission and storage services.

 

Decision and Order

Sep 22, 2009

Enbridge Gas Distribution Inc.

EB-2009-0309

The Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2009.

 

Decision and Order

Sep 18, 2009

Methodologies for commodity pricing, load balancing and cost allocation

EB-2008-0106

The Board has issued its Decision and Order in a proceeding initiated by the Board on its own motion to determine methodologies for commodity pricing, load balancing and cost allocation for natural gas distributors.

 

Decision and Order (amended Sep 21-09)

Sep 16, 2009

Natural Resource Gas Limited

EB-2009-0321

The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective October 1, 2009.

 

Decision and Order

Sep 14, 2009

Union Gas Limited

EB-2009-0313

The Board has approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective October 1, 2009.

 

Decision and Order

Aug 10, 2009

Natural Resource Gas Limited

EB-2009-0020

The Board has issued a Decision on an application by Natural Resource Gas Limited for an order or orders to dispose of balances in the non-commodity related deferral accounts as of September 30, 2008.

 

Decision and Order

Jul 14, 2009 Enbridge Gas Distribution Inc. EB-2008-0219

The Board has issued its Decision and Order on the Phase 2 portion of the application by Enbridge Gas Distribution Inc. in the matter of its 2009 rates.

 

Decision and Order

Jun 23, 2009

Enbridge Gas Distribution Inc.

EB-2009-0145

The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective July 1, 2009.

 

Decision and Order

Jun 19, 2009

Natural Resource Gas Limited

EB-2009-0131

The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective July 1, 2009.

Decision and Order

Jun 18, 2009

Union Gas Limited

EB-2009-0147

EB-2009-0101

The Board has approved changes to the rates Union Gas Limited charges its customers effective July 1, 2009.

 

Decision and Order (EB-2009-0147)

 

Decision and Rate Order (EB-2009-0101)

Mar 19, 2009

Natural Resource Gas Limited

EB-2009-0062

Today the Ontario Energy Board approved Changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited (NRG) effective April 1, 2009.

 

Decision and Order

Mar 13, 2009

Enbridge Gas Distribution Inc.

EB-2009-0018

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2009.

 

Decision and Order

Mar 13, 2009

Union Gas Limited

EB-2009-0054

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective April 1, 2009.

 

Decision and Order

Feb 24, 2009

Union Gas Limited

EB-2008-0220

Today the Ontario Energy Board approved changes to the rates Union Gas Limited (Union) charges its customers effective January 1, 2009 arising from Union’s 2009 Rates Application.

 

Decision and Rate Order

Feb 23, 2009

Enbridge Gas Distribution Inc.

EB-2008-0219

Today the Ontario Energy Board approved changes to the rates Enbridge Gas Distribution Inc. charges its customers effective January 1, 2009 arising from Enbridge’s 2009 Rates Application.

 

Rate Order

Jan 29, 2009

Union Gas Limited

EB-2008-0220

Today the Ontario Energy Board issued a Decision with Reasons on an application by Union Gas Limited for 2009 Rates, effective January 1, 2009. The Board directed Union to file a draft rate order reflecting its decision by February 5, 2009.

 

Decision with Reasons

2008

2008 Electricity Decisions

Date Applicant Case # Description and documents

Dec 31, 2008

Town of Essex

EB-2008-0310

Today, the Board issued a majority decision on a threshold issue in the Town of Essex’s application to acquire the remaining shares in E.L.K. Energy Inc. The decision includes a minority dissent and a procedural order outlining the next steps in the proceeding.

 

Decision

Dec 23, 2008

PowerStream Inc.

 

Barrie Hydro Distribution Inc.

EB-2008-0335

The Ontario Energy Board made an oral decision on December 15, 2008 which granted leave to PowerStream and Barrie Hydro to amalgamate.

 

Decision

 

Full Transcript

Dec 18, 2008

Hydro One Networks Inc.

EB-2007-0681

Today the Ontario Energy Board issued its Decision on an application by Hydro One Networks Inc. for 2008 electricity distribution rates. New rates are effective May 1, 2008 and are to be implemented February 1, 2009.

 

Decision

Dec 15, 2008

Ontario Power Generation

EB-2008-0298

On December 15, 2008, the Ontario Energy Board issued an oral decision which approved a Reliability Must Run agreement for Lennox Generating Station for the period October 1, 2008 to September 30, 2009.

 

Decision

 

Full Transcript

Dec 2, 2008

Ontario Power Generation

EB-2007-0905

The Ontario Energy Board today approved Ontario Power Generation’s payment levels for the electricity output of its regulated nuclear and hydroelectric generating assets.

 

Payment Amounts Order

Nov 26, 2008

Chatham-Kent Hydro Inc.

 

Middlesex Power Distribution Corp.

EB-2008-0155

Today the Ontario Energy Board issued its Decision and Order on a joint application by Chatham-Kent Hydro Inc. and Middlesex Power Distribution Corp. for adjusted distribution rates to recover the costs of smart meters installed from May 1 to December 31, 2007. New rates will take effect November 1, 2008, but there is no immediate rate impact for ratepayers served by these distributors.

 

Decision and Order

Nov 3, 2008

Ontario Power Generation Inc.

EB-2007-0905

The Ontario Energy Board has released its decison regarding Ontario Power Generation’s payment levels for the output of its regulated nuclear and hydroelectric generating assets.

 

Decision with Reasons

Oct 30, 2008

Great Lakes Power Limited

EB-2007-0744

Today the Ontario Energy Board issued a Decision on an application by Great Lakes Power Limited for 2007 electricity distribution rates.

 

Decision and Order

Oct 27, 2008

Erie Thames Powerlines Corporation

EB-2007-0928

Today the Ontario Energy Board issued its Decision on an application by Erie Thames Powerlines Corporation for 2008 electricity distribution rates. New rates will take effect when the final Rate Order is issued.

 

Decision and Order

Oct 3, 2008

Horizon Utilities Corporation

EB-2007-0697

Today the Ontario Energy Board issued its Decision on an application by Horizon Utilities Corporation for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

 

Decision

Sep 15, 2008

Hydro One Networks Inc.

EB-2007-0050

Today, the Ontario Energy Board approved Hydro One’s application for leave to construct approximately 180 kilometres of a double-circuit 500 Kilovolt electricity transmission line extending from the Bruce Power Facility in Kincardine Township to Hydro One’s Milton Switching Station in the town of Milton, with conditions.

 

Decision and Order

Sep 11, 2008

Sioux Lookout Hydro Inc.

EB-2007-0785

Today the Ontario Energy Board issued its Decision on an application by Sioux Lookout Hydro Inc. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

Decision and Order

Aug 28, 2008

Hydro One Networks Inc.

EB-2008-0113

Today the Ontario Energy Board issued the Ontario Uniform Transmission Rates Decision and Rate Order approving the rate schedule for the recovery of the revenue requirements of electricity transmitters in the Ontario Transmission Rates Pool (Hydro One Networks Inc, Great Lakes Power Ltd., Canadian Niagara Power Inc. and Five Nations Energy Inc.).

 

Decision and Rate Order

Aug 21, 2008

Atikokan Hydro Inc.

EB-2008-0014

Today the Ontario Energy Board issued its Decision on an application by Atikokan Hydro Inc. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

 

Decision

Aug 15, 2008

Cambridge and North Dumfries Hydro Inc.

EB-2007-0900

Today the Ontario Energy Board issued its Decision on an application by Wellington North Power Inc. for Low Voltage rates to be charged to Waterloo North Hydro Inc. and Hydro One Networks Inc.

 

Decision and Order

Aug 14, 2008

Hydro One Networks Inc.

EB-2008-0023

Today the Ontario Energy Board issued an Order granting leave to Hydro One Networks Inc. to construct electricity transmission facilities in Norfolk County.

 

Decision and Order

Aug 11, 2008

Wellington North Power Inc.

EB-2007-0693

Today the Ontario Energy Board issued its Decision on an application by Wellington North Power Inc. for 2008 electricity distribution rates. New rates will take effect when the final Rate Order is issued.

 

Decision and Order

Jul 31, 2008

Guelph Hydro Electric Systems Ltd.

EB-2007-0742

Today the Ontario Energy Board issued its Decision on an application by Guelph Hydro Electric Systems Ltd. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

 

Decision

Jul 25, 2008

Hydro One Networks Inc.

 

Whitby Hydro Electric Corporation

 

Peterborough Distribution Inc.

EB-2007-0917

EB-2007-0947

Today the Ontario Energy Board issued a Decision and Order amending the service areas in the distribution licences of Hydro One Networks Inc., Whitby Hydro Electric Corporation and Peterborough Distribution Inc.

 

Decision and Order

Jul 18, 2008

Brantford Power Inc

EB-2007-0698

Today the Ontario Energy Board issued its Decision on an application by Brantford Power Inc for 2008 electricity distribution rates.

 

Decision

Jul 15, 2008

Peterborough Distribution Incorporated

EB-2007-0886

Today the Ontario Energy Board issued its Decision on an application by Peterborough Distribution Inc. – Peterborough Service Area for 2008 electricity distribution rates.

 

Decision

Jul 14, 2008

Orangeville Hydro Limited

 

Grand Valley Energy Inc.

EB-2008-0053

Today the Ontario Energy Board issued a Decision and Order granting Orangeville Hydro Limited (Orangeville) and Grand Valley Energy Inc. (Grand Valley) leave to amalgamate as well as to cancel Grand Valley’s distribution licence and to amend Orangeville’s distribution licence to include the area currently served by Grand Valley in its distribution licence.

 

Decision and Order

Jun 24, 2008

Independent Electricity System Operator (IESO)

 

Ontario Power Generation Inc. (OPGI)

EB-2008-0114

Today the Ontario Energy Board amended the licences of both Ontario Power Generation Inc. (OPGI) and the Independent Electricity System Operator (IESO) pursuant to a Ministerial directive issued to the Board on May 21, 2008.

 

Decision and Order

Jun 3, 2008

Espanola Regional Hydro Distribution Corporation

EB-2007-0901

Today the Ontario Energy Board issued its Decision on an application by Espanola Regional Hydro Distribution Corporation (Espanola) for 2008 electricity distribution rates. New rates will take effect July 1, 2008.

 

Decision

Jun 2, 2008

Chapleau Public Utilities Corporation

EB-2007-0755

Today the Ontario Energy Board issued its Decision on an application by Chapleau Public Utilities Corporation (Chapleau PUC) for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

 

Decision

May 26, 2008

Norfolk Power Distribution Inc.

EB-2007-0753

Today the Ontario Energy Board issued its Decision on an application by Norfolk Power Distribution Inc. (Norfolk) for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.

 

Decision

May 22, 2008

PUC Distribution Inc.

EB-2007-0931

Today the Ontario Energy Board issued its Decision on an application by PUC Distribution Inc. (PUC) for 2008 electricity distribution rates. New rates will take effect July 1, 2008.

 

Decision

May 21, 2008

Association of Major Power Consumers in Ontario (AMPCO)

EB-2008-0099

On Friday, May 16, 2008 the Ontario Energy Board (the Board) issued a Decision on a Motion from the Association of Major Power Consumers in Ontario (AMPCO) in relation to the Board's March 19, 2008 Decision on Oshawa PUC Networks Inc.’s 2008 electricity distribution rates (EB-2007-0710).

 

Decision

 

Full Transcript

May 15, 2008

Toronto Hydro-Electric System Limited

EB-2007-0680

Today the Ontario Energy Board (the Board) issued its Decision on an application by Toronto Hydro-Electric System Limited (Toronto Hydro) for electricity distribution rates 2008, 2009 and 2010.

 

Decision

May 15, 2008

Ontario Power Authority

EB-2007-0791

Today the Ontario Energy Board (the Board) issued a Decision and Order on an application by the Ontario Power Authority (OPA) to review its proposed expenditure and revenue requirements and the fees it proposes to charge for the year 2008.

 

Decision and Order

May 9, 2008 Lakefront Utilities Inc. EB-2007-0761

Today the Ontario Energy Board (the Board) issued its Decision on an application by Lakefront Utilities Inc. (Lakefront) for 2008 electricity distribution rates. New rates will take effect May 1, 2008.

 

Decision

May 6, 2008

Rideau St. Lawrence Distribution Inc. (Rideau SL)

EB-2007-0762

Today the Ontario Energy Board (the Board) issued its Decision on an application by Rideau St. Lawrence Distribution Inc. (Rideau SL) for 2008 electricity distribution rates. New rates will take effect on the date of the Final Rate Order.

