2014
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 19, 2014 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge |
EB-2014-0347 |
The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2015.
|
Dec 18, 2014 |
Great Lakes Power Transmission Inc. |
EB-2014-0238 |
The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2015 and 2016 Transmission Revenue Requirement.
|
Dec 18, 2014 |
Canadian Niagara Power Inc. |
EB-2014-0204 |
The Board has issued an Order for Interim Rates on Canadian Niagara Power Inc.'s 2015 and 2016 Transmission Revenue Requirement.
|
Nov 20, 2014 |
Ontario Power Generation |
EB-2013-0321 |
The Board has issued its Decision regarding Ontario Power Generation’s payment amounts for its regulated hydroelectric and nuclear generating facilities.
|
Nov 6, 2014 |
Ontario Power Authority |
EB-2013-0326 |
The Board has issued its Decision and Order on OPA's application for a review of its proposed expenditure and revenue requirements and fees for the year 2014.
|
Jul 18, 2014 |
In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge, effective July 1, 2014. |
EB-2014-0222 |
The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge effective July 1, 2014.
|
May 22, 2014 |
Independent Electricity System Operator |
EB-2013-0381 |
The Board has issued its Decision and Order on an application by the Independent Electricity System Operator for the approval of its proposed expenditure and revenue requirements and its proposed fees for the 2014 fiscal year.
|
Jan 16, 2014 |
In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2014. |
EB-2014-0005 |
The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2014. |
Jan 9, 2014 |
Hydro One Networks Inc. |
EB-2012-0031 |
The Board has issued its Rate Order for the 2014 Ontario Uniform Transmission Rates.
|
Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 19, 2014 |
Enbridge Gas Distribution Inc. |
EB-2014-0348 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2015.
For more information about current natural gas rates, click here... |
Dec 19, 2014 |
Union Gas Limited |
EB-2014-0356 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2015.
For more information about current natural gas rates, click here... |
Dec 19, 2014 |
Natural Resource Gas Limited |
EB-2014-0358 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2015. Decision and Interim Rate Order
For more information about current natural gas rates, click here... |
Dec 18, 2014 |
Union Gas Limited |
EB-2014-0271 |
The Board has issued its Decision and Order on an application by Union Gas Limited for an order or orders approving a multi-year incentive rate mechanism to determine rates for distribution, transmission and storage of gas effective January 1, 2015. |
Sep 25, 2014 |
Union Gas Limited |
EB-2014-0208 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2014.
Final Decision and Order (Nov 20-14)
For more information about current natural gas rates, click here... |
Sep 25, 2014 |
Natural Resource Gas Limited |
EB-2014-0206 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2014.
For more information about current natural gas rates, click here... |
Sep 25, 2014 |
Enbridge Gas Distribution Inc. |
EB-2014-0191 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2014.
For more information about current natural gas rates, click here... |
Aug 22, 2014 |
Enbridge Gas Distribution Inc. |
EB-2012-0459 |
The Board has issued its Decision and Rate Order on an application by Enbridge Gas Distribution Inc. for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas commencing January 1, 2014.
|
Aug 14, 2014 |
Board initiated proceeding |
EB-2014-0199 |
The Board has issued its Decision and Order on its proceeding to review the Quarterly Rate Adjustment Mechanism process for natural gas distributors. |
Jul 17, 2014 |
Enbridge Gas Distribution Inc. |
EB-2012-0459 |
The Board has issued its Decision with Reasons in an application for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas commencing January 1, 2014 to 2018. |
Jun 26, 2014 |
Enbridge Gas Distribution Inc. |
EB-2014-0039 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2014.
For more information about current natural gas rates, click here... |
Jun 19, 2014 |
Union Gas Limited |
EB-2013-0109 |
The Board has issued its Decision and Rate Order on an application by Union Gas Limited for an order or orders clearing certain non-commodity related deferral accounts and sharing utility earnings pursuant to a Board approved earnings sharing mechanism. |
May 22, 2014 |
Enbridge Gas Distribution Inc. |
EB-2014-0039 |
The OEB announced that it will extend the period for which most Ontario residential customers of Enbridge Gas Distribution are required to pay for unexpected, high prices incurred during the cold winter months. |
May 8, 2014 | Union Gas Limited | EB-2013-0109 |
The Board has issued its Decision in an application for an order or orders clearing certain deferral accounts and sharing utility earnings pursuant to a Board-approved earnings sharing mechanism. The Decision also addresses a review of the Board's Decision and Order in EB-2011-0210 requiring Union to annually prepare and file separate audited financial statements for that portion of its business that is subject to rate regulation. |
Apr 2, 2014 |
Natural Resource Gas Limited |
EB-2014-0053 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2014. Decision and Interim Order (Apr 1-14)
Interim Rate Order (Apr 2-14)
For more information about current natural gas rates, click here... |
Mar 27, 2014 |
Enbridge Gas Distribution Inc. |
EB-2014-0039 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2014.
For more information about current natural gas rates, click here... |
Mar 21, 2014 |
Union Gas Limited |
EB-2014-0050 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2014.
For more information about current natural gas rates, click here... |
Jan 30, 2014 | Enbridge Gas Distribution Inc. and Union Gas Limited |
EB-2012-0451 |
The Board has issued its Decision on the combined GTA-Parkway Proceeding regarding applications filed by Enbridge Gas Distribution Inc. and Union Gas Limited for leave to construct. |
2013
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 19, 2013 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge |
EB-2013-0396 |
The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2014.
|
Dec 19, 2013 |
Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP |
EB-2012-0300 |
The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2014 Transmission Revenue Requirement.
|
Oct 8, 2013 |
K2 Wind Ontario Limited Partnership |
EB-2012-0458 |
The Board has issued its Decision and Order on an application by K2 Wind Ontario Limited Partnership for an Order granting leave to construct a new transmission line and associated facilities.
|
Aug 7, 2013 |
In the matter of a Board-initiated proceeding to designate an electricity transmitter to undertake development work for a new electricity transmission line between Northeast and Northwest Ontario: the East-West Tie Line |
EB-2011-0140 |
The Board has chosen Upper Canada Transmission Inc. as the transmitter to complete development work for the East-West Tie Line.
|
Jul 10, 2013 |
In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2013. |
EB-2013-0231 |
The Board has issued its Decision on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2013.
|
Mar 28, 2013 |
Independent Electricity System Operator as Smart Metering Entity |
EB-2012-0100 EB-2012-0211 |
The Board has issued its Decision and Order on an Application by the Independent Electricity System Operator for an Order fixing a Smart Metering Entity charge effective May 1, 2013.
Effective May 1, 2013, the SME charge to be levied and collected by the licensed electricity distributors identified in the Board’s annual Yearbook of Electricity Distributors from Residential and General Service <50kW customers shall be $0.79 per month. The SME charge shall be in effect from May 1, 2013 to October 31, 2018.
|
Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 20, 2013 |
Enbridge Gas Distribution Inc. |
EB-2013-0406 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2014.
For more information about current natural gas rates, click here... |
Dec 19, 2013 |
Union Gas Limited |
EB-2013-0413 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2014.
For more information about current natural gas rates, click here... |
Dec 16, 2013 |
Natural Resource Gas Limited |
EB-2013-0412 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2014.
For more information about current natural gas rates, click here... |
Oct 7, 2013 |
Union Gas Limited |
EB-2013-0202 |
The Board has issued its Decision and Order on an application by Union Gas Limited for an order or orders approving a multi-year incentive rate mechanism to determine rates for distribution, transmission and storage of gas effective January 1, 2014.
|
Sep 23, 2013 |
Enbridge Gas Distribution Inc. |
EB-2013-0295 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2013.
For more information about current natural gas rates, click here... |
Sep 19, 2013 |
Natural Resource Gas Limited |
EB-2013-0317 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2013.
For more information about current natural gas rates, click here... |
Sep 19, 2013 |
Union Gas Limited |
EB-2013-0316 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2013.
For more information about current natural gas rates, click here... |
Sep 12, 2013 |
Natural Resource Gas Limited |
EB-2013-0183 |
The Board has issued its Rate Order on an application by Natural Resource Gas Limited for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas effective October 1, 2013.
Decision and Order (issued Aug 22, 2013)
|
Jul 4, 2013 |
Enbridge Gas Distribution Inc. |
EB-2012-0394 |
The Board has issued its Decision and Order on Settlement Agreement in an application by Enbridge Gas Distribution Inc. seeking approval to update its Demand Side Management Plan
|
Jun 25, 2013 |
Enbridge Gas Distribution Inc. |
EB-2013-0206 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2013.
For more information about current natural gas rates, click here... |
Jun 20, 2013 |
Natural Resource Gas Limited |
EB-2013-0205 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective July 1, 2013.
For more information about current natural gas rates, click here... |
Jul 19, 2013 |
Union Gas Limited |
EB-2013-0215 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective July 1, 2013.
For more information about current natural gas rates, click here... |
May 2, 2013 |
Enbridge Gas Distribution Inc. |
EB-2012-0055 |
The Board has issued its Decision and Order in an application by Enbridge Gas Distribution Inc. for an order or orders approving the clearance or disposition of amounts recorded in certain deferral or variance accounts.
|
Mar 21, 2013 |
Enbridge Gas Distribution Inc. |
EB-2013-0045 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2013.
For more information about current natural gas rates, click here... |
Mar 20, 2013 |
Natural Resource Gas Limited |
EB-2013-0052 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2013.
For more information about current natural gas rates, click here... |
Mar 19, 2013 |
Union Gas Limited |
EB-2012-0337 |
The Board has issued its Decision and Order on Union Gas Limited`s 2013-2014 Large Volume Demand Side Management Plan. |
Mar 19, 2013 |
Union Gas Limited |
EB-2013-0033 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2013.
For more information about current natural gas rates, click here... |
Feb 28, 2013 |
Union Gas Limited |
EB-2012-0087 |
The Board has issued its Decision and Rate Order on an application by Union Gas Limited for an Order or Orders amending or varying the rate or rates charged to customers as of October 1, 2012.
|
Jan 17, 2013 |
Union Gas Limited |
EB-2011-0210 |
The Board has issued its Decision and Rate Order approving just and reasonable rates and other charges for Union Gas Limited for the sale, distribution, transmission and storage of natural gas commencing January 1, 2013.
|
2012
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 20, 2012 |
Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP |
EB-2012-0300 |
The Board has issued a Decision and Order on Great Lakes Power Transmission Inc.'s 2013 Transmission Revenue Requirement.
|
Dec 20, 2012 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2013 |
EB-2012-0453 |
The Board has issued a Decision and Order setting the charge for Rural or Remote Electricity Rate Protection (RRRP) for 2013.
|
Dec 20, 2012 |
Hydro One Networks Inc. |
EB-2012-0031 |
The Board has issued its Rate Order for 2013 Ontario Uniform Transmission Rates.
|
Sep 13, 2012 |
Canadian Distributed Antenna Systems Coalition |
EB-2011-0120 |
The Board has issued its Decision on Preliminary Issue and Order with respect to an application by the Canadian Distributed Antenna Systems Coalition (CANDAS) for access to LDC power poles.
|
Jun 7, 2012 |
Toronto Hydro-Electric System Limited |
EB-2012-0079 |
The Board has released its Decision and Order regarding Toronto Hydro-Electric System Limited’s application seeking approval to establish a deferral account.
|
Apr 3, 2012 |
Hydro One Remote Communities Inc. |
EB-2011-0427 |
The Board has issued its Decision on the Hydro One Remote Communities Inc. application to adopt the USGAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, commencing January 1, 2012.
|
Mar 23, 2012 |
Hydro One Networks Inc. |
EB-2011-0399 |
The Board has issued its Decision on the Hydro One Networks Inc. application to adopt the USGAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, for its Distribution business, commencing January 1, 2012.
|
Jan 31, 2012 |
West Coast |
EB-2011-0335 |
The Board has issued its Decision with Reasons on an application by West Coast Huron Energy Inc. for an order approving the recovery of costs caused by tornado damage.
|
Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 20, 2012 |
Enbridge Gas Distribution Inc. |
EB-2012-0428 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2013.
For more information about current natural gas rates, click here... |
Dec 19, 2012 |
Natural Resource Gas Limited |
EB-2012-0454 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2013.
For more information about current natural gas rates, click here... |
Dec 17, 2012 |
Union Gas Limited |
EB-2012-0437 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2013.
For more information about current natural gas rates, click here... |
Nov 26, 2012 |
Enbridge Gas Distribution Inc. |
EB-2011-0354 |
The Board has issued a Decision on Supplementary Settlement Agreement Open Bill Access Program on an application by Enbridge Gas Distribution Inc. for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas commencing January 1, 2013.
Decision on Supplementary Settlement Agreement Open Bill Access Program
Interim Rate Order (issued Nov 29, 2012) |
Oct 25, 2012 |
Union Gas Limited |
EB-2011-0210 |
The Board has issued its Decision and Order approving just and reasonable rates and other charges for Union Gas Limited for the sale, distribution, transmission and storage of natural gas commencing January 1, 2013.
|
Oct 18, 2012 |
Union Gas Limited |
EB-2012-0360 |
The Board has issued a Decision and Order on Motion to Review and Vary a previous Board Decision (EB-2012-0206) related to the issue of calculating the amount of margin sharing in the Short-Term Storage Account.
|
Sep 24, 2012 |
Enbridge Gas Distribution Inc. |
EB-2012-0352 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective October 1, 2012.
For more information about current natural gas rates, click here... |
Sep 20, 2012 |
Natural Resource Gas Limited |
EB-2012-0364 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective October 1, 2012.
For more information about current natural gas rates, click here... |
Sep 19, 2012 |
Union Gas Limited |
EB-2012-0345 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective October 1, 2012.
For more information about current natural gas rates, click here... |
Jul 18, 2012 | Union Gas Limited | EB-2012-0206 |
The Board has issued its Decision and Order on a Board Motion to determine the accuracy of the calculation of margin sharing related to Deferral Account 179-70 – Short-Term Storage and Other Balancing Services which was originally approved by the Board in the Union Gas Proceeding - EB-2011-0038.
|
Jun 21, 2012 |
Natural Resource Gas Limited |
EB-2012-0262 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective July 1, 2012.
For more information about current natural gas rates, click here... |
Jun 21, 2012 |
Enbridge Gas Distribution Inc. |
EB-2012-0238 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective July 1, 2012.
For more information about current natural gas rates, click here... |
Jun 19, 2012 |
Union Gas Limited |
EB-2012-0249 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective July 1, 2012.
For more information about current natural gas rates, click here... |
May 17, 2012 |
Natural Resource Gas Limited |
EB-2010-0018 |
The Board has issued its Decision and Order - Phase 2 on an application by Natural Resource Gas Limited for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas and other discrete issues.
|
May 10, 2012 |
Enbridge Gas Distribution Inc. |
EB-2011-0277 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective January 1, 2012 under the guidance of the multi-year Incentive Regulation plan methodology.
|
Mar 22, 2012 |
Enbridge Gas Distribution Inc. |
EB-2012-0054 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc. will charge its customers for natural gas effective April 1, 2012.
|
Mar 21, 2012 |
Natural Resource Gas Limited |
EB-2012-0069 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective April 1, 2012.
|
Mar 19, 2012 |
Union Gas Limited |
EB-2012-0070 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective April 1, 2012.
|
Mar 1, 2012 |
Union Gas Limited |
EB-2011-0210 |
The Board has issued its Decision on the Preliminary Issue and Procedural Order No. 2 for Union’s 2013 Cost of Service Proceeding.
|
Feb 23, 2012 |
Union Gas Limited |
EB-2011-0025 |
The Board has issued a Partial Decision and Order on Union Gas Limited’s 2012 IRM application.
Partial Decision and Order (issued Feb 23, 2012, corrected Mar 1, 2012)
Partial Decision and Rate Order (issued Dec 2, 2011) |
Jan 20, 2012 |
Union Gas Limited |
EB-2011-0038 |
The Board has issued a Decision and Order on Union Gas Limited’s 2010 Earning Sharing Mechanism and 2010 Deferral Account Disposition proceeding. The Decision also includes approvals for a cost allocation methodology to be used to allocate costs between Union’s utility and non-utility storage businesses.
|
2011
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 21, 2011 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2012. |
EB-2011-0405 |
The Board has issued a decision and order setting the Charge for Rural or Remote Electricity Rate Protection for 2012.
|
Dec 20, 2011 |
Hydro One Networks Inc. |
EB-2011-0268 |
The Board has issued its Rate Order for 2012 Ontario Uniform Transmission Rates.
|
Dec 9, 2011 |
PowerStream Inc. |
EB-2011-0128 |
The Board has issued a Decision and Order on an application by PowerStream Inc. for an order or orders approving or fixing a just and reasonable distribution rates related to Smart Meter deployment, to be effective November 1, 2011.
Decision and Order (corrected Dec 9-11)
|
Dec 8, 2011 |
Consumers Council of Canada |
EB-2010-0184 |
The Board has issued a Decision and Order dismissing a motion from the Consumers Council of Canada seeking a finding that the Special Purpose Charge is unconstitutional.
|
Nov 23, 2011 | Hydro One Networks Inc. | EB-2011-0268 |
The Board has issued its Decision on the application by Hydro One Networks Inc. to adopt the US GAAP accounting standard for rate application filings, regulatory accounting and regulatory reporting, for its transmission business commencing January 1, 2012.
|
Nov 2, 2011 | TransCanada Power Transmission (Ontario) L.P. | EB-2011-0260 |
The Board issued a Decision and Order amending TransCanada Power Transmission (Ontario) L.P.’s electricity transmission licence by changing the effective date of the licence to the earlier of:
|
Aug 3, 2011 |
Toronto Hydro Energy Services Inc. |
EB-2009-0180 |
The Board has issued a Decision and Order relating to the transfer of certain streetlighting assets in the City of Toronto (found to be distribution assets by the Board in its Decision and Order dated February 11, 2010) from Toronto Hydro Energy Services Inc. to Toronto Hydro-Electric System Limited.
|
Jun 24, 2011 |
Ontario Energy Board |
EB-2008-0381 |
The Board has issued its Decision and Order on the combined proceeding to determine the accuracy of the final account balances with respect to Account 1562 Deferred Payments in Lieu of Taxes for EnWin Utilities Ltd., Halton Hills Hydro Inc., and Barrie Hydro Distribution Inc. (PowerStream Inc.).
|
May 24, 2011 |
Chatham-Kent Transmission Inc. |
EB-2010-0351 |
The Board issued a Decision and Order in an application by Chatham-Kent Transmission Inc. for an electricity transmission licence.
|
May 20, 2011 |
ACH Limited Partnership |
EB-2011-0065 |
The Board issued its Decision and Order in an application by ACH Limited Partnership to amend its electricity generator licence.
|
May 6, 2011 |
Ontario Waterpower Association |
EB-2011-0067 |
On May 5, 2011, the Board made an oral Decision and Order on an application filed by the Ontario Waterpower Association under section 74(1)(b) of the Ontario Energy Board Act, 1998, to amend the distribution licence of Hydro One Networks Inc. to exempt Hydro One from sections 6.2.4.1(e)(i) and 6.2.18(a) of the Distribution System Code for waterpower generation facilities and to substitute a special rule for waterpower generation facilities.
The full Decision with Reasons is available in the transcript of the proceeding (volume 2) beginning at page 55:
|
Apr 25, 2011 |
Independent Electricity System Operator |
EB-2010-0046 |
The Board has rendered an oral Decision on an application by the Independent Electricity System Operator (the “IESO”) for the approval of its proposed expenditure and revenue requirements and its proposed fees for the 2011 fiscal year.
The Board accepted the parties’ settlement proposal in which the parties had reached agreement on all issues except Issue 3.3 concerning the amount of the accumulated operating surplus that should be retained by the IESO as an operating reserve. The IESO had proposed retaining $13.1 million of the total accumulated surplus of $23.3 million. The Board denied that amount and instead decided that the IESO should retain $5 million as an operating reserve and return the remainder, estimated at $18.3 million, to the market participants in the next billing period (May 2011).
Hearing Transcript (see page 10 for Decision on Settlement Proposal and page 50 for Decision on Issue 3.3)
|
Mar 25, 2011 |
Toronto Hydro-Electric System Limited |
EB-2010-0354 |
The Board has issued a Decision and Order on Motion from Toronto Hydro-Electric System Limited in relation to the Board’s October 29, 2010 Decision (EB-2010-0193) on Toronto Hydro’s application for contact voltage cost recovery.
|
Mar 10, 2011 |
Ontario Power Generation |
EB-2010-0008 |
The Board has issued its Decision regarding Ontario Power Generation’s payment amounts for its regulated hydroelectric and nuclear generating facilities.
|
Mar 8, 2011 |
Horizon Utilities Corporation |
EB-2010-0292 |
The Board has issued a Decision and Order regarding an application by Horizon Utilities Corporation for an increased Smart Meter Funding Adder.
|
Feb 28, 2011 |
Directive - Minister of Energy |
EB-2011-0055 |
The Board has issued a Decision and Order regarding a Directive from the Minister of Energy requiring the Ontario Energy Board to amend Hydro One Networks Inc.'s transmission licence.
Decision and Order (corrected Mar 1, 2011)
|
Feb 22, 2011 |
Ontario Energy Board |
EB-2010-0295 |
The Board has issued its Decision and Order in the Late Payment Penalty Generic hearing.
|
Jan 17, 2011 |
Hydro One Networks Inc. |
EB-2010-0002 |
The Board has issued its Rate Order for 2011 Ontario Uniform Transmission Rates.
Rate Order (Revised Jan 18-11) |
Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 21, 2011 |
Natural Resource Gas Limited |
EB-2011-0392 |
The Board has approved changes to the prices Natural Resource Gas Limited will charge its customers for natural gas effective January 1, 2012.
|
Dec 21, 2011 |
Enbridge Gas Distribution Inc |
EB-2011-0390 |
The Board has approved changes to the prices Enbridge Gas Distribution Inc will charge its customers for natural gas effective January 1, 2012.
|
Dec 16, 2011 |
Union Gas Limited |
EB-2011-0382 |
The Board has approved changes to the prices Union Gas Limited will charge its customers for natural gas effective January 1, 2012.
|
Dec 2, 2011 |
Union Gas Limited |
EB-2011-0025 |
The Board has issued a Partial Decision and Rate Order on Union Gas Limited's 2012 IRM application.
|
Sep 22, 2011 | Enbridge Gas Distribution Inc | EB-2011-0296 |
The Board has approved changes to the natural gas rates Enbridge Gas Distribution Inc. will charge its customers effective October 1, 2011.
|
Sep 20, 2011 | Natural Resource Gas Limited | EB-2011-0301 |
The Board has approved changes to the natural gas rates Natural Resource Gas Limited will charge its customers effective October 1, 2011.
|
Sep 19, 2011 |
Union Gas Limited |
EB-2011-0297 |
The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective October 1, 2011.
|
Jul 25, 2011 |
Union Gas Limited |
EB-2011-0040 |
The Board has granted Union Gas Limited leave to construct approximately 100 kilometres of natural gas pipeline and ancillary facilities to the Red Lake District northwest of Kenora.