 

Decision

Apr 22, 2008

Independent Electricity System Operator (IESO)

EB-2007-0816

Today the Ontario Energy Board (the Board) issued a final Decision and Order on an application by the Independent Electricity System Operator (IESO) to approve its fees for the 2008 fiscal year.

 

Decision and Order

 

Apr 4, 2008

Hydro One Networks Inc.

Newmarket-Tay Power Distribution Ltd.

EB-2007-0792

Today the Ontario Energy Board (the Board) issued a Decision and Order amending the distribution licences of Newmarket-Tay Power Distribution Ltd. (Newmarket-Tay) and Hydro One Networks Inc. (Hydro One). The Board also issued an Order granting Hydro One leave to sell distribution assets to Newmarket Tay.

 

Decision and Order

Mar 27, 2008

Halton Hills Hydro Inc.

EB-2007-0696

Today the Ontario Energy Board (the Board) issued its Decision on an application by Halton Hills Hydro Inc. (Halton Hills) for 2008 electricity distribution rates. New rates will take effect May 1, 2008.

 

Decision

Mar 26, 2008

Ontario Power Authority

EB-2007-0707

The Ontario Energy Board has issued a Decision today approving an issues list for its review of the Ontario Power Authority’s (OPA) Integrated Power System Plan (IPSP) and procurement processes, concluding phase 1 of the proceeding. In phase 2, to be scheduled for mid-2008, the Board will use the issues list as the basis for its review of the OPA’s application.

 

Decisions with Reasons

Mar 25, 2008

Barrie Hydro Distribution Inc.

EB-2007-0746

Today the Ontario Energy Board (the Board) issued its Decision on an application by Barrie Hydro Distribution Inc. (Barrie Hydro) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.

 

Decision

Mar 19, 2008

Oshawa PUC Networks Inc.

EB-2007-0710

Today the Ontario Energy Board (the Board) issued its Decision on an application by Oshawa PUC Networks Inc. (Oshawa) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.

 

Decision

 

Varied Decision (issued May 8, 2008)

Mar 17, 2008

Hydro Ottawa Limited

EB-2007-0713

Today the Ontario Energy Board (the Board) issued its Decision on an application by Hydro Ottawa Limited (Hydro Ottawa) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.

 

Decision

Mar 14, 2008

Hydro 2000 Inc.

EB-2007-0704

The Ontario Energy Board (the Board) issued its Decision on an application by Hydro 2000 Inc. for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.

 

Decision

Feb 8, 2008

Ontario Power Generation Inc.

EB-2007-0905

The Ontario Energy Board has released an Order, establishing Ontario Power Generation’s payment levels interim effective April 1, 2008 for its regulated nuclear and baseload hydro generating assets.

 

Interim Payment Order

 

Full Transcript

Jan 17, 2008

Hydro One Networks Inc.

EB-2002-0424

RP-1999-0057

Today, the Ontario Energy Board issued a Decision and Order in relation to an application by Hydro One Networks Inc. pursuant to the Transmission System Code for approval of customer delivery point performance standards.

 

Decision and Order

Jan 10, 2008

Milton Hydro Distribution Inc.

EB-2007-0771

On Tuesday, January 8, 2008 the Ontario Energy Board (the Board) issued a Decision on a Motion from Milton Hydro Distribution Inc. (Milton) in relation to the Board's April 12, 2006 Decision on Milton’s 2006 electricity distribution rates.

 

Decision and Order

Jan 8, 2008

PUC Distribution Inc.

EB-2007-0723

Today the Ontario Energy Board (the Board) issued a Decision and Order approving changes to the 2007 electricity distribution rates for PUC Distribution Inc. (PUC).

 

Decision and Order

Jan 4, 2008

EnWin Utilities Ltd.

EB-2007-0522

Today the Ontario Energy Board (the Board) issued a Decision and Order approving 2007 electricity distribution rates for EnWin Utilities Ltd. (EnWin).

 

Decision and Order

2008 Gas Decisions

Date Applicant Case # Description and documents

Dec 29, 2008

Natural Resource Gas Limited

EB-2008-0377

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective January 1, 2009.

 

Decision and Order

 

Dec 18, 2008

Enbridge Gas Distribution Inc.

EB-2008-0348

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2009.

 

Decision and Order

Dec 15, 2008

Union Gas Limited

EB-2008-0371

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective January 1, 2009.

 

Decision and Order

Nov 27, 2008

Union Gas Limited

EB-2008-0273

The Board issued its Decision and Order on the Union Gas application related to security provisions with NRG.

 

Decision and Order

Nov 19, 2008

Westcoast Energy Inc.

 

Union Gas Limited

EB-2008-0304

Today the Board issued its Decision and Order regarding an application by Westcoast Energy Inc. and Union Gas Limited for leave pursuant to section 43(2) of the Ontario Energy Board Act, 1998 for the transfer of a controlling interest in Union Gas Limited to a limited partnership.

 

Decision and Order

Oct 23, 2008

Union Gas Limited

EB-2008-0154

Today the Ontario Energy Board issued its Decision on a Motion filed by Union Gas Limited to review the Board’s 2007 Deferral Account Decision (EB-2008-0034) with respect to the Long-Term Peak Storage Services Deferral Account (Account 179-72).

 

Decision on Motion

Sep 26, 2008

Natural Resource Gas Limited

EB-2008-0284

Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited charges its customers effective October 1, 2008.

 

Decision and Order

Sep 25, 2008

Enbridge Gas Distribution Inc.

EB-2008-0263

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2008.

 

Decision and Order

Sep 18, 2008

Union Gas Limited

EB-2008-0281

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective October 1, 2008.

 

Decision and Order

Jul 31, 2008

Union Gas Limited

 

Enbridge Gas Distribution Inc.

EB-2007-0606

EB-2007-0615

Today the Ontario Energy Board issued a Decision related to a combined proceeding involving a multi-year incentive rate mechanism to determine rates for the regulated distribution, transmission and storage of natural gas for Union Gas Limited and Enbridge Gas Distribution Inc., effective January 1, 2008.

 

Decision

Jul 28, 2008

Market Hub Partners Management Inc.

 

AltaGas Ltd.

EB-2008-0002

Today the Ontario Energy Board issued a Decision with Reasons approving applications by Market Hub Partners Management Inc. and AltaGas Ltd. concerning the Sarnia Airport Pool project in the City of Sarnia, in the County of Lambton.

 

Decision with Reasons

Jun 25, 2008

Natural Resource Gas Limited

EB-2008-0090

Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective July 1, 2008.

 

Decision and Order

Jun 19, 2008

Enbridge Gas Distribution Inc.

EB-2008-0069

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective July 1, 2008. The new rates also reflect the Board’s May 15, 2008 Decision relating to the multi-year incentive rate mechanism plan for Enbridge’s regulated natural gas distribution, transmission and storage services, also effective July 1, 2008. The rates approved today supersede rates approved on May 15, 2008.

 

Decision and Order

 

Jun 19, 2008

Union Gas Limited

EB-2008-0109

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited (Union) effective July 1, 2008.

 

Decision and Order

Jun 16, 2008

Union Gas Limited

EB-2008-0024

Today the Ontario Energy Board issued a Decision and Order granting Union Gas Limited leave to construct 4.5 kilometres of natural gas pipeline and ancillary facilities in the Town of Halton Hills and the Town of Milton, to supply natural gas to the Halton Hills Generating Station currently being constructed by TransCanada Energy Ltd.

 

Decision and Order

May 21, 2008

Enbridge Gas Distribution Inc.

EB-2007-0782

Today the Ontario Energy Board (the Board) issued a Decision and Order granting leave to Enbridge Gas Distribution Inc. (Enbridge) to construct a natural gas distribution line and related facilities to supply natural gas to the Georgian Bay area.

 

Decision and Order

May 15, 2008

Enbridge Gas Distribution Inc.

EB-2007-0615

Today the Board issued its Decision and Rate Order approving the rates charged by Enbridge Gas Distribution Inc. arising from Enbridge's Incentive Regulation Plan which was approved by the Board on February 11, 2008. The rates will be implemented July 1, 2008 and will be immediately superceded by the July 1, 2008 QRAM decision rates which will be announced in the second half of June.

 

Decision and Rate Order

Apr 29, 2008

Enbridge Gas Distribution Inc.

 

Union Gas Limited

EB-2007-0724

EB-2007-0725

Today the Ontario Energy Board (the Board) issued its Decision with Reasons on natural gas storage allocation policies for certain large volume customers of Union Gas Limited (Union) and Enbridge Gas Distribution Inc. (Enbridge).

 

Decision with Reasons

Mar 25, 2008

Natural Resource Gas Limited

EB-2008-0031

Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective April 1, 2008.

 

Decision and Order

Mar 19, 2008

Enbridge Gas
Distribution Inc.

EB-2008-0048

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective April 1, 2008.

 

Decision and Interim Order

Mar 13, 2008

Union Gas Limited

EB-2008-0033

Today the Ontario Energy Board (the Board) approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2008 arising from Union’s April 2008 QRAM application.

 

Decision and Interim Order

Mar 12, 2008

Natural Resource Gas Limited

EB-2006-0243

Today the Ontario Energy Board issued a Decision relating to an earlier Decision that granted Natural Resource Gas Limited (NRG) leave to construct a 28.5 kilometer natural gas pipeline.

 

Decision

Mar 11, 2008

Enbridge Gas
Distribution Inc.

 

Union Gas Limited

EB-2007-0606

EB-2007-0615

Today the Board issued its Decision regarding the treatment of customer additions under the Incentive Regulation Plan for Union Gas Limited and Enbridge Gas Distribution Inc. The Board concluded that the companies' underlying and long term incentives to make customer additions are greater than the potential disincentive in the Incentive Regulation Plan and so no adjustment to the Incentive Regulation Plan was necessary.

 

Decision

Mar 4, 2008

Natural Resource Gas Limited

EB-2006-0243

Today the Ontario Energy Board issued a Decision and Order amending an earlier Decision that granted Natural Resource Gas Limited (NRG) leave to construct a 28.5 kilometer natural gas pipeline.

 

Decision and Order

Feb 11, 2008

Enbridge Gas Distribution Inc.

EB-2007-0615

Today the Ontario Energy Board issued a Decision on a settlement agreement regarding an application by Enbridge Gas Distribution Inc. (Enbridge) for approval of a multi-year incentive rate mechanism for its regulated natural gas distribution, transmission and storage services.

 

Decision

Feb 4, 2008

Enbridge Gas Distribution Inc.

EB-2007-0731

Today the Ontario Energy Board issued a Decision on an application by Enbridge Gas Distribution Inc. (Enbridge) for an order or orders approving the balance in the 2007 Class Action Suit Deferral Account (the Account) and disposition of that balance.

 

Decision

Jan 17, 2008

Union Gas Limited

EB-2007-0606

Application by Union Gas Limited for an Order or Orders approving or fixing a multiyear incentive rate mechanism to determine rates for the regulated distribution, transmission and storage of natural gas, effective January 1, 2008.

 

Decision

2007

2007 Electricity Decisions

Date Applicant Case # Description and documents

Dec 28, 2007

Niagara Falls Hydro Inc.

 

Peninsula West Utilities Ltd.

EB-2007-0749

Today the Ontario Energy Board issued a Decision and Order granting Niagara Falls Hydro Inc. (Niagara Falls) and Peninsula West Utilities Limited (Pen West) leave to amalgamate.

 

Decision and Order

Dec 24, 2007

Great Lakes Power Limited

Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP

EB-2007-0647
EB-2007-0649
EB-2007-0650
EB-2007-0651
EB-2007-0652

The Ontario Energy Board today released its Decision and Order relating to applications by Great Lakes Power Limited and Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP under various sections of the .

 

GLPL applied:

  • to sell its transmission system to Great Lakes Power Transmission LP;
  • to transfer its rate order and leave to construct order to Great Lakes Power Transmission LP; and
  • to amend its electricity transmission licence.

 

Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP applied for an electricity transmission licence.

 

The Board has granted all the applications.

 

Decision and Order 

Dec 24, 2007

Welland Hydro-Electric System Corporation

EB-2007-0663

Today the Ontario Energy Board issued a Decision and Order approving an amendment to the 2007 electricity distribution rates for Welland Hydro-Electric System Corporation.

 

Decision

Dec 21, 2007

Ontario Power Generation (OPG)
Independent Electricity System Operator (IESO)

EB-2007-0715

Today, the Ontario Energy Board (the Board) issued a Decision approving a third reliability must-run (RMR) contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator (IESO) for OPG's Lennox generating station. A first RMR contract for Lennox was approved by the Board on March 13, 2006 and a second was approved on January 22, 2007

 

Decision with Reasons

Nov 26, 2007

Hydro One Networks Inc.