Decision with Respect to Preliminary Questions and Final Decision and Orders |
Jul 19, 2011 |
Union Gas Limited |
EB-2011-0013 |
The Board has issued its Decision with Reasons approving the Union Gas application for the designation, construction and operation of the Jacob Storage Pool in Southwestern Ontario.
|
Jun 22, 2011 |
Enbridge Gas Distribution Inc. |
EB-2011-0129 |
The Board has approved changes to the natural gas prices Enbridge Gas Distribution Inc. charges its customers effective July 1, 2011.
|
Jun 20, 2011 |
Union Gas Limited |
EB-2011-0135 |
The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective July 1, 2011.
|
Jun 14, 2011 |
Natural Resource Gas Limited |
EB-2011-0208 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective July 1, 2011.
|
Mar 22, 2011 |
Enbridge Gas Distribution Inc. |
EB-2011-0051 |
The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective April 1, 2011.
|
Mar 22, 2011 |
Natural Resource Gas Limited |
EB-2011-0059 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective April 1, 2011.
|
Mar 22, 2011 |
Enbridge Gas Distribution Inc. |
EB-2010-0302 |
The Board has issued its Decision and Order with respect to an application by Enbridge Gas Distribution Inc. for construction of several pipelines as part of Enbridge’s storage enhancement project in St. Clair Township.
|
Mar 22, 2011 |
King Township |
EB-2011-0024 |
The Board has issued its Decision on a Motion by King Township for a review of the Board’s Decision and Order approving the construction of the Enbridge Gas Distribution Inc. pipeline to serve the York Energy Centre.
|
Mar 17, 2011 |
Union Gas Limited |
EB-2011-0029 |
The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective April 1, 2011.
|
Feb 17, 2011 |
Natural Resource Gas Limited |
EB-2010-0018 |
The Board has issued its Decision approving just and reasonable rates and other charges for Natural Resource Gas for the sale, distribution, transmission and storage of natural gas for the 2011 fiscal year.
|
2010
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 23, 2010 |
Hydro One Networks Inc. |
EB-2010-0002 |
The Board has issued a Decision with Reasons on an application by Hydro One Networks Inc. for an order or orders approving a transmission revenue requirement and rates and other charges for the transmission of electricity for 2011 and 2012.
|
Dec 21, 2010 |
In the matter of a determination by the Ontario Energy Board on the Green Energy Plan Electricity Rate Protection Benefit and Charge for 2010 as required under Section 79(1) of the Ontario Energy Board Act, 1998 and Ontario Regulation 330/09. |
EB-2010-0191 |
The Board has issued a decision setting the Renewable Generation Connection Rate Protection compensation amount for 2011 pursuant to O. Reg. 330/09.
|
Dec 20, 2010 |
Hydro One Networks Inc. |
EB-2010-0229 |
The Board has issued a Decision and Order on a licence amendment application filed by Hydro One Networks Inc.
|
Dec 20, 2010 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2011. |
EB-2010-0397 |
The Board has issued a decision setting the rate for Rural or Remote Electricity Rate Protection for 2011.
|
Dec 17, 2010 |
Hydro One Networks Inc. |
EB-2010-0228 |
The Board has issued a Decision and Order for Hydro One Networks Inc. for new Joint Use charges related to generation projects and new and revised fees for a Connection Impact Assessment.
|
Dec 13, 2010 |
PowerStream Inc. |
EB-2010-0209 |
The Board has approved adjusted distribution rates for PowerStream Inc. to include smart meter related costs incurred to install 137,356 smart meters in 2008 and 2009. The new rates are effective January 1, 2011.
|
Dec 2, 2010 |
Ontario Power Authority |
EB-2010-0220 |
The Board has issued a Decision and Order and a Licence on a licence application filed by the Ontario Power Authority.
|
Nov 19, 2010 |
PowerStream Inc. |
EB-2010-0209 |
The Board has issued a Decision and Order in the matter of PowerStream Inc.’s Smart Meter Cost Recovery Application for meters installed in 2008 and 2009.
Decision and Order (corrected version posted Nov 22-10) |
Nov 18, 2010 |
Summitt Energy Management Inc. |
EB-2010-0221 |
The Board has issued an administrative penalty and costs totaling up to $299,000 against Summitt Energy Management related to sales agent activities that contravened the Ontario Energy Board Act,1998.
|
Nov 11, 2010 |
Toronto Hydro-Electric System Limited |
EB-2010-0193 |
The Board has announced electricity distribution rates for Toronto Hydro-Electric System Limited. The new rates are effective November 1, 2010.
|
Nov 1, 2010 |
Five Nations Energy Inc. |
EB-2009-0387 |
The Board has issued its Decision and Order on an application by Five Nations Energy Inc. for 2010 transmission rates
|
Oct 29, 2010 |
Toronto Hydro-Electric System Limited |
EB-2010-0193 |
The Board has issued a Decision on an application by Toronto Hydro-Electric System Limited for recovery of approved costs incurred for the emergency correction of contact voltage conditions on its system.
|
Aug 5, 2010 |
Consumers Council of Canada Canadian Manufacturers and Exporters |
EB-2010-0184 |
The Board has issued a Decision with Reasons dismissing a motion by the Canadian Manufacturers and Exporters to stay assessments of the Special Purpose Charge pending a hearing on the constitutionality of the assessments. The motion had been dismissed in a decision with reasons to follow issued on July 26.
Decision (July 26, 2010) |
Mar 24, 2010 |
Horizon Utilities Corporation |
EB-2009-0332 |
The Board has issued a Decision in the matter of Horizon Utilities Corporation’s application for an order approving the recovery of certain amounts related to an unforeseen loss of revenue to be effective May 1, 2010.
|
Mar 23, 2010 |
York Energy Centre LP |
EB-2009-0242 |
The Board has issued a Decision and Order in the matter of York Energy Centre LP’s application for an electricity generation licence.
|
Mar 17, 2010 |
Ontario Energy Board |
EB-2009-0326 |
The Board has approved a province-wide fixed monthly charge for all electricity distributors related to the microFIT Generator rate class at $5.25 per month, effective September 21, 2009.
|
Feb 23, 2010 |
Ontario Energy Board |
EB-2009-0326 |
The Board has issued a Decision and Order with respect to a just and reasonable rate to be charged by an electricity distributor for the recovery of costs associated with a microFIT generator, i.e. an electricity generation facility contracted under the Ontario Power Authority’s microFIT program and connected to the distributor’s system.
|
Feb 22, 2010 |
Toronto Hydro-Electric System Limited |
EB-2009-0308 |
The Board has issued a Compliance Order against Toronto Hydro-Electric System Limited, which will ensure new condominiums have access to choice for smart meter suppliers.
|
Feb 11, 2010 |
Toronto Hydro-Electric System Limited Toronto Hydro Energy Services Inc. 1798594 Ontario Inc. |
EB-2009-0180
EB-2009-0181
EB-2009-0182
EB-2009-0183 |
An application by 1798594 Ontario Inc. seeking an electricity distribution icence;
An application by Toronto Hydro Energy Services Inc. seeking an order granting leave to sell streetlighting assets as an entirety or substantially as an entirety to 1798594 Ontario Inc.;
An application Toronto Hydro Energy Services Inc. seeking an order granting leave to sell streetlighting assets necessary in serving he public to 1798594 Ontario Inc.;
An application by Toronto Hydro-Electric System Limited and 1798594 ntario Inc. seeking leave to amalgamate;
A request by 1798594 Ontario Inc. seeking the cancellation of the distribution licence applied for in a separate application;
An application by 1798594 Ontario Inc. and Toronto Hydro-Electric System Limited for an order assigning Toronto Hydro-Electric System Limited’s electricity distribution licence to a proposed amalgamated entity consisting of 1798594 Ontario Inc. and Toronto Hydro-Electric System Limited.
|
Jan 29, 2010 |
Enersource Hydro Mississauga Inc. |
EB-2009-0405 |
The Board has issued a Decision and Rate Order approving an application by Enersource Hydro Mississauga Inc. to dispose of several deferral and variance account balances.
|
Jan 27, 2010 |
Toronto Hydro-Electric System Limited |
EB-2009-0308 |
The Board has issued a Decision and Order finding that Toronto Hydro-Electric System Limited has failed to connect smart meters to two condominiums in the City of Toronto contrary to section 28 of the Electricity Act, 1998 and various sections of the Distribution System Code.
The Board found that Toronto Hydro’s refusal to provide a bulk meter connection, and its requirement that each resident of a condominium become a direct customer of Toronto Hydro, did not comply with the Electricity Act.
|
Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 21, 2010 |
Enbridge Gas Distribution Inc. |
EB-2010-0347 |
The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective January 1, 2011.
|
Dec 21, 2010 |
Natural Resource Gas Limited |
EB-2010-0366 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective January 1, 2011.
|
Dec 17, 2010 |
Union Gas Limited |
EB-2010-0359 |
The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective January 1, 2011.
|
Dec 6, 2010 |
Natural Resource Gas Limited |
EB-2010-0018 |
The Board has issued its Decision and Order on Natural Resource Gas Limited's 2011 rates.
|
Sep 23, 2010 |
Enbridge Gas Distribution Inc. |
EB-2010-0258 |
The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective October 1, 2010.
|
Sep 17, 2010 |
Union Gas Limited |
EB-2010-0265 |
The Board has approved changes to the natural gas rates Union Gas Limited will charge its customers effective October 1, 2010.
|
Sep 17, 2010 |
Natural Resource Gas Limited |
EB-2010-0268 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective October 1, 2010.
|
Aug 26, 2010 |
Enbridge Gas Distribution Inc. |
EB-2010-0231 |
The Board has issued a Decision and Order regarding an application by Enbridge Gas Distribution Inc. for an order or orders approving a system reliability Settlement Agreement.
|
Jun 28, 2010 |
Enbridge Gas Distribution Inc. |
EB-2010-0186 |
The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective July 1, 2010.
|
Jun 18, 2010 |
Union Gas Limited |
EB-2010-0201 |
The Board has approved changes to the natural gas commodity price Union Gas Limited will charge its customers effective July 1, 2010.
|
Jun 18, 2010 |
Natural Resource Gas Limited |
EB-2010-0187 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective July 1, 2010.
|
May 18, 2010 |
Enbridge Gas Distribution Inc. |
EB-2009-0172 |
The Board issued its Decision relating to an application by Enbridge Gas to approve rates for distribution, transmission and storage of gas commencing January 1, 2010.
Decision - Return on Equity for Earnings Sharing and DSM Industrial Pilot Project |
May 18, 2010 |
Natural Resource Gas Limited |
EB-2010-0024 |
The Board granted NRG’s request for an exemption from filings its Service Quality data, as required under the Gas Distribution Access Rule (“GDAR”), for the year 2009 with the exception of that data required under Section 7.3.6.1 of the GDAR. The Board has denied NRG’s request for an exemption from Section 7.3.1 of the GDAR.
|
May 13, 2010 |
Union Gas Limited |
EB-2010-0154 |
The Board has approved Union’s request for an exemption from the requirements of Section 90 of the Act for an Order granting Leave to Construct natural gas pipeline and ancillary facilities in the City of Greater Sudbury.
|
Apr 1, 2010 |
Universal Energy Corporation |
EB-2009-0364 |
The Board has ordered that the renewal of the gas marketer licence of Universal Energy Corporation be subject to certain conditions, as a result of concerns raised regarding the conduct of the applicant.
|
Mar 23, 2010 |
Enbridge Gas Distribution Inc. |
EB-2010-0048 |
The Board has approved changes to the natural gas commodity prices Enbridge Gas Distribution Inc. charges its customers effective April 1, 2010.
|
Mar 17, 2010 |
Union Gas Limited |
EB-2010-0040 |
The Board has approved changes to the natural gas commodity price Union Gas Limited will charge its customers effective April 1, 2010.
|
Mar 16, 2010 |
Natural Resource Gas Limited |
EB-2010-0049 |
The Board has approved changes to the natural gas commodity prices Natural Resource Gas Limited charges its customers effective April 1, 2010.
|
Mar 10, 2010 |
Dawn Gateway Pipeline Limited Partnership |
EB-2009-0422 |
The Board has approved an application by the Dawn Gateway Pipeline Limited Partnership to construct a 17 kilometre natural gas pipeline and associated facilities in the Townships of St. Clair and Dawn-Euphemia.
|
Mar 2, 2010 |
Union Gas Limited |
EB-2008-0411 |
The Board has issued its Decision and Order in regards to an Application by Union Gas Limited pursuant to section 43(1) of the Act, for an Order or Orders granting leave to sell 11.7 kilometers of natural gas pipeline running between the St. Clair Valve Site and Bickford Compressor Site in the Township of St. Clair.
Decision and Order (May 11, 2010)
Decision and Order (Nov 27, 2009) |
Jan 19, 2010 |
Enbridge Gas Distribution Inc. |
EB-2009-0341 |
The Board has issued its Decision on Enbridge Gas Distribution Inc.’s application to dispose of its 2008 Demand Side Management Variance Accounts.
|
2009
Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 24, 2009 |
In the matter of a determination by the Ontario Energy Board on the Rural or Remote Electricity Rate Protection Benefit and Charge for 2010. |
EB-2009-0419 |
The Board has issued a decision setting the rate for Rural or Remote Electricity Rate Protection for 2010.
|
Dec 10, 2009 |
Toronto Hydro-Electric System Limited |
EB-2009-0243 |
The Board has issued a Decision on an application by Toronto Hydro-Electric System Limited for recovery of costs for the emergency correction of contact voltage conditions on its system.
Decision (corrected Dec 11, 2009) |
Oct 15, 2009 |
Toronto Hydro-Electric System Limited |
EB-2009-0308 |
On October 14, the Board issued a Decision and Order in response to a Motion filed by Toronto Hydro-Electric System Limited.
|
Sep 29, 2009 |
Ontario Energy Savings L.P. / Just Energy Ontario L.P. |
EB-2009-0257 |
The Board has issued a Decision and Order regarding an application filed by Ontario Energy Savings L.P. for a name change amendment to their gas marketer and electricity retailer licences.
|
Sep 8, 2009 |
North Bay Hydro Distribution Limited |
EB-2009-0113 |
The Board has denied a request from North Bay Hydro Distribution Limited to establish rate riders for the purpose of collecting revenues based on corrected retail settlement variance account "RSVA" balances.
|
Aug 25, 2009 |
Espanola Regional Hydro Distribution Corporation |
EB-2009-0056 |
The Board has issued a Rate Order approving changes to the 2009 electricity distribution rates for Espanola Regional Hydro Distribution Corporation.
|
Aug 25, 2009 |
In the matter of a motion by VECC requesting the Board to review and vary certain aspects of Decision and Order EB-2008-0233 dated April 6, 2009 and Decision and Order EB-2008-0226 dated April 17, 2009. |
EB-2009-0130 |
The Board has issued a Rate Order to reflect its Decision on VECC’s motions to review and vary its Decisions on 2009 electricity distribution rates for Innisfil Hydro and COLLUS Power.
Oral Decision (starting on pg. 73 of transcript) |
Aug 21, 2009 |
London Hydro Inc. |
EB-2008-0235 |
The Board has issued its Decision on an application by London Hydro Inc. for 2009 electricity distribution rates.
|
Aug 13, 2009 |
IN THE MATTER OF an order or orders authorizing certain distributors to conduct specific discretionary metering activities under section 53.18 of the Electricity Act, 1998, S.O. 1998, c. 15, Schedule A. |
EB-2009-0111 |
The Board has issued a Decision and Order in proceeding EB-2009-0111 commenced on its own motion to determine whether, and if so under what conditions, exempt distributors should be authorized to conduct discretionary metering activities. For purposes of this proceeding, the exempt distributor must distribute electricity on land where a residential complex or an industrial, commercial or office building is located. The discretionary metering activities relate to the installation of smart sub-metering systems.
|
Aug 13, 2009 |
Niagara-on-the-Lake Hydro Inc. |
EB-2009-0149 |
The Board has issued a Decision and Order approving revisions to Niagara-on-the-Lake Hydro Inc.’s Retail Transmission Service Rates.
|
Jul 31, 2009 |
Espanola Regional Hydro Distribution Corporation |
EB-2009-0056 |
The Board has issued a decision for Espanola’s application to reflect in rates an amount for Payment In Lieu of Taxes. The impact of this application will be an increase of $0.53 on the monthly bill of a typical residential customer effective September 1, 2009.
|
Jul 27, 2009 |
Powerstream Inc. |
EB-2008-0244 |
The Board has issued its Decision on an application by Powerstream Inc. for 2009 electricity distribution rates.
|
Jul 10, 2009 |
Tillsonburg Hydro Inc. |
EB-2008-0246 |
The Board has issued its Decision on an application by Tillsonburg Hydro Inc. for 2009 electricity distribution rates.
|
Jul 7, 2009 |
Welland Hydro-Electric System Corp. |
EB-2008-0247 |
The Board has issued its Decision on an application by Welland Hydro for 2009 electricity distribution rates. |
Jul 6, 2009 |
In the matter of a motion by VECC requesting the Board to review and vary certain aspects of Decision and Order EB-2008-0233 dated April 6, 2009 and Decision and Order EB-2008-0226 dated April 17, 2009. |
EB-2009-0130 |
The Board has issued an Oral Decision on VECC’s motions to review and vary its Decisions on 2009 electricity distribution rates for Innisfil Hydro and COLLUS Power.
Oral Decision (starting on pg. 73 of transcript) |
Jun 17, 2009 |
West Coast Huron Energy Inc. |
EB-2008-0248 |
The Board has issued its Decision on an application by West Coast Huron Energy Inc. for 2009 electricity distribution rates.
|
Jun 12, 2009 |
Kitchener-Wilmot Hydro Inc. |
EB-2009-0138 |
The Board has issued an oral Decision on an application pursuant to section 74 of the Ontario Energy Board Act, 1998 by Kitchener-Wilmot Hydro Inc. to amend electricity distribution licence.
|
Jun 3, 2009 |
Thunder Bay Hydro Electricity Distribution Inc. |
EB-2008-0245 |
The Board has issued its Decision on an application by Thunder Bay Hydro Electricity Distribution Inc. for 2009 electricity distribution rates.
|
Jun 1, 2009 |
Peterborough Distribution Inc. |
EB-2008-0241 |
The Board has issued its Decision on an application by Peterborough Distribution Inc. for 2009 electricity distribution rates.
|
May 28, 2009 |
Hydro One Networks Inc. |
EB-2008-0272 |
The Board has issued a Decision and Order regarding an application by Hydro One Networks Inc. for the 2009 and 2010 transmission revenue requirement and rates.
|
May 15, 2009 |
Hydro One Networks Inc. |
EB-2009-0136 |
The Board has issued a Decision and Order regarding an application by Hydro One Networks Inc. seeking an order granting leave to sell distribution system assets to Haldimand County Hydro Inc.
|
May 12, 2009 |
Midland Power Utility Corporation |
EB-2008-0236 |
The Board has issued its Decision on an application by Midland Power Utility Corporation for 2009 electricity distribution rates.
|
May 11, 2009 |
Ontario Power Generation Inc. |
EB-2009-0038 |
The Board has issued its Decision and Order concerning Ontario Power Generation Inc.'s Motion for a review and variance of the Board's Payments Decision (EB-2007, 200905) dated November 3, 2008.
|
May 8, 2009 |
Lakeland Power Distribution Ltd. |
EB-2008-0234 |
The Board has issued its Decision on an application by Lakeland Power Distribution Ltd. for 2009 electricity distribution rates.
|
May 5, 2009 |
Great Lakes Power Limited, Great Lakes Power Distribution Inc., Great Lakes Power Transmission Inc., Great Lakes Power Transmission LP |
EB-2009-0072 EB-2009-0073 EB-2009-0075 |
The Board has issued a Decision and Order regarding joint applications by Great Lakes Power Limited, Great Lakes Power Distribution Inc. and Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP, for various orders under sections 18, 60, 74, 77(5) and 86(1) of the Ontario Energy Board Act, 1998.
|
May 5, 2009 |
Direct Energy Marketing Limited |
EB-2009-0117 |
The Board has issued an Order pursuant to section 112.5 of the Ontario Energy Board Act,1998 that Direct Energy Marketing Limited pay an administrative penalty.
|
Apr 30, 2009 |
Hydro One Remote Communities Inc. |
EB-2008-0232 |
The Board has issued its Decision on an application by Hydro One Remote Communities Inc. for 2009 electricity distribution rates.
|
Apr 29, 2009 |
Centre Wellington Hydro Ltd. |
EB-2008-0225 |
The Board has issued its Decision on an application by Centre Wellington Hydro Ltd. for 2009 electricity distribution rates.
|
Apr 24, 2009 |
Universal Energy Corporation |
EB-2009-0118 |
The Board has issued an Order pursuant to section 112.5 of the Ontario Energy Board Act,1998 that Universal Energy Corporation pay an administrative penalty.
|
Apr 24, 2009 |
Westario Power Inc. |
EB-2008-0250 |
The Board has issued its Decision on an application by Westario Power Inc. for 2009 electricity distribution rates.
|
Apr 22, 2009 |
Northern Ontario Wires Inc. |
EB-2008-0238 |
The Board has issued its Decision on an application by Northern Ontario Wires Inc. for 2009 electricity distribution rates.
|
Apr 17, 2009 |
IN THE MATTER OF the Board’s Guidelines for Reviewing Electricity LDC Variance and Deferral Accounts pursuant to Section 78 of the Ontario Energy Board Act. |
EB-2009-0091 |
The Board has issued an Order pertaining to the review of balances in the RSVApower account and the RSVApower sub-account Global Adjustment (Account 1588) for all the LDCs listed in Appendix A for the period ending December 31, 2008. The Board finds that there is no requirement for disposition at this time. This Order does not limit the decision making authority of the Board in the review and potential disposition of any specific LDCs Account 1588 that may currently be under review by the Board or where disposition of the balance of Account 1588 has been ordered.