EB-2007-0797

Today the Ontario Energy Board (the Board) issued a Decision and Order concerning a motion by Hydro One Networks Inc. (Hydro One) to review two elements of the Board’s September 7, 2007 Decision and Order regarding the connection procedures of Hydro One and Great Lakes Power Limited (the Connection Procedures Decision).

 

Decision and Order

Oct 12, 2007

Canadian Renewable Energy Corporation

EB-2007-0034

Today the Ontario Energy Board issued an Order granting an application by Canadian Renewable Energy Corporation for leave to construct transmission facilities connecting its Wolfe Island wind farm to the transmission grid.

 

Decision and Order

Oct 11, 2007

Hydro One Networks Inc.

EB-2007-0027

Today the Ontario Energy Board (the Board) issued an Order granting leave to Hydro One Networks Inc. (Hydro One) to construct electricity transmission facilities in the Woodstock area.

 

Decision and Order

Oct 10, 2007

Terrace Bay Superior Wires Inc.

EB-2007-0666
EB-2007-0688
EB-2007-0726
EB-2007-0727

Today the Ontario Energy Board issued a Decision and Order related to applications by Terrace Bay Superior Wires Inc. (Terrace Bay) to amend its 2007 distribution rates and to sell its distribution system. The Decision and Order also relates to applications by Hydro One Networks Inc. (Hydro One) to amend its distribution licence and distribution rate order.

 

Decision and Order

Oct 9, 2007

Hydro One Networks Inc.

EB-2007-0013

Today the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks Inc. (Hydro One) leave to construct electricity transmission facilities in the City of Brampton.

 

Decision and Order

Sep 21, 2007

Toronto Hydro-Electric System Limited

Hydro Ottawa Limited

EB-2007-0747

EB-2007-0748

The Ontario Energy Board issued a Decision and Order in the matter of motions by Toronto Hydro-Electric System (EB-2007, 200747) and Hydro Ottawa Limited (EB-2007, 200748) requesting the Board review and vary certain aspects of the Decision and Order in the smart metering proceeding EB-2007-0063.

 

Decision and Order

Sep 21, 2007

Hydro One Networks Inc.

EB-2007-0668

In the matter of an application by Hydro One Networks Inc. seeking an order granting Hydro One Networks Inc. leave to sell distribution system assets to Burlington Hydro Inc.

 

Decision and Order

Aug 20, 2007

Hydro One Networks Inc.’s (Hydro One)

EB-2007-0051

Today the Ontario Energy Board (the "Board") issued a Decision granting Hydro One Networks Inc. ("Hydro One") an interim order with conditions until April 1, 2009 allowing entry onto land to conduct certain survey, testing, appraisal and investigative activities for a proposed transmission line.

 

Decision with Reasons

Aug 16, 2007

Hydro One Networks Inc.’s (Hydro One)

EB-2006-0501

Today the Ontario Energy Board (OEB) issued a Decision with Reasons regarding Hydro One Networks Inc.’s (Hydro One) application for approval of its transmission revenue requirement for 2007 and 2008.

 

Decision with reasons

Aug 8, 2007

Chatham-Kent Hydro Inc.,
Enersource Hydro Mississauga Inc.,
Horizon Utilities Corporation,
Hydro One Brampton Networks Inc.,
Hydro One Networks Inc.,
Hydro Ottawa Limited, 
Middlesex Power Distribution Corporation,
Milton Hydro Distribution Inc.,
PowerStream Inc., 
Tay Hydro Electric Distribution Co. Inc., 
Toronto Hydro-Electric System Limited,
Veridian Connections Inc.
and Newmarket Hydro Limited.

EB-2007-0063

Today the Ontario Energy Board (the Board) issued a Decision with Reasons approving costs associated with smart metering activities incurred by 13 utilities authorized by government regulation to undertake smart metering activities.

 

Decision with reasons

Jul 31, 2007

Canadian Niagara Power Inc. – Fort Erie (Fort Erie), 
Canadian Niagara Power Inc. – Port Colborne (Port Colborne),
Peterborough Distribution Inc. (Peterborough), 
and Lakeland Power Distribution Ltd. (Lakeland)

EB-2007-0514
EB-2007-0595
EB-2007-0571
EB-2007-0551

Today the Ontario Energy Board (the Board) issued a Decision with Reasons approving rate adjustments to 2007 Distribution Rates to cover costs incurred by Canadian Niagara Power Inc. – Fort Erie (Fort Erie), Canadian Niagara Power Inc. – Port Colborne (Port Colborne), Peterborough Distribution Inc. (Peterborough), and Lakeland Power Distribution Ltd. (Lakeland) from severe storms in 2006 which inflicted significant damage to their respective distribution systems.

 

Decision with reasons

Jul 26, 2007

PowerStream Inc.
(PowerStream)

EB-2007-0074

Today the Ontario Energy Board (the Board) issued a Decision and Order approving an application by PowerStream Inc. (PowerStream) to harmonize its 2007 distribution rates.

 

Decision and order

 

Tariff of Rates and Changes

Jul 20, 2007

Hydro One Networks Inc.
(Hydro One)

EB-2006-0352

On July 19, 2007, the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks Inc. (Hydro One) permission to expropriate land to construct an overhead 115 kilovolt transmission line to supply electricity to an automotive plant being built by Toyota Motor Manufacturing Canada Inc. (Toyota) in Woodstock.

 

Decision and order

Jul 18, 2007

Terrace Bay Superior Wires Inc.
(Terrace Bay)

EB-2007-0666

Today the Ontario Energy Board (the Board) issued a Decision and Order regarding an application by Terrace Bay Superior Wires Inc. (Terrace Bay) to change its distribution rates.

 

Decision and order

Jul 12, 2007

Erie Thames Powerlines Corporation (Erie Thames)

RP-2005-0020
EB-2005-0361
EB-2006-0197
EB-2007-0524
EB-2007-0016

Today the Ontario Energy Board (the Board) issued a Decision and Order regarding both the 2006 and 2007 electricity distribution rates for Erie Thames Powerlines Corporation (Erie Thames).

 

Decision and order

Jun 22, 2007

Thunder Bay Hydro Electricity Distribution Inc.(TB Hydro)

RP-2005-0020
EB-2005-0419 
EB-2007-0580 
EB-2007-0067

Today the Ontario Energy Board (the Board) issued a Decision on a Motion by Thunder Bay Hydro Electricity Distribution Inc.(TB Hydro) relating to errors in TB Hydro’s 2006 Distribution Rates filing and the related Rate Orders for 2006 and 2007.

 

Decision on Motion

Jun 8, 2007

Erie Thames Powerlines Corporation

RP-2005-0020
EB-2005-0361
EB-2006-0197
EB-2007-0016

Today, the Ontario Energy Board issued a Decision on the Motion by Erie Thames Powerlines Corporation (EB-2007-0016) seeking an Order Varying the Decision and Order of the Board in RP-2005-0020 / EB-2005-0361 / EB-2006-0197.

Decision on Motion

May 29, 2007

Kruger Energy Port Alma Limited Partnership
(KEPA)

EB-2007-0006

The Ontario Energy Board today issued an Order granting an application by Kruger Energy Port Alma Limited Partnership (“KEPA”) for leave to construct transmission facilities which will connect a wind generating station to the transmission facilities of Hydro One Networks Inc.

 

Decision and Order

Apr 10, 2007

Association of Major Power Consumers in Ontario (AMPCO)

EB-2007-0040

Today the Ontario Energy Board (the Board) issued a decision with reasons denying the application by the Association of Major Power Consumers in Ontario for an Order revoking a market rule amendment and referring it back to the Independent Electricity System Operator (IESO) for further review.

 

Decision and Order revised April 12, 2007

 

Errata cover letter and Errata sheet April 12, 2007

Apr 2, 2007

Greater Sudbury Hydro Inc.

EB-2006-0186

Today the Ontario Energy Board issued a Decision granting Greater Sudbury Hydro Inc. leave to amalgamate with West Nipissing Energy Services Ltd.

 

Decision and Order

Mar 30, 2007

Hydro One Networks Inc.

EB-2006-0501

Today, the Board has released its EB-2006-0501 partial decision and order regarding the Hydro One Networks Inc. request for the establishment of a 2007 transmission revenue deficiency deferral account.

 

Partial Decision and Order

Mar 21, 2007

Independent Electricity System Operator (IESO)

EB-2006-0244

Today the Ontario Energy Board (the Board) issued its final Decision and Order on the application by the Independent Electricity System Operator (IESO) to set its fees for the 2007 fiscal year.

Decision and Order revised Mar 23, 2007

Mar 8, 2007

Newmarket Hydro Ltd. (Newmarket Hydro)
Tay Hydro Electric Distribution Company Inc. (Tay Hydro)

EB-2006-0344

Today the Ontario Energy Board issued a Decision and Order granting Newmarket Hydro Ltd. (Newmarket Hydro) and Tay Hydro Electric Distribution Company Inc. (Tay Hydro) leave to amalgamate.

 

Decision and order

Mar 5, 2007

Abitibi-Consolidated Company of Canada

EB-2006-0175
EB-2006-0124
EB-2006-0128

Today the Board granted Abitibi-Consolidated Company of Canada's request to amend its electricity generation licence by changing its qualification from "owner and operator" of eight hydroelectric generating stations in the vicinities of Kenora, Fort Frances and Iroquois Falls to "operator" only. The Board also granted an electricity retailer licence and electricity generation licence to ACH Limited Partnership. ACH will be the licensed owner of the eight hydroelectric generating stations.

 

Decision and order

Feb 15, 2007

Ontario Power Authority (OPA)

EB-2006-0233

Today the Ontario Energy Board issued a final Decision on the application by the Ontario Power Authority (OPA) to approve its 2007 expenditures and revenue requirement and fees.

 

Decision

Jan 31, 2007

Hydro One Networks Inc.

EB-2006-0215

The Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One leave to construct Transmission Facilities in the City of Brampton, northwest of Toronto. The proposed facilities include a 4.2 kilometer extension of 230 kilovolt (kV) circuits as well as four in-line circuit breakers to be installed at the new Hurontario switching station, near the Brampton/Mississauga border. Hydro One proposes an in-service date for the proposed facilities, estimated to cost $42 million, of May 2009.

 

Decision and Order

Jan 22, 2007

Ontario Power Generation (OPG) 

 

Independent Electricity System Operator (IESO)

EB-2006-0205

Today, the Ontario Energy Board (the Board) issued a Decision approving a second reliability must-run (RMR) contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator (IESO) for OPG’s Lennox generating station. The first contract was approved by the Board on March 13, 2006.

 

Decision with reasons

Jan 2, 2007

Erie Thames Powerlines Corporation (ETPC)

RP-2005-0020
EB-2005-0361
EB-2006-0197

Today the Ontario Energy Board (the Board) issued a Decision and Order regarding 2006 Electricity Distribution Rates for Erie Thames Powerlines Corporation (ETPC).

 

Decision and Order

2007 Gas Decisions

Date Applicant Case # Description and documents

Dec 24, 2007

Union Gas Limited

EB-2007-0837

The Board has issued its Decision with respect to the application by Union Gas Limited for an order granting the company leave to purchase 75% of the voting securities of Tipperary Gas Corp.

Decision and Order

Dec 21, 2007

Natural Resource Gas Limited

EB-2007-0927

Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective January 1, 2008.

 

Decision and Order

Dec 18, 2007

Enbridge Gas Distribution Inc.

EB-2007-0897

The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective January 1, 2008.

 

Decision and Order

Dec 13, 2007

Union Gas Limited

EB-2007-0918

The Ontario Energy Board has approved changes to the rates for Union Gas Limited (Union), effective January 1, 2008.

 

Decision and Interim Order

 

Interim Rate Order

Nov 6, 2007

Union Gas Limited

EB-2007-0606

Today the Ontario Energy Board (the Board) issued an Oral Decision on Union Gas Limited’s (Union) Motion for an order implementing new rates on an interim basis effective January 1, 2008.

 

Oral Decision

 

Complete Hearing Transcript

Oct 19, 2007

Union Gas Limited

EB-2007-0661

Today the Ontario Energy Board (the Board) issued a Decision and Order granting Union Gas Limited (Union) leave to construct natural gas pipelines in the township of Dawn-Euphemia, in the County of Lambton subject to certain conditions of approval. Following its review of the evidence, the Board also prepared a favourable report to the Minister of Natural Resources recommending approval of the application to drill the proposed wells subject to the conditions of approval.

 

Decision and Order

Oct 16, 2007

Enbridge Gas Distribution Inc.

EB-2007-0692

Today the Ontario Energy Board (the Board) issued a Decision and Order granting an application by Enbridge Gas Distribution Inc. (Enbridge) to expropriate land owned by the City of Toronto Economic Development Corporation (TEDCO), to enable construction of a natural gas pipeline to supply natural gas to the Portlands Energy Centre (Portlands) generating station in the city of Toronto.

 

Decision and Order

Oct 9, 2007

Union Gas
Limited

EB-2007-0079

The Ontario Energy Board issued a Decision and Order granting Union Gas Limited (Union) leave to construct a natural gas pipeline in the Townships of Augusta and Edwardsburgh/Cardinal in the United Counties of Leeds and Grenville.

 

Decision and Order

Sep 28, 2007

Natural Resource Gas Limited

EB-2007-0734

Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective October 1, 2007.

 

Decision

Sep 24, 2007

Enbridge Gas Distribution Inc.

EB-2007-0701

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective October 1, 2007.

 

Final Rate Order

 

Decision and Order

Sep 14, 2007

Union Gas Limited (Union)

EB-2007-0720

Today, the Ontario Energy Board has approved changes to the rates Union Gas Limited ( Union) charges its customers effective October 1, 2007.

 

Decision and Order

Jul 30, 2007

Natural Gas Electricity Interface Review
(NGEIR)

EB-2006-0322
EB-2006-0340

Today, the Ontario Energy Board (the Board) issued its decision not to vary any aspect of its November 2006 decision on the Natural Gas Electricity Interface Review (NGEIR Decision)

 

Decision with reasons

Jul 5, 2007

Enbridge Gas Distribution Inc. (Enbridge)

EB-2006-0034

Today the Ontario Energy Board (OEB) issued a Decision with Reasons pertaining to Enbridge Gas Distribution Inc.'s (Enbridge) application for approval of delivery rates for its 2007 fiscal year.

 

Decision with reasons - Phase 1

Jun 27, 2007

Union Gas Limited (Union)

EB-2005-0211

Today the Ontario Energy Board (the Board) issued a Decision with Reasons on an application by Union Gas Limited (Union) related to proceeds from the sale of cushion gas and whether there is any basis on the evidence to allocate all or part of the gain to customers.

 

Decision with reasons

Jun 26, 2007

Natural Resource Gas Limited (NRG)

EB-2007-0627

Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective July 1, 2007.

 

Decision and Order

Jun 25, 2007

Enbridge Gas Distribution Inc. (Enbridge)

EB-2007-0632

Today the Ontario Energy Board (the Board) approved Enbridge Gas Distribution Inc.’s (Enbridge) Quarterly Rate Adjustment Mechanism effective July 1, 2007.

 

Decision and Interim Order

Jun 14, 2007

Union Gas Limited

EB-2007-0634

The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2007. Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.

 

Decision and Order

Jun 1, 2007

Enbridge Gas Distribution Inc. (Enbridge)

EB-2006-0305

Today the Ontario Energy Board (the Board) issued a Decision and Order granting Enbridge Gas Distribution Inc. (Enbridge) leave to construct natural gas pipelines to supply natural gas to the Portlands Energy Centre generating station (Portlands) in Toronto subject to conditions attached to its decision.

Decision and Order

May 30, 2007

Natural Resource Gas Limited

EB-2007-0092

Today the Ontario Energy Board approved Natural Resource Gas Limited’s (NRG) application to dispense balances in its non-commodity related deferral/variance accounts as of September 30, 2006.

 

Decision and Order

May 22, 2007

Natural Gas Electricity Interface Review 
(NGEIR)

EB-2006-0322 
EB-2006-0338 
EB-2006-0340

Today the Ontario Energy Board issued a Decision with Reasons on three Notices of Motions (Motions) to review certain aspects of the Natural Gas Electricity Interface Review (NGEIR) Decision. The Motions were filed by the City of Kitchener (Kitchener), the Association of Power Producers of Ontario (APPrO), and jointly by the Industrial Gas Users’ Association (IGUA), the Vulnerable Energy Consumers Coalition (VECC) and the Consumers Council of Canada (CCC).

 

Decision with reasons

Apr 26, 2007

Enbridge Gas Distribution Inc.

EB-2006-0034

Today the Ontario Energy Board (the Board) issued a majority Decision finding that the Board does not have the jurisdiction to develop a rate class using income level as a determining factor.

 

Decision - Rate Affordability Programs

Mar 28, 2007

Natural Resource Gas Limited (NRG)

EB-2007-0048

Today the Ontario Energy Board approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective April 1, 2007.

 

Decision and Order

Mar 26, 2007

Enbridge Gas Distribution Inc.

EB-2006-0034

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2007. The changes are the result of an Interim Order regarding Enbridge’s 2007 rates and an Interim Decision and Order regarding Enbridge’s Quarterly Rate Adjustment Mechanism (QRAM). The 2007 rate order comes first and is immediately superseded by the April 2007 QRAM.

 

Interim Rate Order

 

Decision and Interim Order

Mar 12, 2007

Union Gas Limited (Union)

EB-2007-0053

The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2007. Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.

Decision and Order

Feb 13, 2007

MHP Canada

EB-2006-0162
EB-2006-0163
EB-2006-0164
EB-2006-0165
EB-2006-0166
EB-2006-0167

Today, the Board issued reasons for its December 22, 2006 decision to approve applications by MHP Canada to develop St.Clair gas storage pool.

 

Reasons for Decision

Feb 6, 2007

Tipperary Gas Corp.

EB-2006-0018
EB-2006-0159
EB-2006-0279

Today, the Board issued a decision regarding three applications by Tipperary Gas Corp.

 

Decision

Feb 5, 2007

Market Hub Partners Canada (MHP) 

 

Tribute Resources Inc.

(Tribute)

 

Union Gas Limited

EB-2005-0551

Today the Ontario Energy Board (the Board) issued an Order rescinding the storage rate orders of Market Hub Partners Canada (MHP) and Tribute Resources Inc. (Tribute), and Union Gas Limited's current Blanket Storage Order from previous Decisions.

 

Order

Feb 2, 2007

Natural Resource Gas Limited (NRG)

EB-2006-0243

Today the Ontario Energy Board issued a Decision and Order granting conditional leave to construct a natural gas pipeline and ancillary facilities to Natural Resource Gas Limited (NRG).

 

Decision and Order

Jan 30, 2007

Union Gas Limited (Union)

EB-2005-0211
EB-2006-0081

Today the Ontario Energy Board (the Board) issued a Decision and Order regarding treatment of the disposition of certain deferral accounts by Union Gas Limited (Union). At issue is whether the Board has the jurisdiction to allocate any portion of the proceeds from the sale of cushion gas. In its Decision, the Board determined it has the power to apportion the proceeds of such asset sales between the utility and the ratepayer.

 

Decision and Order

2006

2006 Electricity Decisions

Date Applicant Case # Description and documents

Dec 29, 2006

Thunder Bay Hydro Electricity Distribution Inc. (Thunder Bay Hydro)

EB-2005-0419

Today the Ontario Energy Board issued a Vary Order regarding Thunder Bay Hydro Electricity Distribution Inc.’s (Thunder Bay Hydro) 2006 Electricity Distribution Rates.

 

Vary Order

Dec 21, 2006

Essex Powerlines Corporation (Essex)

EB-2006-0176

Today the Ontario Energy Board (the Board) issued a Decision on a Motion from Essex Powerlines Corporation (Essex) in relation to the Board's April 12, 2006 Decision and Order regarding Essex's application for 2006 electricity distribution rates.

 

Decision on Motion and Rate Order

Nov 22, 2006

Ontario Energy Board (OEB)

EB-2006-0087

The Board has posted a Decision issued on Monday November 20, 2006 in the Board's generic licence amendment proceeding - EB-2006-0087.

 

Decision

Oct 3, 2006

Enersource Hydro Mississauga Inc. (Enersource)

EB-2006-0109

Today the Ontario Energy Board (the Board) issued a Decision on a Motion from Enersource Hydro Mississauga Inc. (Enersource) in relation to the Board’s April 12, 2006 Decision on Enersource’s 2006 electricity distribution rates.

 

Decision on motion

Sep 22, 2006

PowerStream Inc.’s (PowerStream)

EB-2006-0108

Today the Ontario Energy Board (the Board) issued an Order to vary certain aspects of PowerStream Inc.’s (PowerStream) 2006 Electricity Distribution Rates which were approved earlier this year and took effect on May 1, 2006.

 

Rate order

Sep 13, 2006

Ontario Power Generation Inc.
Independent Electricity System Operator

EB-2006-0110

The Board has issued a Decision and Order implementing a directive from the Ministry of Energy that amends the licence conditions relating to the OPG Rebate, of the generation licence of Ontario Power Generation Inc., and the licences of the Independent Electricity System Operator, the distributors and the retailers.

 

Decision and Order

 

Letter to Distributors

 

Letter to Retailers

Jul 26, 2006

Hydro One Network Inc.

EB-2006-0180

On July 21, 2006 the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks an interim distribution licence to operate Cat Lake Power Utility Ltd.’s transmission and distribution system. This license to operate does not change the ownership of the assets which remain with Cat Lake Power for the transmission component, and the Ontario Electricity Financial Corporation (OEFC) for the distribution component. Hydro One is to take on this operational responsibility no later than August 14, 2006.

 

Decision and order

 

Erratum

 

Appendix A

 

Appendix B

 

Appendix C

Jul 17, 2006

Northern Ontario Wires Inc.

RP-2005-0020 
EB-2005-0398

An Application by Northern Ontario Wires Inc. for an order or orders approving or fixing just and reasonable distribution rates and other charges, effective May 1, 2006.

 

Decision and order

Jul 6, 2006

Ottawa River Power Corporation

RP-2005-0020
EB-2005-0403

Today the Ontario Energy Board (the Board) issued its 2006 electricity distribution rate Decision and Order for Ottawa River Power Corporation.

 

Decision and order

Jun 28, 2006

Toronto Hydro

RP-2004-0203
EB-2004-0485
EB-2006-0145

The Ontario Energy Board (the “Board”) today approved Toronto Hydro’s request to implement a new conservation and demand management program aimed at rewarding consumers for electricity conservation during the summer months.

 

Decision and Order

Apr 20, 2006

West Coast Huron Energy Inc.

EB-2004-0513

The Board has released its decision regarding the review of the RP-2000-0263/EB-2000-0563/EB-2001-0226 distribution rates decision for West Coast Huron Energy Inc.

 

Decision with Reasons

Apr 19, 2006

Hydro One Networks Inc.

EB-2005-0528

The Board has released its decision on an application by Hydro One Networks Inc. to amend the distribution rates for its Distributed Generation customers on an interim basis.

 

Decision with Reasons

Mar 29, 2006

Greenfield Energy Limited Partnership
(Greenfield)

EB-2005-0478

Today, the Ontario Energy Board (OEB) issued a Decision and Order granting Greenfield Energy Limited Partnership (Greenfield) leave to construct 3.5 km of 230 kV transmission circuits to connect the Greenfield Energy Centre to the transmission facilities of Hydro One Networks Inc. in the Township of St. Clair.

 

Decision and Order

Mar 21, 2006

2006 Electricity Distribution Rates.

RP-2005-0020
EB-2005-0529

Today, the Ontario Energy Board (OEB) issued a Decision on a number of common issues regarding 2006 electricity distribution rates.

 

Decision

 

Mar 13, 2006

Ontario Power Generation (OPG) 

 

Independent Electricity System Operator (IESO)

EB-2005-0490

Today, the Ontario Energy Board issued a Decision approving a reliability must-run contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator for OPG's Lennox generating station. Reliability must run contracts keep generating stations available to maintain the reliability of the electricity system.

 

Decision

Mar 3, 2006

Conservation and Demand Management (CDM)

RP-2005-0020
EB-2005-0523

Today, the Ontario Energy Board (the "Board") issued a Decision to provide guidance for all utilities related to the filing and evaluation of certain Conservation and Demand Management (CDM) initiatives, for the purpose of 2006 rates.

 

Decision with reasons

Feb 21, 2006

Guelph Hydro Electric Systems Inc. (GHESI)

 

Wellington Electric Distribution Company Inc.(Wellington)

EB-2005-0533

Today the Ontario Energy Board (the Board) issued a Decision and Order granting leave for Guelph Hydro Electric Systems Inc. (GHESI) and Wellington Electric Distribution Company Inc. ( Wellington) to amalgamate.