|
Apr 17, 2009 |
COLLUS Power Corp. |
EB-2008-0226 |
The Board has issued its Decision on an application by COLLUS Power Corp. for 2009 electricity distribution rates.
|
Apr 9, 2009 |
EnWin Utilities Ltd. |
EB-2008-0227 |
The Board has issued its Decision on an application by EnWin Utilities Ltd. for 2009 electricity distribution rates.
|
Apr 7, 2009 |
Ontario Power Authority |
EB-2008-0312 |
The Board has issued its Decision and Order on an application by the Ontario Power Authority for review and approval of its proposed expenditures and revenue requirement and its proposed fees for the year 2009.
|
Apr 6, 2009 |
Innisfil Hydro Distribution Systems Limited |
EB-2008-0233 |
The Board has issued its Decision on an application by Innisfil Hydro Distribution Systems Limited (EB-2008-0233) for 2009 electricity distribution rates.
|
Mar 31, 2009 |
Independent Electricity System Operator |
EB-2008-0340 |
The Board has issued its Decision and Order on an application by the Independent Electricity System Operator for review and approval of its proposed revenue requirement, capital expenditures and fees for fiscal 2009.
|
Mar 25, 2009 |
Niagara-on-the-Lake Hydro Inc. |
EB-2008-0237 |
Today the Ontario Energy Board issued its Decision on an application by Niagara-on-the-Lake Hydro Inc. (EB-2008-0237) for 2009 electricity distribution rates.
|
Feb 11, 2009 |
Town of Cochrane Northern Ontario Wires Inc. |
EB-2008-0339 |
Today, the Ontario Energy Board issued a Decision and Order approving an application by the Town of Cochrane to acquire all outstanding shares of Northern Ontario Wires Inc.
|
Feb 9, 2009 |
Middlesex Power Distribution Corporation Dutton Hydro Limited Newbury Power Inc. |
EB-2008-0332 EB-2008-0350 |
Today, the Board issued its Decision and Order regarding an application by Middlesex Power Distribution Corporation to acquire Dutton Hydro Limited and Newbury Power Inc. under section 86(2)(a) of the Ontario Energy Board Act, 1998.
|
Jan 21, 2009 |
Summitt Energy Management Inc. |
EB-2009-0006 |
Today the Ontario Energy Board issued an order pursuant to section 112.5 of the Ontario Energy Board Act,1998 (the “Act”) that Summitt Energy Management pay an administrative penalty in the amount of $70,000.00.
Order (revised Jan 30, 2009) |
Jan 21, 2009 |
Universal Energy Corporation |
EB-2009-0005 |
Yesterday the Ontario Energy Board issued an order pursuant to section 112.5 of the Ontario Energy Board Act,1998 (the “Act”) that Universal Energy Corporation pay an administrative penalty in the amount of $127,500.00.
|
Jan 20, 2009 |
Town of Essex E.L.K. Energy Inc. |
EB-2008-0310 |
Yesterday, the Ontario Energy Board issued an oral Decision approving an application by the Town of Essex to acquire all of the remaining shares in E.L.K. Energy Inc. effective January 31, 2009.
|
Jan 8, 2009 |
Erie Thames Powerlines Corporation |
EB-2008-0375 |
Today the Ontario Energy Board issued a Decision and Order amending the distribution licence of Erie Thames Powerlines Inc. to reflect an interim exemption from section 6.5.4 of the Board’s Distribution System Code.
|
2009 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 22, 2009 |
Enbridge Gas Distribution Inc. |
EB-2009-0172 |
The Board has issued its Decision on a Preliminary Motion in the Enbridge Gas Distribution Inc. 2010 rates proceeding in which Enbridge sought to include its Green Energy Initiatives project costs in the regulated rates of the utility. The Board’s Decision has denied the costs to be included in the rates.
|
Dec 22, 2009 |
Natural Resource Gas Limited |
EB-2009-0407 |
The Board has approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective January 1, 2010.
|
Dec 21, 2009 |
Enbridge Gas Distribution Inc. |
EB-2009-0398 |
The Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2010.
|
Dec 18, 2009 |
Union Gas Limited |
EB-2009-0410 |
The Board has approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective January 1, 2010.
|
Nov 9, 2009 | Union Gas Limited | EB-2009- 0275 |
The Board has approved an application by Union Gas Limited for an annual incremental rate adjustment. The change is part of its multi-year incentive rate mechanism for regulated natural gas distribution, transmission and storage services.
|
Sep 22, 2009 |
Enbridge Gas Distribution Inc. |
EB-2009-0309 |
The Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2009.
|
Sep 18, 2009 |
Methodologies for commodity pricing, load balancing and cost allocation |
EB-2008-0106 |
The Board has issued its Decision and Order in a proceeding initiated by the Board on its own motion to determine methodologies for commodity pricing, load balancing and cost allocation for natural gas distributors.
Decision and Order (amended Sep 21-09) |
Sep 16, 2009 |
Natural Resource Gas Limited |
EB-2009-0321 |
The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective October 1, 2009.
|
Sep 14, 2009 |
Union Gas Limited |
EB-2009-0313 |
The Board has approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective October 1, 2009.
|
Aug 10, 2009 |
Natural Resource Gas Limited |
EB-2009-0020 |
The Board has issued a Decision on an application by Natural Resource Gas Limited for an order or orders to dispose of balances in the non-commodity related deferral accounts as of September 30, 2008.
|
Jul 14, 2009 | Enbridge Gas Distribution Inc. | EB-2008-0219 |
The Board has issued its Decision and Order on the Phase 2 portion of the application by Enbridge Gas Distribution Inc. in the matter of its 2009 rates.
|
Jun 23, 2009 |
Enbridge Gas Distribution Inc. |
EB-2009-0145 |
The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective July 1, 2009.
|
Jun 19, 2009 |
Natural Resource Gas Limited |
EB-2009-0131 |
The Board has approved a Quarterly Rate Adjustment Mechanism (QRAM) application for changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective July 1, 2009. |
Jun 18, 2009 |
Union Gas Limited |
EB-2009-0147 EB-2009-0101 |
The Board has approved changes to the rates Union Gas Limited charges its customers effective July 1, 2009.
Decision and Order (EB-2009-0147)
Decision and Rate Order (EB-2009-0101) |
Mar 19, 2009 |
Natural Resource Gas Limited |
EB-2009-0062 |
Today the Ontario Energy Board approved Changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited (NRG) effective April 1, 2009.
|
Mar 13, 2009 |
Enbridge Gas Distribution Inc. |
EB-2009-0018 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2009.
|
Mar 13, 2009 |
Union Gas Limited |
EB-2009-0054 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective April 1, 2009.
|
Feb 24, 2009 |
Union Gas Limited |
EB-2008-0220 |
Today the Ontario Energy Board approved changes to the rates Union Gas Limited (Union) charges its customers effective January 1, 2009 arising from Union’s 2009 Rates Application.
|
Feb 23, 2009 |
Enbridge Gas Distribution Inc. |
EB-2008-0219 |
Today the Ontario Energy Board approved changes to the rates Enbridge Gas Distribution Inc. charges its customers effective January 1, 2009 arising from Enbridge’s 2009 Rates Application.
|
Jan 29, 2009 |
Union Gas Limited |
EB-2008-0220 |
Today the Ontario Energy Board issued a Decision with Reasons on an application by Union Gas Limited for 2009 Rates, effective January 1, 2009. The Board directed Union to file a draft rate order reflecting its decision by February 5, 2009.
|
2008
2008 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 31, 2008 |
Town of Essex |
EB-2008-0310 |
Today, the Board issued a majority decision on a threshold issue in the Town of Essex’s application to acquire the remaining shares in E.L.K. Energy Inc. The decision includes a minority dissent and a procedural order outlining the next steps in the proceeding.
|
Dec 23, 2008 |
PowerStream Inc.
Barrie Hydro Distribution Inc. |
EB-2008-0335 |
The Ontario Energy Board made an oral decision on December 15, 2008 which granted leave to PowerStream and Barrie Hydro to amalgamate.
|
Dec 18, 2008 |
Hydro One Networks Inc. |
EB-2007-0681 |
Today the Ontario Energy Board issued its Decision on an application by Hydro One Networks Inc. for 2008 electricity distribution rates. New rates are effective May 1, 2008 and are to be implemented February 1, 2009.
|
Dec 15, 2008 |
Ontario Power Generation |
EB-2008-0298 |
On December 15, 2008, the Ontario Energy Board issued an oral decision which approved a Reliability Must Run agreement for Lennox Generating Station for the period October 1, 2008 to September 30, 2009.
|
Dec 2, 2008 |
Ontario Power Generation |
EB-2007-0905 |
The Ontario Energy Board today approved Ontario Power Generation’s payment levels for the electricity output of its regulated nuclear and hydroelectric generating assets.
|
Nov 26, 2008 |
Chatham-Kent Hydro Inc.
Middlesex Power Distribution Corp. |
EB-2008-0155 |
Today the Ontario Energy Board issued its Decision and Order on a joint application by Chatham-Kent Hydro Inc. and Middlesex Power Distribution Corp. for adjusted distribution rates to recover the costs of smart meters installed from May 1 to December 31, 2007. New rates will take effect November 1, 2008, but there is no immediate rate impact for ratepayers served by these distributors.
|
Nov 3, 2008 |
Ontario Power Generation Inc. |
EB-2007-0905 |
The Ontario Energy Board has released its decison regarding Ontario Power Generation’s payment levels for the output of its regulated nuclear and hydroelectric generating assets.
|
Oct 30, 2008 |
Great Lakes Power Limited |
EB-2007-0744 |
Today the Ontario Energy Board issued a Decision on an application by Great Lakes Power Limited for 2007 electricity distribution rates.
|
Oct 27, 2008 |
Erie Thames Powerlines Corporation |
EB-2007-0928 |
Today the Ontario Energy Board issued its Decision on an application by Erie Thames Powerlines Corporation for 2008 electricity distribution rates. New rates will take effect when the final Rate Order is issued.
|
Oct 3, 2008 |
Horizon Utilities Corporation |
EB-2007-0697 |
Today the Ontario Energy Board issued its Decision on an application by Horizon Utilities Corporation for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.
|
Sep 15, 2008 |
Hydro One Networks Inc. |
EB-2007-0050 |
Today, the Ontario Energy Board approved Hydro One’s application for leave to construct approximately 180 kilometres of a double-circuit 500 Kilovolt electricity transmission line extending from the Bruce Power Facility in Kincardine Township to Hydro One’s Milton Switching Station in the town of Milton, with conditions.
|
Sep 11, 2008 |
Sioux Lookout Hydro Inc. |
EB-2007-0785 |
Today the Ontario Energy Board issued its Decision on an application by Sioux Lookout Hydro Inc. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued. |
Aug 28, 2008 |
Hydro One Networks Inc. |
EB-2008-0113 |
Today the Ontario Energy Board issued the Ontario Uniform Transmission Rates Decision and Rate Order approving the rate schedule for the recovery of the revenue requirements of electricity transmitters in the Ontario Transmission Rates Pool (Hydro One Networks Inc, Great Lakes Power Ltd., Canadian Niagara Power Inc. and Five Nations Energy Inc.).
|
Aug 21, 2008 |
Atikokan Hydro Inc. |
EB-2008-0014 |
Today the Ontario Energy Board issued its Decision on an application by Atikokan Hydro Inc. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.
|
Aug 15, 2008 |
Cambridge and North Dumfries Hydro Inc. |
EB-2007-0900 |
Today the Ontario Energy Board issued its Decision on an application by Wellington North Power Inc. for Low Voltage rates to be charged to Waterloo North Hydro Inc. and Hydro One Networks Inc.
|
Aug 14, 2008 |
Hydro One Networks Inc. |
EB-2008-0023 |
Today the Ontario Energy Board issued an Order granting leave to Hydro One Networks Inc. to construct electricity transmission facilities in Norfolk County.
|
Aug 11, 2008 |
Wellington North Power Inc. |
EB-2007-0693 |
Today the Ontario Energy Board issued its Decision on an application by Wellington North Power Inc. for 2008 electricity distribution rates. New rates will take effect when the final Rate Order is issued.
|
Jul 31, 2008 |
Guelph Hydro Electric Systems Ltd. |
EB-2007-0742 |
Today the Ontario Energy Board issued its Decision on an application by Guelph Hydro Electric Systems Ltd. for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.
|
Jul 25, 2008 |
Hydro One Networks Inc.