 

Decision and Order

Feb 21, 2006

Hydro One Networks Inc. (Hydro One)

EB-2005-0501

Today, the Ontario Energy Board (the Board) issued a Decision to establish a new deferral account to record any over-earnings realized in 2006 through Hydro One Networks Inc. (Hydro One) transmission rates.

 

Decision

Feb 14, 2006

Independent Electricity System Operator (IESO)

EB-2005-0499

Decision 
Today the Ontario Energy Board (the Board) issued its final Decision and Order on the application by the Independent Electricity System Operator (IESO) to set its fees for the 2006 fiscal year.

 

Decision and Order

 

Interim Decision - Feb 3, 2006 
The Ontario Energy Board (the Board) issued an Interim Decision and Order on the application by the Independent Electricity System Operator (IESO) to set its fees for the 2006 fiscal year. The Interim Decision approves the IESO’s proposed fees for 2006 of $0.909 per megawatt-hour on an interim basis effective January 1, 2006.

 

Interim Decision and Order

2006 Gas Decisions

Date Applicant Case # Description and documents

Dec 20, 2006

Enbridge Gas Distribution Inc.

EB-2006-0288

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2007.

 

Decision and Order

Dec 19, 2006

Natural Resource Gas Limited (NRG)

EB-2006-0503

Today the Ontario Energy Board approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective January 1, 2007.

 

Decision and Order

Dec 19, 2006

Union Gas Limited (Union)

EB-2005-0520 
EB-2006-0502

The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective January 1, 2007. The new rates reflect four decisions of the Board that affect Union's 2007 rates. These decisions are the 2007 rates case, the Natural Gas Electricity Interface Review (NGEIR), the Demand Side Management review (DSM) and the Quarterly Rate Adjustment Mechanism (QRAM).

 

Decision and Final Rate Order

 

QRAM Decision

Nov 7, 2006

Natural Gas Electricity Interface Review (NGEIR)

EB-2005-0551

Today the Ontario Energy Board issued a Decision with Reasons on the Natural Gas Electricity Interface Review (NGEIR) proceeding. The NGEIR proceeding followed on from the Natural Gas Forum Report, in which the Board determined that ensuring Ontario’s natural gas infrastructure can meet the demands created by new natural gas-fired electricity generators is an “important and immediate priority.”

 

Decision with reasons

Sep 28, 2006

Natural Resource Gas Ltd.

EB-2006-0213
EB-2005-0544

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Ltd. effective October 1, 2006. These changes will increase total costs for a typical residential customer.

 

Decision and order (revised)

 

Rate Order

Sep 25, 2006

Enbridge Gas Distribution Inc.

EB-2006-0195

Today the Ontario Energy Board approved changes to the rates charged by Enbridge Gas Distribution Inc. effective October 1, 2006. While there were no changes directly related to the forecast of the commodity rate, there were changes to the delivery rates charged by Enbridge as well as a change to the Gas Cost Adjustment between October 1, 2006 and December 31, 2006. These changes will result in a slight decrease to the total costs for a typical residential customer.

 

Decision and order

 

 

Sep 20, 2006

Natural Resource Gas Ltd’s (NRG)

EB-2005-0544

The Board issued a Decision with Reasons on Natural Resource Gas Ltd's (NRG) application for changes to its delivery rates for the 2007 fiscal year, effective October 1, 2006. The Decision applies to approximately 6,500 residential and non-residential customers of NRG in Aylmer and surrounding areas.

 

Decision with reasons

Sep 19, 2006

Union Gas Limited (Union)

EB-2006-0500

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.

 

Decision and Order

Aug 25, 2006

Natural Gas Demand Side Management Generic Issues Proceeding

EB-2006-0021

Today, the Ontario Energy Board (the “Board”) issued a Decision related to the filing and evaluation of certain Demand Side Management (DSM) initiatives undertaken by natural gas utilities.

 

Decision with Reasons

Jul 18, 2006

Natural Gas Electricity Interface Review Issues and Storage Regulation

EB-2005-0551

On Friday, July 14, 2006 in the NGEIR oral hearing the Board made a ruling on a "threshold issue" which is related to the Enbridge Gas Distribution Inc. Rates 125 and 300.

 

Oral Ruling

Jul 10, 2006

Enbridge Gas Distribution Inc.

EB-2005-0539

An application by Enbridge Gas Distribution Inc. pursuant to subsection 90(1) of the Ontario Energy Board Act, 1998 for an Order granting leave to construct 6.5 kilometres of natural gas pipeline in the City of Brampton to supply natural gas to an electricity generating station.

 

Decision and order

Jun 29, 2006

Natural Gas Electricity Interface Review Issues and Storage Regulation

EB-2005-0551

On June 27, 2006 the Board issued an oral decision on the Union Settlement Agreement, dated June 13, 2006. The decision addressed Union’s proposed procedure for determining access to F24-T service.

 

Order

 

Oral Decision

Jun 29, 2006

Union Gas Limited

EB-2005-0520

The Board today issued its Decision with Reasons concerning Union Gas Limited's (Union) application for a Board Order approving rates for its 2007 fiscal year commencing January 1, 2007. The proceeding included a settlement process whereby Union and the other parties reached a settlement on a majority of the issues.

 

Decision with Reasons

Jun 22, 2006

Enbridge Gas Distribution Inc.

EB-2006-0099

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective July 1, 2006. These changes will decrease total costs for a typical residential customer.

 

Decision and Order

Jun 21, 2006

Natural Resource Gas Limited (NRG)

EB-2006-0111

The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective July 1, 2006.

Decision and Order

Jun 15, 2006

Union Gas Limited (Union)

EB-2006-0106

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.

 

Decision and Order

Jun 12, 2006

Union Gas Limited (Union)

EB-2005-0550

Today the Ontario Energy Board (the Board) issued a Decision and Order granting Union Gas Limited (Union) leave to construct 18.1 kilometers of 48 inch diameter natural gas pipeline and ancillary facilities to expand the Trafalgar transmission system in the County of Middlesex.

 

Decision and Order

Mar 30, 2006

Union Gas Limited

EB-2005-0507

Today the Ontario Energy Board released its Order concerning Union Gas Limited's 2006 Demand Side Management Plan.

 

Order

Mar 28, 2006

Union Gas Limited

EB-2006-0015

Today, the Board issued a Decision and Order approving an application by Union Gas Limited respecting an assignment of an existing gas storage contract to Virginia Power Energy Marketing Inc. from Duke Energy Marketing Canada Corp.

 

Decision and Order

Mar 28, 2006

Natural Resource Gas Ltd.

EB-2005-0555

Today the Ontario Energy Board approved Natural Resource Gas Limited’s (NRG) application to dispense balances in its non-commodity related deferral/variance accounts as of September 30 2005.

 

Decision and Order

Mar 27, 2006

Enbridge Gas Distribution Inc.

EB-2006-0035
EB-2005-0001
EB-2005-0437

The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2006.

 

Decision and Order

 

Rate Order

Mar 22, 2006

Natural Resource Gas Limited (NRG)

EB-2006-0037

The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective April 1, 2006.

 

Decision

Mar 13, 2006

Union Gas Limited (Union)

EB-2006-0033

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.

 

Decision

Feb 9, 2006

Enbridge Gas Distribution Inc.’s (EGDI)

EB-2005-0001
EB-2005-0437

Today the Ontario Energy Board (OEB) issued a Decision with Reasons pertaining to Enbridge Gas Distribution Inc.'s (EGDI) application for approval of delivery rates for its 2006 fiscal year.

 

Decision with reasons

 

Jan 30, 2006

Enbridge Gas Distribution Inc.

EB-2006-0002
EB-2006-0003

Today the Board issued a report to the Minister of Natural Resources concerning an application by Enbridge to drill two oil extraction wells in the Corunna Designated Gas Storage Area.

 

Cover letter

 

Report to the Minister of Natural Resources

Jan 6, 2006

Greenfield Energy Centre Limited Partnership (GEC)

 

Union Gas Limited

RP-2005-0022
EB-2005-0441 
EB-2005-0442 
EB-2005-0443 
EB-2005-0473

Today the Ontario Energy Board issued a Decision and Order determining that competing applications from both Greenfield Energy Centre Limited Partnership (“GEC”) and Union Gas Limited (“Union”) to each construct a two kilometre natural gas pipeline and associated equipment in the Sarnia area were credible and in the public interest. The two competing applications would serve the same potential load – a planned 1,005 MW gas-fired generating station (being built by GEC) in Courtright, south of Sarnia.

 

Decision and Order

2005

2005 Electricity Decisions and Reports

Date Applicant Case # Description and documents

Dec 9, 2005

Great Lakes Power Limited GLPL

EB-2005-0241

On December 8, the Ontario Energy Board issued a Decision and Order approving the rate schedule for the recovery of the revenue requirements of the electricity transmitters (Hydro One Networks Inc., Great Lakes Power Ltd., Canadian Niagara Power Inc. and Five Nations Energy Inc.). The schedule maintains the currently approved uniform transmission rates, but adjusts the allocation factors among the four transmitters, such that the share of revenue allocated to Great Lakes Power Ltd. increases to reflect its approved revenue requirement, the share of revenue allocated to Hydro One Networks Inc. decreases and the shares of revenue allocated to Canadian Niagara Power Inc. and Five Nations Energy Inc. are unchanged.

 

Decision and Order

Nov 23, 2005

Hydro One Networks Electricity Transmission Licence
(York Region) 
 

RP-2005-0315

The Ontario Energy Board (OEB) today issued its Decision and Order regarding the need for additional electrical power in York Region north of Toronto.

 

Decision

Oct 14, 2005

Attawapiskat Power Corporation 
Attawapiskat First Nation

EB-2005-0233

Today the Ontario Energy Board issued a Decision and Order approving the joint application by Attawapiskat Power Corporation and the Attawapiskat First Nation for final rates based on interim rates approved by the Board on December 23, 2003.

 

Decision and Order

Sep 30, 2005

Ontario Power Authority (OPA)

EB-2005-0302

Today the Ontario Energy Board issued the licence of the Ontario Power Authority (OPA).

 

Decision and Order

 

Licence

Sep 20, 2005

Independent Electricity System Operator (IESO)

EB-2004-0477

Today the Board is issuing its Supplementary Decision in the matter of the IESO’s proposals on stakeholder engagement. The Board received one reply to its September 6, 2005 request for comments.

 

Decision

Sep 19, 2005

PowerStream Inc.
Aurora Hydro Connections Limited.

EB-2005-0254

Today the Ontario Energy Board issued a Decision allowing PowerStream Inc. to acquire all outstanding shares in, and to subsequently amalgamate with, Aurora Hydro Connections Limited.

Decision and Order

Sep 16, 2005

Greater Sudbury Hydro Inc.

 

West Nipissing Energy Services Ltd.

EB-2005-0234

Today the Ontario Energy Board issued a Decision allowing Greater Sudbury Hydro Inc. to acquire all outstanding shares in West Nipissing Energy Services Ltd.

 

Decision and Order

Sep 16, 2005

Veridian Connections Inc. 

 

Gravenhurst Hydro Electric Inc.

EB-2005-0257

Today the Ontario Energy Board issued a Decision allowing Veridian Connections Inc. to acquire all outstanding shares in, and to subsequently amalgamate with, Gravenhurst Hydro Electric Inc.

 

Decision and Order

Aug 31, 2005

Greater Sudbury Hydro Inc.

 

PowerStream Inc.

 

Aurora Hydro Connections Limited

 

Veridian Connections Inc.

 

Gravenhurst Hydro Electric Inc.

RP-2005-0018
EB-2005-0234
EB-2005-0254
EB-2005-0257

Today the Ontario Energy Board issued a Decision following a combined hearing involving three applications for approval in relation to the acquisition of shares in (and in two cases the amalgamation of) electricity distribution companies. The Decision sets out the test to be used in deciding applications for the approval of share acquisitions and amalgamations under section 86 of the Ontario Energy Board Act, 1998.

 

Decision

Jul 29, 2005

Tillsonburg Hydro Inc.

EB-2005-0205

Today, the Ontario Energy Board issued its Decision and Order approving Tillsonburg’s application for a distribution rate adjustment to recover its 1999 net loss.”

 

Decision and Order

Jul 28, 2005

Superior Wind Prince Power Inc.

EB-2005-0249

The Ontario Energy Board today issued a Decision and Order granting Superior Wind Prince Power Inc. leave to construct transmission facilities which will connect a wind farm to the transmission system of Great Lakes Power Ltd. (GLPL).