Whitby Hydro Electric Corporation
Peterborough Distribution Inc. |
EB-2007-0917 EB-2007-0947 |
Today the Ontario Energy Board issued a Decision and Order amending the service areas in the distribution licences of Hydro One Networks Inc., Whitby Hydro Electric Corporation and Peterborough Distribution Inc.
|
Jul 18, 2008 |
Brantford Power Inc |
EB-2007-0698 |
Today the Ontario Energy Board issued its Decision on an application by Brantford Power Inc for 2008 electricity distribution rates.
|
Jul 15, 2008 |
Peterborough Distribution Incorporated |
EB-2007-0886 |
Today the Ontario Energy Board issued its Decision on an application by Peterborough Distribution Inc. – Peterborough Service Area for 2008 electricity distribution rates.
|
Jul 14, 2008 |
Orangeville Hydro Limited
Grand Valley Energy Inc. |
EB-2008-0053 |
Today the Ontario Energy Board issued a Decision and Order granting Orangeville Hydro Limited (Orangeville) and Grand Valley Energy Inc. (Grand Valley) leave to amalgamate as well as to cancel Grand Valley’s distribution licence and to amend Orangeville’s distribution licence to include the area currently served by Grand Valley in its distribution licence.
|
Jun 24, 2008 |
Independent Electricity System Operator (IESO)
Ontario Power Generation Inc. (OPGI) |
EB-2008-0114 |
Today the Ontario Energy Board amended the licences of both Ontario Power Generation Inc. (OPGI) and the Independent Electricity System Operator (IESO) pursuant to a Ministerial directive issued to the Board on May 21, 2008.
|
Jun 3, 2008 |
Espanola Regional Hydro Distribution Corporation |
EB-2007-0901 |
Today the Ontario Energy Board issued its Decision on an application by Espanola Regional Hydro Distribution Corporation (Espanola) for 2008 electricity distribution rates. New rates will take effect July 1, 2008.
|
Jun 2, 2008 |
Chapleau Public Utilities Corporation |
EB-2007-0755 |
Today the Ontario Energy Board issued its Decision on an application by Chapleau Public Utilities Corporation (Chapleau PUC) for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.
|
May 26, 2008 |
Norfolk Power Distribution Inc. |
EB-2007-0753 |
Today the Ontario Energy Board issued its Decision on an application by Norfolk Power Distribution Inc. (Norfolk) for 2008 electricity distribution rates. New rates will take effect the date the final Rate Order is issued.
|
May 22, 2008 |
PUC Distribution Inc. |
EB-2007-0931 |
Today the Ontario Energy Board issued its Decision on an application by PUC Distribution Inc. (PUC) for 2008 electricity distribution rates. New rates will take effect July 1, 2008.
|
May 21, 2008 |
Association of Major Power Consumers in Ontario (AMPCO) |
EB-2008-0099 |
On Friday, May 16, 2008 the Ontario Energy Board (the Board) issued a Decision on a Motion from the Association of Major Power Consumers in Ontario (AMPCO) in relation to the Board's March 19, 2008 Decision on Oshawa PUC Networks Inc.’s 2008 electricity distribution rates (EB-2007-0710).
|
May 15, 2008 |
Toronto Hydro-Electric System Limited |
EB-2007-0680 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Toronto Hydro-Electric System Limited (Toronto Hydro) for electricity distribution rates 2008, 2009 and 2010.
|
May 15, 2008 |
Ontario Power Authority |
EB-2007-0791 |
Today the Ontario Energy Board (the Board) issued a Decision and Order on an application by the Ontario Power Authority (OPA) to review its proposed expenditure and revenue requirements and the fees it proposes to charge for the year 2008.
|
May 9, 2008 | Lakefront Utilities Inc. | EB-2007-0761 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Lakefront Utilities Inc. (Lakefront) for 2008 electricity distribution rates. New rates will take effect May 1, 2008.
|
May 6, 2008 |
Rideau St. Lawrence Distribution Inc. (Rideau SL) |
EB-2007-0762 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Rideau St. Lawrence Distribution Inc. (Rideau SL) for 2008 electricity distribution rates. New rates will take effect on the date of the Final Rate Order.
|
Apr 22, 2008 |
Independent Electricity System Operator (IESO) |
EB-2007-0816 |
Today the Ontario Energy Board (the Board) issued a final Decision and Order on an application by the Independent Electricity System Operator (IESO) to approve its fees for the 2008 fiscal year.
|
Apr 4, 2008 |
Hydro One Networks Inc. |
EB-2007-0792 |
Today the Ontario Energy Board (the Board) issued a Decision and Order amending the distribution licences of Newmarket-Tay Power Distribution Ltd. (Newmarket-Tay) and Hydro One Networks Inc. (Hydro One). The Board also issued an Order granting Hydro One leave to sell distribution assets to Newmarket Tay.
|
Mar 27, 2008 |
Halton Hills Hydro Inc. |
EB-2007-0696 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Halton Hills Hydro Inc. (Halton Hills) for 2008 electricity distribution rates. New rates will take effect May 1, 2008.
|
Mar 26, 2008 |
Ontario Power Authority |
EB-2007-0707 |
The Ontario Energy Board has issued a Decision today approving an issues list for its review of the Ontario Power Authority’s (OPA) Integrated Power System Plan (IPSP) and procurement processes, concluding phase 1 of the proceeding. In phase 2, to be scheduled for mid-2008, the Board will use the issues list as the basis for its review of the OPA’s application.
|
Mar 25, 2008 |
Barrie Hydro Distribution Inc. |
EB-2007-0746 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Barrie Hydro Distribution Inc. (Barrie Hydro) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.
|
Mar 19, 2008 |
Oshawa PUC Networks Inc. |
EB-2007-0710 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Oshawa PUC Networks Inc. (Oshawa) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.
Varied Decision (issued May 8, 2008) |
Mar 17, 2008 |
Hydro Ottawa Limited |
EB-2007-0713 |
Today the Ontario Energy Board (the Board) issued its Decision on an application by Hydro Ottawa Limited (Hydro Ottawa) for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.
|
Mar 14, 2008 |
Hydro 2000 Inc. |
EB-2007-0704 |
The Ontario Energy Board (the Board) issued its Decision on an application by Hydro 2000 Inc. for 2008 electricity distribution rates. The rate changes will take effect May 1, 2008.
|
Feb 8, 2008 |
Ontario Power Generation Inc. |
EB-2007-0905 |
The Ontario Energy Board has released an Order, establishing Ontario Power Generation’s payment levels interim effective April 1, 2008 for its regulated nuclear and baseload hydro generating assets.
|
Jan 17, 2008 |
Hydro One Networks Inc. |
EB-2002-0424 RP-1999-0057 |
Today, the Ontario Energy Board issued a Decision and Order in relation to an application by Hydro One Networks Inc. pursuant to the Transmission System Code for approval of customer delivery point performance standards.
|
Jan 10, 2008 |
Milton Hydro Distribution Inc. |
EB-2007-0771 |
On Tuesday, January 8, 2008 the Ontario Energy Board (the Board) issued a Decision on a Motion from Milton Hydro Distribution Inc. (Milton) in relation to the Board's April 12, 2006 Decision on Milton’s 2006 electricity distribution rates.
|
Jan 8, 2008 |
PUC Distribution Inc. |
EB-2007-0723 |
Today the Ontario Energy Board (the Board) issued a Decision and Order approving changes to the 2007 electricity distribution rates for PUC Distribution Inc. (PUC).
|
Jan 4, 2008 |
EnWin Utilities Ltd. |
EB-2007-0522 |
Today the Ontario Energy Board (the Board) issued a Decision and Order approving 2007 electricity distribution rates for EnWin Utilities Ltd. (EnWin).
|
2008 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 29, 2008 |
Natural Resource Gas Limited |
EB-2008-0377 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Limited effective January 1, 2009.
|
Dec 18, 2008 |
Enbridge Gas Distribution Inc. |
EB-2008-0348 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2009.
|
Dec 15, 2008 |
Union Gas Limited |
EB-2008-0371 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective January 1, 2009.
|
Nov 27, 2008 |
Union Gas Limited |
EB-2008-0273 |
The Board issued its Decision and Order on the Union Gas application related to security provisions with NRG.
|
Nov 19, 2008 |
Westcoast Energy Inc.
Union Gas Limited |
EB-2008-0304 |
Today the Board issued its Decision and Order regarding an application by Westcoast Energy Inc. and Union Gas Limited for leave pursuant to section 43(2) of the Ontario Energy Board Act, 1998 for the transfer of a controlling interest in Union Gas Limited to a limited partnership.
|
Oct 23, 2008 |
Union Gas Limited |
EB-2008-0154 |
Today the Ontario Energy Board issued its Decision on a Motion filed by Union Gas Limited to review the Board’s 2007 Deferral Account Decision (EB-2008-0034) with respect to the Long-Term Peak Storage Services Deferral Account (Account 179-72).
|
Sep 26, 2008 |
Natural Resource Gas Limited |
EB-2008-0284 |
Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited charges its customers effective October 1, 2008.
|
Sep 25, 2008 |
Enbridge Gas Distribution Inc. |
EB-2008-0263 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2008.
|
Sep 18, 2008 |
Union Gas Limited |
EB-2008-0281 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited effective October 1, 2008.
|
Jul 31, 2008 |
Union Gas Limited
Enbridge Gas Distribution Inc. |
EB-2007-0606 EB-2007-0615 |
Today the Ontario Energy Board issued a Decision related to a combined proceeding involving a multi-year incentive rate mechanism to determine rates for the regulated distribution, transmission and storage of natural gas for Union Gas Limited and Enbridge Gas Distribution Inc., effective January 1, 2008.
|
Jul 28, 2008 |
Market Hub Partners Management Inc.
AltaGas Ltd. |
EB-2008-0002 |
Today the Ontario Energy Board issued a Decision with Reasons approving applications by Market Hub Partners Management Inc. and AltaGas Ltd. concerning the Sarnia Airport Pool project in the City of Sarnia, in the County of Lambton.
|
Jun 25, 2008 |
Natural Resource Gas Limited |
EB-2008-0090 |
Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective July 1, 2008.
|
Jun 19, 2008 |
Enbridge Gas Distribution Inc. |
EB-2008-0069 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective July 1, 2008. The new rates also reflect the Board’s May 15, 2008 Decision relating to the multi-year incentive rate mechanism plan for Enbridge’s regulated natural gas distribution, transmission and storage services, also effective July 1, 2008. The rates approved today supersede rates approved on May 15, 2008.
|
Jun 19, 2008 |
Union Gas Limited |
EB-2008-0109 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Union Gas Limited (Union) effective July 1, 2008.
|
Jun 16, 2008 |
Union Gas Limited |
EB-2008-0024 |
Today the Ontario Energy Board issued a Decision and Order granting Union Gas Limited leave to construct 4.5 kilometres of natural gas pipeline and ancillary facilities in the Town of Halton Hills and the Town of Milton, to supply natural gas to the Halton Hills Generating Station currently being constructed by TransCanada Energy Ltd.
|
May 21, 2008 |
Enbridge Gas Distribution Inc. |
EB-2007-0782 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting leave to Enbridge Gas Distribution Inc. (Enbridge) to construct a natural gas distribution line and related facilities to supply natural gas to the Georgian Bay area.
|
May 15, 2008 |
Enbridge Gas Distribution Inc. |
EB-2007-0615 |
Today the Board issued its Decision and Rate Order approving the rates charged by Enbridge Gas Distribution Inc. arising from Enbridge's Incentive Regulation Plan which was approved by the Board on February 11, 2008. The rates will be implemented July 1, 2008 and will be immediately superceded by the July 1, 2008 QRAM decision rates which will be announced in the second half of June.
|
Apr 29, 2008 |
Enbridge Gas Distribution Inc.
Union Gas Limited |
EB-2007-0724 EB-2007-0725 |
Today the Ontario Energy Board (the Board) issued its Decision with Reasons on natural gas storage allocation policies for certain large volume customers of Union Gas Limited (Union) and Enbridge Gas Distribution Inc. (Enbridge).
|
Mar 25, 2008 |
Natural Resource Gas Limited |
EB-2008-0031 |
Today the Ontario Energy Board approved an increase to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective April 1, 2008.
|
Mar 19, 2008 |
Enbridge Gas |
EB-2008-0048 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective April 1, 2008.
|
Mar 13, 2008 |
Union Gas Limited |
EB-2008-0033 |
Today the Ontario Energy Board (the Board) approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2008 arising from Union’s April 2008 QRAM application.
|
Mar 12, 2008 |
Natural Resource Gas Limited |
EB-2006-0243 |
Today the Ontario Energy Board issued a Decision relating to an earlier Decision that granted Natural Resource Gas Limited (NRG) leave to construct a 28.5 kilometer natural gas pipeline.
|
Mar 11, 2008 |
Enbridge Gas
Union Gas Limited |
EB-2007-0606 EB-2007-0615 |
Today the Board issued its Decision regarding the treatment of customer additions under the Incentive Regulation Plan for Union Gas Limited and Enbridge Gas Distribution Inc. The Board concluded that the companies' underlying and long term incentives to make customer additions are greater than the potential disincentive in the Incentive Regulation Plan and so no adjustment to the Incentive Regulation Plan was necessary.
|
Mar 4, 2008 |
Natural Resource Gas Limited |
EB-2006-0243 |
Today the Ontario Energy Board issued a Decision and Order amending an earlier Decision that granted Natural Resource Gas Limited (NRG) leave to construct a 28.5 kilometer natural gas pipeline.
|
Feb 11, 2008 |
Enbridge Gas Distribution Inc. |
EB-2007-0615 |
Today the Ontario Energy Board issued a Decision on a settlement agreement regarding an application by Enbridge Gas Distribution Inc. (Enbridge) for approval of a multi-year incentive rate mechanism for its regulated natural gas distribution, transmission and storage services.
|
Feb 4, 2008 |
Enbridge Gas Distribution Inc. |
EB-2007-0731 |
Today the Ontario Energy Board issued a Decision on an application by Enbridge Gas Distribution Inc. (Enbridge) for an order or orders approving the balance in the 2007 Class Action Suit Deferral Account (the Account) and disposition of that balance.
|
Jan 17, 2008 |
Union Gas Limited |
EB-2007-0606 |
Application by Union Gas Limited for an Order or Orders approving or fixing a multiyear incentive rate mechanism to determine rates for the regulated distribution, transmission and storage of natural gas, effective January 1, 2008.
|
2007
2007 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 28, 2007 |
Niagara Falls Hydro Inc.
Peninsula West Utilities Ltd. |
EB-2007-0749 |
Today the Ontario Energy Board issued a Decision and Order granting Niagara Falls Hydro Inc. (Niagara Falls) and Peninsula West Utilities Limited (Pen West) leave to amalgamate.
|
Dec 24, 2007 |
Great Lakes Power Limited Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP |
EB-2007-0647 EB-2007-0649 EB-2007-0650 EB-2007-0651 EB-2007-0652 |
The Ontario Energy Board today released its Decision and Order relating to applications by Great Lakes Power Limited and Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP under various sections of the .
GLPL applied:
Great Lakes Power Transmission Inc. on behalf of Great Lakes Power Transmission LP applied for an electricity transmission licence.
The Board has granted all the applications.
|
Dec 24, 2007 |
Welland Hydro-Electric System Corporation |
EB-2007-0663 |
Today the Ontario Energy Board issued a Decision and Order approving an amendment to the 2007 electricity distribution rates for Welland Hydro-Electric System Corporation.
|
Dec 21, 2007 |
Ontario Power Generation (OPG) |
EB-2007-0715 |
Today, the Ontario Energy Board (the Board) issued a Decision approving a third reliability must-run (RMR) contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator (IESO) for OPG's Lennox generating station. A first RMR contract for Lennox was approved by the Board on March 13, 2006 and a second was approved on January 22, 2007
|
Nov 26, 2007 |
Hydro One Networks Inc. |
EB-2007-0797 |
Today the Ontario Energy Board (the Board) issued a Decision and Order concerning a motion by Hydro One Networks Inc. (Hydro One) to review two elements of the Board’s September 7, 2007 Decision and Order regarding the connection procedures of Hydro One and Great Lakes Power Limited (the Connection Procedures Decision).
|
Oct 12, 2007 |
Canadian Renewable Energy Corporation |
EB-2007-0034 |
Today the Ontario Energy Board issued an Order granting an application by Canadian Renewable Energy Corporation for leave to construct transmission facilities connecting its Wolfe Island wind farm to the transmission grid.
|
Oct 11, 2007 |
Hydro One Networks Inc. |
EB-2007-0027 |
Today the Ontario Energy Board (the Board) issued an Order granting leave to Hydro One Networks Inc. (Hydro One) to construct electricity transmission facilities in the Woodstock area.
|
Oct 10, 2007 |
Terrace Bay Superior Wires Inc. |
EB-2007-0666 |
Today the Ontario Energy Board issued a Decision and Order related to applications by Terrace Bay Superior Wires Inc. (Terrace Bay) to amend its 2007 distribution rates and to sell its distribution system. The Decision and Order also relates to applications by Hydro One Networks Inc. (Hydro One) to amend its distribution licence and distribution rate order.
|
Oct 9, 2007 |
Hydro One Networks Inc. |
EB-2007-0013 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks Inc. (Hydro One) leave to construct electricity transmission facilities in the City of Brampton.
|
Sep 21, 2007 |
Toronto Hydro-Electric System Limited Hydro Ottawa Limited |
EB-2007-0747 |
The Ontario Energy Board issued a Decision and Order in the matter of motions by Toronto Hydro-Electric System (EB-2007, 200747) and Hydro Ottawa Limited (EB-2007, 200748) requesting the Board review and vary certain aspects of the Decision and Order in the smart metering proceeding EB-2007-0063.
|
Sep 21, 2007 |
Hydro One Networks Inc. |
EB-2007-0668 |
In the matter of an application by Hydro One Networks Inc. seeking an order granting Hydro One Networks Inc. leave to sell distribution system assets to Burlington Hydro Inc.
|
Aug 20, 2007 |
Hydro One Networks Inc.’s (Hydro One) |
EB-2007-0051 |
Today the Ontario Energy Board (the "Board") issued a Decision granting Hydro One Networks Inc. ("Hydro One") an interim order with conditions until April 1, 2009 allowing entry onto land to conduct certain survey, testing, appraisal and investigative activities for a proposed transmission line.
|
Aug 16, 2007 |
Hydro One Networks Inc.’s (Hydro One) |
EB-2006-0501 |
Today the Ontario Energy Board (OEB) issued a Decision with Reasons regarding Hydro One Networks Inc.’s (Hydro One) application for approval of its transmission revenue requirement for 2007 and 2008.
|
Aug 8, 2007 |
Chatham-Kent Hydro Inc., |
EB-2007-0063 |
Today the Ontario Energy Board (the Board) issued a Decision with Reasons approving costs associated with smart metering activities incurred by 13 utilities authorized by government regulation to undertake smart metering activities.
|
Jul 31, 2007 |
Canadian Niagara Power Inc. – Fort Erie (Fort Erie), |
EB-2007-0514 |
Today the Ontario Energy Board (the Board) issued a Decision with Reasons approving rate adjustments to 2007 Distribution Rates to cover costs incurred by Canadian Niagara Power Inc. – Fort Erie (Fort Erie), Canadian Niagara Power Inc. – Port Colborne (Port Colborne), Peterborough Distribution Inc. (Peterborough), and Lakeland Power Distribution Ltd. (Lakeland) from severe storms in 2006 which inflicted significant damage to their respective distribution systems.
|
Jul 26, 2007 |
PowerStream Inc. |
EB-2007-0074 |
Today the Ontario Energy Board (the Board) issued a Decision and Order approving an application by PowerStream Inc. (PowerStream) to harmonize its 2007 distribution rates.
|
Jul 20, 2007 |
Hydro One Networks Inc. |
EB-2006-0352 |
On July 19, 2007, the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks Inc. (Hydro One) permission to expropriate land to construct an overhead 115 kilovolt transmission line to supply electricity to an automotive plant being built by Toyota Motor Manufacturing Canada Inc. (Toyota) in Woodstock.
|
Jul 18, 2007 |
Terrace Bay Superior Wires Inc. |
EB-2007-0666 |
Today the Ontario Energy Board (the Board) issued a Decision and Order regarding an application by Terrace Bay Superior Wires Inc. (Terrace Bay) to change its distribution rates.
|
Jul 12, 2007 |
Erie Thames Powerlines Corporation (Erie Thames) |
RP-2005-0020 |
Today the Ontario Energy Board (the Board) issued a Decision and Order regarding both the 2006 and 2007 electricity distribution rates for Erie Thames Powerlines Corporation (Erie Thames).
|
Jun 22, 2007 |
Thunder Bay Hydro Electricity Distribution Inc.(TB Hydro) |
RP-2005-0020 |
Today the Ontario Energy Board (the Board) issued a Decision on a Motion by Thunder Bay Hydro Electricity Distribution Inc.(TB Hydro) relating to errors in TB Hydro’s 2006 Distribution Rates filing and the related Rate Orders for 2006 and 2007.
|
Erie Thames Powerlines Corporation |
RP-2005-0020 |
Today, the Ontario Energy Board issued a Decision on the Motion by Erie Thames Powerlines Corporation (EB-2007-0016) seeking an Order Varying the Decision and Order of the Board in RP-2005-0020 / EB-2005-0361 / EB-2006-0197. |
|
May 29, 2007 |
Kruger Energy Port Alma Limited Partnership |
EB-2007-0006 |
The Ontario Energy Board today issued an Order granting an application by Kruger Energy Port Alma Limited Partnership (“KEPA”) for leave to construct transmission facilities which will connect a wind generating station to the transmission facilities of Hydro One Networks Inc.
|
Apr 10, 2007 |
Association of Major Power Consumers in Ontario (AMPCO) |
EB-2007-0040 |
Today the Ontario Energy Board (the Board) issued a decision with reasons denying the application by the Association of Major Power Consumers in Ontario for an Order revoking a market rule amendment and referring it back to the Independent Electricity System Operator (IESO) for further review.