 

Decision and Order

Jul 27, 2005

Cambridge and North Dumfries Hydro Inc.’s (CNDHI)

EB-2005-0285

Today the Ontario Energy Board issued a Decision denying Cambridge and North Dumfries Hydro Inc.’s (CNDHI) application for a rate adjustment to recover in rates, costs associated with its MTS#1 transformer station which was built in 2002.

 

Decision with reasons

Jul 25, 2005

Hydro One Networks Inc.

RP-1999-0057
EB-2002-0424

The Board issued a Decision and Order covering two elements of the TSC . The first, in Section 2.6 of the TSC (section 4.6 of the Revised Code), addresses the need for transmitters to develop rules and procedures in order to enable them to require that non-compliant customer equipment be brought into compliance with the performance standards and technical requirements of the TSC. The second, in Section 2.5 of the TSC (Section 4.5 of the Revised Code), requires transmitters to file delivery point performance standards with the Board for its review and approval.

 

Decision and Order

Jul 18, 2005

De Beers Canada Inc.,

Hydro One Networks Inc. and Five Nations Energy Inc. (FNEI)

EB-2004-0545

Today the Ontario Energy Board issued a Decision and Order approving the joint application by De Beers Canada Inc., Hydro One Networks Inc. and Five Nations Energy Inc. (FNEI) to construct transmission facilities that will connect De Beers Canada Inc.’s planned Victor Diamond Mine in Northern Ontario to Ontario’s transmission grid.

 

Decision and Order

Jul 8, 2005

Hydro One Networks Inc.

EB-2004-0476

Today the Ontario Energy Board issued a Decision and Order granting Hydro One Networks Inc. leave to construct transmission facilities in the Niagara region. The Board had previously issued an Interim Decision and Procedural Order outlining the additional evidence it required before it could make a final decision.

 

Decision and Order

Jun 27, 2005

Erie Shores Wind Farm Limited Partnership

EB-2005-0230

The Ontario Energy Board today issued an Order granting an application by Erie Shores Wind Farm Limited Partnership (Erie Shores) for leave to construct transmission facilities which will connect a wind farm to the transmission facilities of Hydro One Networks Inc. The Order follows an oral Decision made by the Board during a hearing last week.

 

Order

 

Decision/Hearing Transcript (dated June 20, 2005)

Jun 24, 2005

Chatham-Kent Energy Inc.

EB-2005-0255

The Ontario Energy Board today issued a Decision allowing Chatham-Kent Energy Inc. (“CKEI”) to acquire all outstanding shares in Middlesex Power Distribution Corporation (“MPDC”).

 

Decision and Order

Jun 21, 2005

Veridian Connections Inc.

EB-2005-0256

Today the Ontario Energy Board today issued a Decision allowing Veridian Connections Inc. to acquire all outstanding shares in and subsequently amalgamate with Scugog Hydro Energy Corporation.

 

Decision and Order

Jun 16, 2005

Oakville Hydro

EB-2005-0292

The Ontario Energy Board has issued its oral Decision on the Oakville Hydro Motion to vary (EB-2005-0292) the Board's May 11, 2005 Reasons for Decision on Oakville's Large User Adjustment Application (EB-2004, 200527) and has amended those Reasons for Decision.

 

Decision with Reasons

 

Amended EB-2004, 200527 Reasons, click here...

Jun 1, 2005

Espanola Regional Hydro Distribution Corporation (Espanola Hydro)

EB-2005-0243

The Ontario Energy Board has denied an application from Espanola Regional Hydro Distribution Corporation (Espanola Hydro) for a rate increase to its large commercial customers. The Board ruled that the distributor had not provided sufficient financial and regulatory information needed to make an informed decision.

 

Decision and Order

May 24, 2005

Independent Electricity System Operator (IESO)

EB-2004-0477

Today the Ontario Energy Board issued its Decision regarding 2005 fees for the Independent Electricity System Operator (IESO).

 

Decision

May 18, 2005

Hydro One Networks Inc.

EB-2004-0476

Today the Ontario Energy Board issued an Interim Decision in Hydro One Networks Inc.’s application to construct transmission facilities in the Niagara region.

 

Interim Decision *

 

Procedural order no.5

 

* Note: section 2.5, paragraph 2 was revised on May 24, 2005

May 12, 2005

Oakville Hydro Electricity Distribution Inc.

EB-2004-0527

The Ontario Energy Board has issued reasons relating to its April 1, 2005 Decision on Oakville Hydro’s 2005 distribution rates.

 

Amended Decision with Reasons (June 15, 2005)

Apr 5, 2005

Great Lakes Power Limited

EB-2004-0505

The Board today issued an Order amending Great Lakes Power Limited's transmission rate order, prescribing Wholesale Meter Services Rebates and Exit Charges.

 

Decision and Order

Apr 1, 2005

PowerStream Inc.

EB-2005-0209

The Ontario Energy Board (the Board) has issued its Decision on an application by PowerStream Inc. authorizing changes to rates charged to customers for the utility’s Network Retail Transmission Service Rate (NRTSR) and Connection Retail Transmission Service Rate (CRTSR). Retail transmission service rates for distributors recover transmission service costs charged by the Independent Electricity System Operator (IESO) for transmission connection and network services.

 

Decision and Order

 

Appendix A

Apr 1, 2005

2005 Electricity Distribution Rates

n/a

Between March 15-31, the OEB issued Decisions on utilities' applications for distribution rate changes for 2005. To view the Decisions and the impact on a typical residential consumer bill, click here.

Mar 29, 2005

Approved Conservation and Demand Management (CDM) Plans

n/a

The OEB has approved all Conservation and Demand Management (CDM) Plan applications. To view a summary of the CDM Plan, Budget and a copy of the Decision and Order: Click here.

Mar 15, 2005

Electricity Local Distribution Companies ("utilities")

various

Between March 15-31, the OEB issued Decisions on utilities' applications for distribution rate changes for 2005. To view the Decisions and the impact on a typical residential consumer bill, click here.

Mar 11, 2005

Hydro One
Networks Inc.

EB-2004-0436

Today the Board approved an application by Hydro One to build a 2.2km tunnel under the City of Toronto to carry cables which will increase the security, reliability and maintainability of the electricity grid in the Toronto area. The $44.7m project will place 230kV cables 20 metres below the road surface, connecting the John and the Esplanade transformer stations, and will enable future expansion of the grid to accommodate increasing load in the area. Read the full decision here.

 

Decision and Order

Mar 8, 2005

Canadian Cable Television Association

RP-2003-0249

The Ontario Energy Board today established rates for telecommunication and cable companies wanting to use electric utility poles for the purpose of supporting transmission lines. The ruling follows an application by the Canadian Cable Telecommunications Association on behalf of 23 CCTA members who operate systems in Ontario.

 

Decision and Order

Mar 3, 2005

Hydro One Brampton Networks Inc.

EB-2005-0215

On March 2, 2005, the Board issued its Decision and Order in connection with Hydro One Brampton Networks Inc.’s request to establish a deferral account to record pension contribution costs and associated carrying charges.

 

Cover Letter

 

Decision and Order

Feb 22, 2005

Hydro One Networks Inc. and Hydro One Networks Brampton Inc.

RP-2004-0203

On February 18, 2005, the OEB, by the way of an oral decision, approved the Conservation and Demand Management (CDM) Plans of Hydro One Networks Inc. (HONI) and Hydro One Networks Brampton Inc. (Brampton).

 

Oral Decision

 

Schedule A

 

Schedule B

Feb 11, 2005

Enersource Hydro Mississauga Inc.

EB-2005-0196

Today the Board issued its Decision and Order in connection with Enersource Hydro Mississauga Inc.’s request to establish a deferral account to record pension contribution costs and associated carrying charges.

 

Cover Letter

 

Decision and Order

Jan 26, 2005

Ontario Energy Board

RP-2004-0196

The Ontario Energy Board today submitted its proposed implementation plan on smart meters to the Minister of Energy. The plan outlines a basic smart meter system in Ontario to measure how much electricity a consumer uses each hour of the day.

 

Smart Meter Implementation Plan - Report of the Board to the Minister

Jan 12, 2005

Hamilton Hydro Inc. and St. Catharines Hydro Utility Services Inc.

EB-2004-0504

The Ontario Energy Board issued a decision allowing Hamilton Hydro Inc. (HHI) and St. Catharines Hydro Utility Services Inc. (SCHUSI) to amalgamate. The utilities made an application proposing the amalgamation to the Board on November 19, 2004.

 

Press release

 

Cover letter

 

Decision and Order

2005 Gas Decisions and Reports

Date Applicant Case # Description and documents

Dec 22, 2005

Enbridge Gas Distribution Inc.

EB-2005-0001
EB-2005-0437

The Ontario Energy Board has issued a partial decision on Enbridge Gas Distribution's DSM plan which was filed as part of its 2006 Rate application. The partial decision approves elements of that plan and includes information on a natural gas DSM generic hearing that will occur in 2006.

 

Partial Decision with Reasons

Dec 21, 2005

Enbridge Gas Distribution Inc.

EB-2005-0001
EB-2005-0437

EB-2005-0524

The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2006.

 

Interim Order

 

Decision and Order

 

Amendment to Appendix B

 

Dec 19, 2005

Natural Resource Gas Limited (NRG)

EB-2005-0540

The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective January 1, 2006.

 

Decision and Order

Dec 12, 2005

Union Gas Limited

EB-2005-0531

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Customers’ bills will change depending on the amount of gas used, type of customer and the location of the customer.

 

Decision and Order

Nov 15, 2005

Gas Distribution Access Rule

RP-2000-0001

Today the Ontario Energy Board issued a Decision and Order approving the form of Service Agreement and Electronic Business Transactions Standards for the purposes of the Gas Distribution Access Rule. That Rule was developed to facilitate competition in the sale of gas by establishing rules governing the gas distributor-gas vendor relationship.

 

Decision and Order

Oct 28, 2005

Union Gas Limited (Union)

RP-2005-0025
EB-2005-0474 
EB-2005-0475 
EB-2005-0476

Today the Board issued its decision in regard to applications from Union Gas. The Board approved the terms, volumes, and parties to three long term gas storage agreements. The agreements are with Duke Energy Marketing Canada Corp., NJR Energy Services Company and Suncor Energy Products.

 

Decision and Order

Oct 13, 2005

Union Gas Limited (Union)

EB-2005-0449

Today the Ontario Energy Board ruled on a motion respecting an application by Union Gas Limited (Union) to establish new rates for 2006. The Board found the evidence provided was insufficient to grant Union’s request at this time. The procedural motion sought input from participants on how the Board ought to proceed with the application.

 

Decision on Motion

Oct 6, 2005

Natural Resource Gas Limited (NRG)

RP-2004-0167
EB-2005-0188

The Ontario Energy Board (the “Board”) today ruled on a motion by Natural Resource Gas (NRG) to re-hear and vary certain findings of the Board’s December 20, 2004 Decision regarding the utility’s rates.

 

Decision with Reasons

Sep 23, 2005

Enbridge Gas Distribution Inc.

EB-2005-0461

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2005. These changes will increase total costs for a typical residential customer.

Decision and Order

Amendment to Appendix A

 

Sep 23, 2005

Natural Resource Gas Limited

EB-2005-0466

The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective October 1, 2005.

 

Decision and Order

Sep 14, 2005

Union Gas Limited

EB-2005-0462

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Customers’ bills will change depending on the amount of gas used, type of customer and the location of the customer.

 

Decision and Order

Sep 13, 2005

Gas Distribution Access Rule

RP-2000-0001

The Board has issued a Procedural Order requesting comments on a staff Proposal for the Electronic Business Transactions (EBT) Standards Appendix to the Service Agreement under the Gas Distribution Access Rule (RP-2000-0001), in accordance with the Board’s Decision and Order issued May 9, 2005.

 

Decision

Aug 2, 2005

Union Gas Limited

RP-2005-0017
EB-2005-0258
EB-2005-0266

Today the Ontario Energy Board issued a Decision and Order approving applications by Union Gas Limited (Union) to amend its natural gas storage contract with Gaz Metro Limited Partnership, and replace an expired natural gas storage contract with Nexen Marketing.

 

Decision and Order

Jul 6, 2005

Union Gas Limited

EB-2005-0201

The Ontario Energy Board today issued an Order granting Union Gas Limited (Union) leave to construct two sections of natural gas pipeline and associated compressor station modifications in the southwestern region of the province. The expansion will be used to meet the increasing natural gas demands of Ontario’s current and future customers. The Order follows an oral Decision made by the Board during a hearing last week.

 

Order

 

Decision/Hearing Transcript (Oral decision maybe found at page 75 of the Transcript, dated June 28, 2005)

Jun 23, 2005

Enbridge Gas Distribution Inc.

EB-2005-0291

Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective July 1, 2005. These changes will increase total costs for a typical residential customer.

 

Decision and Order

Jun 20, 2005

Natural Resource Gas Limited

EB-2005-0235

The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective July 1, 2005.

 

Decision and Order

Jun 20, 2005

Tribute Resources Inc. and Tipperary Gas Corp.

RP-2003-0253
EB-2003-0314
EB-2003-0315
EB-2003-0316
EB-2003-0317

On June 17, the Board issued it’s decision (with reasons to follow) approving Tribute Gas Corp.’s (Tribute) application to inject, store and withdraw gas in Tipperary designated storage pool in Huron County, Ontario and approving rates for the sale of gas storage services. Earlier in the proceeding, the Board approved Tribute’s applications for designation as gas storage area and issued a favorable report of the Board to the Minister of Natural Resources with respect to applications for licenses to drill three wells in the storage area. Also, by an earlier order, the Board determined compensation to be paid by Tribute to the landowners. The decision issued on June 17, 2005, collectively with the previous approvals will support the conversion of the existing Tipperary north pool in the Township of Central Huron from gas production to gas storage.

 

Reasons for June 17th Decision (Aug 25, 2005)

 

Decision with Reasons (Jun 17, 2005)

 

Compensation order (May 31, 2005)

 

Partial Decision (Oct 25, 2004)

Jun 10, 2005

Union Gas Limited

EB-2005-0290

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). There will also be temporary credits for delivery and transportation rates from July 1, 2005 to December 31, 2005 reflected in the rate changes. The credits relate to 2004 deferral accounts and 2003 earning sharings. Spread over the five months, the credits are equivalent to a total of about $5 for Southern rate zone customers (residential) and about $20 for all other Union residential customers.

 

Press release

 

QRAM Decision

 

Appendicies

May 19, 2005

Union Gas Limited

RP-2003-0063
EB-2004-0542

Today, the Ontario Energy Board issued its Decision regarding an application from Union Gas to alter its M16 rate schedule for natural gas transportation for embedded storage pools.

 

Decision with Reasons

May 9, 2005

Gas Distribution Access Rule

RP-2000-0001

The Ontario Energy Board today announced that it will work with the natural gas sector to implement the Board’s Gas Distribution Access Rule. This decision comes after natural gas distributors and marketers were unable to agree on the terms of a Service Agreement and the supporting business / transaction standards required by the Rule. The Service Agreement outlines the entire relationship between natural gas distributors and marketers, including switching suppliers, billing and settlements.

 

Decision

Mar 30, 2005

Ontario Energy Board

RP-2004-0213

The Ontario Energy Board today released its report outlining a regulatory framework for the province’s natural gas sector. The report provides the Board’s analysis of current issues and its conclusions to support the long-term evolution of a more efficient natural gas sector, leading to greater stability for industry and sustainable benefits for consumers.

 

Natural Gas Regulation in Ontario: A Renewed Policy Framework

Mar 24, 2005

Natural Resource Gas Limited

EB-2005-0235

The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to natural gas supply charges are effective April 1, 2005.

 

Decision

Mar 24, 2005

Enbridge Gas Distribution Inc.

EB-2005-0229

The Ontario Energy Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective April 1, 2005. These changes will decrease total costs for a typical residential customer.

 

Decision

Mar 18, 2005

Union Gas Limited

RP-2003-0063
EB-2005-0189

The Board issued its Decision and Order in the Notice of Motion filed by Union Gas Limited on February 2, 2005. Union's Notice of Motion sought an Order to vary certain provisions of the Board's December 15, 2004 Decision that set Union's 2005 rates (file number RP-2003-0063/EB2004/0480). The Board denied Union's request to vary the Board's December 15, 2004 Decision.

 

Decision

Jan 26, 2005

Enbridge Gas
Distribution Inc.

RP-2003-0203

Today the Ontario Energy Board issued a Decision disallowing Enbridge Gas Distribution Inc. (Enbridge) from including $7.1 million of Customer Care Services (“CCS”) costs as a deduction in its 2004 earnings sharing calculation.

 

Press release

 

Decision with Reasons

2004

2004 Electricity Decisions

Date Applicant Case # Description and documents

Dec 10-04

Enersource, Hamilton, Hydro Ottawa, PowerStream, Toronto Hydro and Veridian

RP-2004-0203

Today the Ontario Energy Board issued its Decision approving applications from six of the province’s largest local electricity distribution companies for their third installment (“tranche”) of incremental Market Adjusted Revenue Requirement (MARR) related to conservation and demand management (CDM) initiatives.

 

Decision

June 8-04

Initiated by the Ontario Energy Board

RP-2002-0120

The Board today issued its Phase 1 Policy Decision in the Transmission System Code Proceeding. This Decision reflects the Board's findings regarding Available Capacity, Transmission System Bypass, Cost Responsibility, Contestability, Economic Evaluation and Contractual issues.

 

Decision

 

Appendix A - List of Parties

 

Appendix B - Settlement Conference Facilitator's Report

 

Appendix C - Synopsis of the Board Decision

 

(Note: For specific findings and reasoning supporting those findings, it is important to refer to the Decision itself. All matters of interpretation are dependent on the words of the Decision)

Mar 1-04

Centre Wellington Hydro

 

Veridian Connections Inc.

 

EnWin Powerlines Ltd.

 

Erie Thames Powerlines Corp.

 

Chatham-Kent Hydro Inc.
Essex Powerlines Corp.

 

Cooperative Hydro Embrun Inc.

 

Hydro One Networks Inc.

RP-2003-0044

The Board has issued its Decision with Reasons in the matter of applications by various electricity distributors for amendments to their licensed service areas.

 

Decision with Reasons

2004 Gas Decisions

Date Applicant Case # Description and documents

Dec 22-04

Enbridge Gas Distribution Inc.

RP-2003-0203

The Ontario Energy Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective January 1, 2005. These changes will increase total costs for a typical residential customer.

 

Press release

 

2005 Final Rate Order

 

QRAM Decision and Interim Rate Order

Dec 21-04

Natural Resource Gas Limited

RP-2004-0167

The Board issued its Decision with Reasons in Natural Resource Gas' application for rates for its 2005 fiscal year. The Board has also issued its Decision in the QRAM application for rates effective January 1, 2005.

 

2005 Rates Decision

 

QRAM Decision

Dec 16-04

Union Gas Limited

RP-2003-0063

The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) will charge to its customers effective January 1, 2005. The changes will result in an increase to customer bills, depending on the type of customer, location of the customer and the amount of natural gas used. The new charges incorporate Union’s approved 2005 delivery rates and the January 1st quarterly commodity price adjustments under the Quarterly Rate Adjustment Mechanism (QRAM).

 

Press release

 

QRAM Decision

 

2005 Decision and Rate Order

Dec 3-04

 

Enbridge Gas Distribution Inc.

RP-2003-0203

Decision
The Ontario Energy Board today issued its Decision on the application by Enbridge Gas Distribution Inc. (Enbridge) to expand the scope of an existing deferral account to capture additional costs. The Board’s Decision approves the recording of plaintiff’s costs associated with a class action suit filed by an Enbridge customer regarding late payment penalties.

 

Press release

 

Cover letter

 

Decision

 

Decision - Nov 24-04 
The Ontario Energy Board has issued its Decision on the application by Enbridge Gas Distribution Inc. (Enbridge) for confirmation on the methodology to be used in calculating the earnings sharing mechanism for 2004.

 

Press release

 

Cover Letter

 

Decision

Nov 1-04

 

Enbridge Gas Distribution Inc.

RP-2003-0203

Decision
The Ontario Energy Board today ruled on unresolved issues in the 2005 rates application by Enbridge Gas Distribution Inc. (Enbridge). Rate changes resulting from the Board’s decision will take effect January 1, 2005 along with Enbridge’s January quarterly rate adjustment.

 

Press release

 

Decision

 

Executive Summary

 

Appendix A - Issues List

 

Appendix B - Settlement Proposal

 

Appendix C - Decision on Motion

 

Appendix D - Partial Decision

 

Partial Decision - issued Aug 31-04
The Board issued a Partial Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2005 fiscal year, commencing October 1, 2004.

 

Press release

 

Cover letter

 

Partial Decision with Reasons

May 27-04

Enbridge Gas Distribution Inc.

RP-2003-0203

The Board issued a Decision on Motion in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2005 fiscal year, commencing October 1, 2004.

 

Cover Letter

 

Decision on Motion

March 18-04

Union Gas Limited

RP-2003-0063

The Board today has issued its Decision with Reasons in the matter of an Application by Union Gas Limited for an order or orders approving or fixing just and reasonable rates for the sale, distribution, storage, and transmission of gas for the period commencing January 1, 2004 (RP-2003-0063).

 

Decision

 

Decision (Chapter 12 - revised March 25-04)

 

Executive Summary (revised March 25-04)

 

Appendix A - Return on Equity Calculation

 

Appendix B - Financial Schedule (revised March 25-04)

 

Appendix C - Settlement Agreement

 

Press release (revised March 25-04)

Jan 16-04

Union Gas Limited and Enbridge Gas Distribution Inc.

RP-2002-0158

The Board issued a Decision and Order in respect of applications by Union Gas Limited and Enbridge Gas Distribution Inc. for a review of the Board's guidelines for establishing their respective Return on Equity.

 

Decision and Order

2003

2003 Electricity Decisions

Date Applicant Case # Description and documents

Dec 19-03

Independent Electricity System Operator

RP-2003-0220

The Board today issued its Decision with Reasons with respect to the Independent Electricity System Operator approving its proposed expenditures and revenue requirement and fixing fees which it may charge for the year 2004.

 

Decision with Reasons

Apr 7-03

Ontario Power Generation (OPG) Inc.

RP-2002-0142

OPG application to amend its licence obligations to provide a rebate to consumers under specified circumstances.

 

Decision with Reasons

 

Executive Summary

2003 Gas Decisions

Date Applicant Case # Description and documents

Dec 3-03

Enbridge Gas Distribution Inc.

RP-2002-0135

The Board issued a Decision with Reasons in an application by Enbridge Gas Distribution Inc. in respect of a proposal to establish a Deferred Income Tax Deferral Account and other related matters for its 2002 fiscal year.

 

Decision and Order

Nov 7-03

Enbridge Gas Distribution Inc.

RP-2002-0133

Decision
The Board issued its Decision on Enbridge Gas Distribution Inc.’s application to set rates and other charges for 2003 for the sale, distribution, transmission and storage of natural gas. Final Enbridge rates for 2003 have already been approved by the Board and were implemented on May 1, 2003. The current Decision addresses issues where all parties could not reach agreement during settlement efforts. The issues do not directly affect the current 2003 rates.

 

Press release

 

Decision Summary

 

Decision with Reasons

 

Appendix A - Issues List

 

Appendix B - Settlement Proposal

 

Appendix C - Financial Statements (Excel file)


Partial Decision - issued Aug 22-03
The Board issued a Partial Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2003 fiscal year, commencing October 1, 2002.

 

The Partial Decision deals with certain matters relating to the company's demand-side management programs.

 

Partial Decision with Reasons

Sep 4-03

Enbridge Gas Distribution Inc.

RP-2003-0048

The Board issued its Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2004 fiscal year, commencing October 1, 2003.

 

Oral Decision

May 8-03

Union Gas Limited

RP-2002-0130

The Board issued its Decision with Reasons in an application by Union Gas Limited for rates for the year commencing January 1, 2003. This application arises under a Performance Based Regulation (PBR) methodology for setting rates. The Board had approved a three year trial PBR plan under which rates would be changed for years commencing January 1, 2001, 2002, 2003.

 

Decision with Reasons

 

Settlement Agreement

Feb 11-03

Enbridge Gas Distribution Inc.

RP-2001-0032

The Board issued its Decision with Reasons in the matter of a motion by Enbridge Gas Distribution Inc. for review and variance of the decision of the Board as set out in its RP-2001-0032 Decision with Reasons dated December 13, 2002.

 

Decision on Motion

2002

2002 Electricity Decisions

Date Applicant Case # Description and documents

June 12-02

Hydro One Networks Inc.

RP-2000-0023

The Board's Decision with Reasons in an application by Hydro One Networks Company Inc. for an order approving rates for the distribution of electricity. The Settlement Agreement is not available electronically, but is available for viewing in the Board's Public File Room.

April 30-02

Uniform Pooled Transmission Rates

RP-2001-0034
RP-2001-0035
RP-2001-0036
RP-1999-0044

As a result of the passage of the Energy Competition Act, 1998, the former Ontario Hydro was required to separate its transmission function from its power generation function. And, as a result, the monopoly portion of the new entity, Hydro One Networks Inc., was required to apply to the Board for regulated transmission rates. The transmission rates of Hydro One are used to charge for the delivery of bulk electricity to the LDCs and directly connected industrial customers. For LDCs who are wholesale market participants these rates will be collected from the LDC by the IESO.

 

On April 30, 2002, after a hearing of an the application filed by Hydro One for transmission rates, the Board issued its Decision and Rate Order:

 

Transmission Rates Decision (RP-1999-0044)

 

Appendix A

 

Appendix B

 

Appendix C

Jan 28-02

Independent Electricity System Operator (IESO)

RP-2001-0046

The Board's Decision with Reasons in a submission by the IESO for an order approving its proposed expenditures and revenue requirement and fixing fees which it may charge in 2002

 

Decision with Reasons

 

Appendix A - Settlement Agreement

2002 Gas Decisions

Date Applicant Case # Description and documents

Dec 18-02

Enbridge Gas Distribution Inc.

RP-2001-0032

The Board's Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution and storage of gas commencing October 1, 2001.

 

Decision (207 pages)

 

Highlights

 

Settlement Agreement

 

Final Issues List

 

Financial Schedules (Excel)

Sep 20-02

Union Gas Limited

RP-2001-0029

The Board's Decision with Reasons in an application by Union Gas Limited for rates for 2001 and 2002 including annual inflation factors, tax rate and certain specific recoverable costs, all within an approved PBR (Performance-Based Regulation) plan.

 

Decision with Reasons (131 pages)

 

Settlement Agreement (The appendix is not available electronically, but is available for viewing in the Board's Public File Room.)

 

Questions & Answers

July 31-02

Union Gas Limited

RP-2000-0078

The Board's Decision with Reasons in an application by Union Gas Limited for an order of the Board approving the unbundling of certain rates charged by Union Gas Limited for the sale, distribution, transmission and storage of gas.

 

Decision with Reasons

 

Settlement Agreement (The appendices are not available electronically, but are available for viewing in the Board's Public File Room.)

 

Issues List

2001

2001 Electricity Decisions

Date Applicant Case # Description and documents

Dec 17-01

Pooled Transmission Rates

RP-1999-0044
RP-2001-0034
RP-2001-0035 
RP-2001-0036

The Board's Interim Decision and Order for pooled transmission rates, post market opening

Jan 10-01

Independent Electricity System Operator (IESO)

RP-2000-0134

The Board's Decision With Reasons in a submission by the IESO for an order approving its proposed expenditures and revenue requirement and fixing the fees which it may charge for the year 2001.

2001 Gas Decisions

Date Applicant Case # Description and documents

Sep 6-01

Union Gas Limited

EB-2001-0441
RP-1999-0017

The Board's Decision with Reasons in an application by Union Gas Limited for the inclusion of Alliance Pipeline and Vector Pipeline contracts in the portfolio of upstream transportation to be allocated to customers electing direct purchase

Aug 17-01

Enbridge Consumers Gas

RP-2000-0040

The Board's Reasons for Decision in Enbridge Consumers Gas application for rates for the sale, distribution, transmission and storage of gas commencing October 1, 2000.

 

Reasons For Decision

 

Settlement Proposal

July 21-01

Union Gas Limited

RP-1999-0017

The Board's Decision with Reasons in Union Gas Limited's application for rates and other charges in accordance with a performance based rate mechanism commencing January 1, 2000.

 

Decision PDF

 

Executive Summary PDF

 

Appendix A - Issues List PDF

 

Appendix B - PBR - Proposal Summary Excel spreadsheet or PDF

 

Appendix C - Summary of Board Adjustments to Delivery Revenue Excel spreadsheet or PDF

 

Appendix D - Settlement Agreement MS Word or PDF

2000

2000 Electricity Decisions

Date Applicant Case # Description and documents

Sep 29-00

Generic Hearing on The Minister's Directive

RP-2000-0069

The Board's Decision with Reasons, dated September 29, 2000 on the Generic Hearing on The Minister's Directive to the Ontario Energy Board dated June 7, 2000.

 

Decision with Reasons PDF

 

Executive Summary PDF

 

Appendix 1 - Ministers Directive PDF

 

Appendix 2 - Parties to the Proceeding PDF

June 22-00

Toronto Hydro-Electric System

RP-2000-0021
EB-2000-0078

The Board's Decision with Reasons PDF in an application by Toronto Hydro-Electric System for an interim order or orders approving or fixing just and reasonable rates effective July 1, 2000.

May 26-00

Ontario Hydro Networks Company (now Hydro One Networks Inc.)

RP-1999-0044

The Board's Decision with Reasons for Year 2000 Transmission Cost Allocation and Rate Design.

 

Executive Summary PDF 

 

Decision PDF 

Jan 18-00

Performance Based Regulation

RP-1999-0034

The Board's Decision with Reasons which deals with certain issues raised by parties regarding the draft Rate Handbook to govern Performance Based Regulation for licensed electricity distributors.

 

Decision with Reasons PDF

 

Executive Summary PDF

2000 Gas Decisions

Date Applicant Case # Description and documents

Oct 23-00

Heating, Ventilation and Air Conditioning Contractors Coalition ("HVAC")

RP-1999-0058

The Board's Decision with Reasons on the complaint referred to the Board by HVAC under the Affiliate Relationships Code for Gas Utilities PDF

June 29-00

Industrial Gas Users Association of Canada, the Consumers' Association of Canada and the Vulnerable Energy Consumers Coalition

RP-1999-0001

The Board's Decision with Reasons in the matter of a Motion for Review and Variance by the Industrial Gas Users Association of Canada, the Consumers' Association of Canada and the Vulnerable Energy Consumers Coalition of the Board's decision for Enbridge Consumers Gas rates effective January 1, 2000.

 

Decision with Reasons PDF 

June 22-00

Union Gas Limited

E.B.A. 825/872

The Board's Decision with Reasons in the matter of an application by Centra Gas (Ontario) Inc. (now Union Gas Limited) for a franchise renewal within the City of Kingston to serve the area of the former Township of Pittsburgh

Decision with Reasons PDF 

Mar 10-00

Natural Resource Gas Limited

RP-1999-0031

Fiscal 2000 Rates Decision with Reasons:

 

Decision with Reasons PDF

 

Executive Summary PDF 

 

Settlement Agreement PDF 

 

Addendum to Settlement Agreement PDF

 

Impact of Board's Findings in this Decision PDF

1999 and earlier (significant Decisions and Reports issued by the Board prior to January 1, 2000)

Significant Decisions and Reports issued by the Board prior to January 1, 2000

Date Applicant Case # Description and documents

Dec 16, 1999

Enbridge Consumers Gas

RP-1999-0001

In the matter of an application by The Consumers’ Gas Company Ltd., carrying on business as Enbridge Consumers Gas, for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas for its 2000 fiscal year.

 

Decision with Reasons

Oct 18, 1999

Ontario Energy Board

RP-1999-0040

In the matter of a hearing on the Board’s own Motion on a proposed Standard Supply Service Code for electricity distributors.

 

Decision with Reasons

Aug 17, 1999

Enbridge Consumers Gas

EBO179-14
EBO179-15

The Board's ruling on a motion by Enbridge Consumers Gas requesting the Board to review or rehear portions of its Decision with Reasons dated March 31, 1999 in E.B.O. 179-14/15. The motion requested that the Board review or rehear that portion of the Decision with Reasons dealing with the subject of deferred taxes associated with the Company's Rental Program.

 

OEB Ruling on Motion

Apr 22, 1999

Consumers' Gas Company Ltd.

EBRO497-01

Decision with Reasons concerning an application by The Consumers’ Gas Company Ltd. for an order or orders approving rates to be charged for the sale, distribution, transmission and storage of gas for its 1999 fiscal year, and concerning requests for approval of an incentive mechanism in relation to the Operation and Maintenance Expense component of its cost of service, effective during the 2000 through 2002 fiscal years, and an incentive mechanism in relation to Demand Side Management.

 

Decision with Reasons

Aug 20, 1998

Natural Resource Gas Limited

EBRO496

In the matter of an application by Natural Resource Gas Limited for rates.

 

Decision with Reasons

Mar 31, 1998

Centra Gas Ontario Inc.

EBA767
EBA768
EBA769
EBA783

Applications by Centra Gas Ontario Inc. for Orders renewing the terms and conditions upon which the Corporations of the City of Orillia, the Town of Gravenhurst, the Township of Severn and the Town of Bracebridge are, by by-law, to grant to Centra Gas Ontario Inc.

 

Decision with Reasons

Jan 30, 1998

Consumers' Gas Company Ltd.,
Union Gas Limited,
Centra Gas Ontario Inc.

EBO 188

A hearing to inquire into, hear and determine certain matters relating to natural gas system expansion for The Consumers' Gas Company Ltd., Union Gas Limited and Centra Gas Ontario Inc.

 

Report of the Board

Jul 23, 1993

Ontario Energy Board

EBO169III

A report on the demand-side management aspects of gas integrated resource planning for The Consumers' Gas Company Ltd., Centra Gas Ontario Inc. and Union Gas Limited.

 

Report of the Board

Sep 16, 1991

Ontario Energy Board

EBO169

A report on gas integrated resource planning.

 

Report of the Board

Aug 27, 1991

Canadian Pacific Forest Products Limited
Centra Gas Ontario Inc.

EBRO471

In the matter of an application by Canadian Pacific Forest Products Limited for a bypass competitive rate.

 

Decision with Reasons

Mar 1, 1991

Consumers' Gas Company Ltd.

EBRO465

An application by The Consumers' Gas Company Ltd. for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution and transmission of gas for its fiscal year commencing October l, 1990.

 

Decision with Reasons

Oct 15, 1990

British Gas plc
Consumers' Gas Company Ltd

EBRLG35
EBRLG35-1
EBRLG35-3

Proposed acquisition of the common shares of the Consumers' Gas Company Ltd. by British Gas plc.

 

Report of the Board

Jan 31, 1990

Inter-City Gas Corporation

EBRLG34

In the matter of an application for leave of the Lieutenant Governor in Council with respect to the proposed change in control of ICc Utilities (Canada) Ltd.

 

Report of the Board

Nov 1, 1988

Ontario Energy Board

EBO146

Status report of the review by the Ontario Energy Board of its jurisdiction over gathering/production lines.

 

Status Report

Sep 1, 1988

Union Gas Limited

EBLO226
EBLO226A
EBLO226B

An application by Union Gas Limited for leave to construct a natural gas pipeline and ancillary facitities in the Townships of Moore and Sombra, both in the County of Lambton.

 

Decision with Reasons

 

Addendum (Sep 30, 1988)

Jun 1, 1987

Ontario Energy Board

EBO134

A review by the Ontario Energy Board of the Expansion of the Natural Gas System in Ontario.

 

Report of the Board

Nov 17, 1986

Gulf Canada Corporation

EBRLG30

In the matter of an application for leave of the Lieutenant Governor in Council under subsection 26(2) of the Ontario Energy Board Act.

 

Report of the Board

May 21, 1986

Ontario Energy Board

EBO125

In the matter of the Ontario Energy Board's review of franchise agreements and certificates of public convenience and necessity.

 

Report of the Board

Apr 4, 1986

Ontario Energy Board

EBRO410
EBRO411-1
EBRO412-1

In the matter of a hearing relating to interim contract carriage arrangements on the Consumers' Gas Company Ltd.'s, Northern and Central Gas Corporation Limited's and Union Gas Limited's Ontario distribution systems.

 

Reasons for Decision

Aug 2, 1985

Ontario Energy Board

EBRLG28

In the matter of a public hearing to examine and report upon certain matters respecting the implications for energy supply, gas rates and service of a proposed acquisition of certain shares of Union Enterprises Ltd. by Unicorp Canada Corporation.

 

Report of the Board

Jan 1, 1985

Inter-City Gas Corporation
ICG Resources Ltd.
Vigas Propane Ltd.
Norcen Energy Resources Limited

EBO118

EBO119

In the matter of applications under the Ontario Energy Board Act.

 

Report of the Board

Jan 30, 1981

Consumers' Gas Company

EBRO376-I & II

In the matter of a rate application by The Consumers' Gas Company.

 

Reasons for Decision

Apr 2, 1980

Consumers' Gas Company

EBRO369-II

In the matter of a rate application by The Consumers' Gas Company.

 

Reasons for Decision

 