Decision and Order revised April 12, 2007
Errata cover letter and Errata sheet April 12, 2007 |
Apr 2, 2007 |
Greater Sudbury Hydro Inc. |
EB-2006-0186 |
Today the Ontario Energy Board issued a Decision granting Greater Sudbury Hydro Inc. leave to amalgamate with West Nipissing Energy Services Ltd.
|
Mar 30, 2007 |
Hydro One Networks Inc. |
EB-2006-0501 |
Today, the Board has released its EB-2006-0501 partial decision and order regarding the Hydro One Networks Inc. request for the establishment of a 2007 transmission revenue deficiency deferral account.
|
Independent Electricity System Operator (IESO) |
EB-2006-0244 |
Today the Ontario Energy Board (the Board) issued its final Decision and Order on the application by the Independent Electricity System Operator (IESO) to set its fees for the 2007 fiscal year. Decision and Order revised Mar 23, 2007 |
|
Mar 8, 2007 |
Newmarket Hydro Ltd. (Newmarket Hydro) |
EB-2006-0344 |
Today the Ontario Energy Board issued a Decision and Order granting Newmarket Hydro Ltd. (Newmarket Hydro) and Tay Hydro Electric Distribution Company Inc. (Tay Hydro) leave to amalgamate.
|
Mar 5, 2007 |
Abitibi-Consolidated Company of Canada |
EB-2006-0175 |
Today the Board granted Abitibi-Consolidated Company of Canada's request to amend its electricity generation licence by changing its qualification from "owner and operator" of eight hydroelectric generating stations in the vicinities of Kenora, Fort Frances and Iroquois Falls to "operator" only. The Board also granted an electricity retailer licence and electricity generation licence to ACH Limited Partnership. ACH will be the licensed owner of the eight hydroelectric generating stations.
|
Feb 15, 2007 |
Ontario Power Authority (OPA) |
EB-2006-0233 |
Today the Ontario Energy Board issued a final Decision on the application by the Ontario Power Authority (OPA) to approve its 2007 expenditures and revenue requirement and fees.
|
Jan 31, 2007 |
Hydro One Networks Inc. |
EB-2006-0215 |
The Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One leave to construct Transmission Facilities in the City of Brampton, northwest of Toronto. The proposed facilities include a 4.2 kilometer extension of 230 kilovolt (kV) circuits as well as four in-line circuit breakers to be installed at the new Hurontario switching station, near the Brampton/Mississauga border. Hydro One proposes an in-service date for the proposed facilities, estimated to cost $42 million, of May 2009.
|
Jan 22, 2007 |
Ontario Power Generation (OPG)
Independent Electricity System Operator (IESO) |
EB-2006-0205 |
Today, the Ontario Energy Board (the Board) issued a Decision approving a second reliability must-run (RMR) contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator (IESO) for OPG’s Lennox generating station. The first contract was approved by the Board on March 13, 2006.
|
Jan 2, 2007 |
Erie Thames Powerlines Corporation (ETPC) |
RP-2005-0020 |
Today the Ontario Energy Board (the Board) issued a Decision and Order regarding 2006 Electricity Distribution Rates for Erie Thames Powerlines Corporation (ETPC).
|
2007 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 24, 2007 |
Union Gas Limited |
EB-2007-0837 |
The Board has issued its Decision with respect to the application by Union Gas Limited for an order granting the company leave to purchase 75% of the voting securities of Tipperary Gas Corp. |
Dec 21, 2007 |
Natural Resource Gas Limited |
EB-2007-0927 |
Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective January 1, 2008.
|
Dec 18, 2007 |
Enbridge Gas Distribution Inc. |
EB-2007-0897 |
The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective January 1, 2008.
|
Dec 13, 2007 |
Union Gas Limited |
EB-2007-0918 |
The Ontario Energy Board has approved changes to the rates for Union Gas Limited (Union), effective January 1, 2008.
|
Nov 6, 2007 |
Union Gas Limited |
EB-2007-0606 |
Today the Ontario Energy Board (the Board) issued an Oral Decision on Union Gas Limited’s (Union) Motion for an order implementing new rates on an interim basis effective January 1, 2008.
|
Oct 19, 2007 |
Union Gas Limited |
EB-2007-0661 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting Union Gas Limited (Union) leave to construct natural gas pipelines in the township of Dawn-Euphemia, in the County of Lambton subject to certain conditions of approval. Following its review of the evidence, the Board also prepared a favourable report to the Minister of Natural Resources recommending approval of the application to drill the proposed wells subject to the conditions of approval.
|
Oct 16, 2007 |
Enbridge Gas Distribution Inc. |
EB-2007-0692 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting an application by Enbridge Gas Distribution Inc. (Enbridge) to expropriate land owned by the City of Toronto Economic Development Corporation (TEDCO), to enable construction of a natural gas pipeline to supply natural gas to the Portlands Energy Centre (Portlands) generating station in the city of Toronto.
|
Oct 9, 2007 |
Union Gas |
EB-2007-0079 |
The Ontario Energy Board issued a Decision and Order granting Union Gas Limited (Union) leave to construct a natural gas pipeline in the Townships of Augusta and Edwardsburgh/Cardinal in the United Counties of Leeds and Grenville.
|
Sep 28, 2007 |
Natural Resource Gas Limited |
EB-2007-0734 |
Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective October 1, 2007.
|
Sep 24, 2007 |
Enbridge Gas Distribution Inc. |
EB-2007-0701 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective October 1, 2007.
|
Sep 14, 2007 |
Union Gas Limited (Union) |
EB-2007-0720 |
Today, the Ontario Energy Board has approved changes to the rates Union Gas Limited ( Union) charges its customers effective October 1, 2007.
|
Jul 30, 2007 |
Natural Gas Electricity Interface Review |
EB-2006-0322 |
Today, the Ontario Energy Board (the Board) issued its decision not to vary any aspect of its November 2006 decision on the Natural Gas Electricity Interface Review (NGEIR Decision)
|
Jul 5, 2007 |
Enbridge Gas Distribution Inc. (Enbridge) |
EB-2006-0034 |
Today the Ontario Energy Board (OEB) issued a Decision with Reasons pertaining to Enbridge Gas Distribution Inc.'s (Enbridge) application for approval of delivery rates for its 2007 fiscal year.
|
Jun 27, 2007 |
Union Gas Limited (Union) |
EB-2005-0211 |
Today the Ontario Energy Board (the Board) issued a Decision with Reasons on an application by Union Gas Limited (Union) related to proceeds from the sale of cushion gas and whether there is any basis on the evidence to allocate all or part of the gain to customers.
|
Jun 26, 2007 |
Natural Resource Gas Limited (NRG) |
EB-2007-0627 |
Today the Ontario Energy Board approved a decrease to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective July 1, 2007.
|
Jun 25, 2007 |
Enbridge Gas Distribution Inc. (Enbridge) |
EB-2007-0632 |
Today the Ontario Energy Board (the Board) approved Enbridge Gas Distribution Inc.’s (Enbridge) Quarterly Rate Adjustment Mechanism effective July 1, 2007.
|
Jun 14, 2007 |
Union Gas Limited |
EB-2007-0634 |
The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2007. Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.
|
Enbridge Gas Distribution Inc. (Enbridge) |
EB-2006-0305 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting Enbridge Gas Distribution Inc. (Enbridge) leave to construct natural gas pipelines to supply natural gas to the Portlands Energy Centre generating station (Portlands) in Toronto subject to conditions attached to its decision. |
|
May 30, 2007 |
Natural Resource Gas Limited |
EB-2007-0092 |
Today the Ontario Energy Board approved Natural Resource Gas Limited’s (NRG) application to dispense balances in its non-commodity related deferral/variance accounts as of September 30, 2006.
|
May 22, 2007 |
Natural Gas Electricity Interface Review |
EB-2006-0322 |
Today the Ontario Energy Board issued a Decision with Reasons on three Notices of Motions (Motions) to review certain aspects of the Natural Gas Electricity Interface Review (NGEIR) Decision. The Motions were filed by the City of Kitchener (Kitchener), the Association of Power Producers of Ontario (APPrO), and jointly by the Industrial Gas Users’ Association (IGUA), the Vulnerable Energy Consumers Coalition (VECC) and the Consumers Council of Canada (CCC).
|
Apr 26, 2007 |
Enbridge Gas Distribution Inc. |
EB-2006-0034 |
Today the Ontario Energy Board (the Board) issued a majority Decision finding that the Board does not have the jurisdiction to develop a rate class using income level as a determining factor.
|
Mar 28, 2007 |
Natural Resource Gas Limited (NRG) |
EB-2007-0048 |
Today the Ontario Energy Board approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective April 1, 2007.
|
Mar 26, 2007 |
Enbridge Gas Distribution Inc. |
EB-2006-0034 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2007. The changes are the result of an Interim Order regarding Enbridge’s 2007 rates and an Interim Decision and Order regarding Enbridge’s Quarterly Rate Adjustment Mechanism (QRAM). The 2007 rate order comes first and is immediately superseded by the April 2007 QRAM.
|
Union Gas Limited (Union) |
EB-2007-0053 |
The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2007. Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer. |
|
Feb 13, 2007 |
MHP Canada |
EB-2006-0162 |
Today, the Board issued reasons for its December 22, 2006 decision to approve applications by MHP Canada to develop St.Clair gas storage pool.
|
Feb 6, 2007 |
Tipperary Gas Corp. |
EB-2006-0018 |
Today, the Board issued a decision regarding three applications by Tipperary Gas Corp.
|
Feb 5, 2007 |
Market Hub Partners Canada (MHP)
Tribute Resources Inc. (Tribute)
Union Gas Limited |
EB-2005-0551 |
Today the Ontario Energy Board (the Board) issued an Order rescinding the storage rate orders of Market Hub Partners Canada (MHP) and Tribute Resources Inc. (Tribute), and Union Gas Limited's current Blanket Storage Order from previous Decisions.
|
Feb 2, 2007 |
Natural Resource Gas Limited (NRG) |
EB-2006-0243 |
Today the Ontario Energy Board issued a Decision and Order granting conditional leave to construct a natural gas pipeline and ancillary facilities to Natural Resource Gas Limited (NRG).
|
Jan 30, 2007 |
Union Gas Limited (Union) |
EB-2005-0211 |
Today the Ontario Energy Board (the Board) issued a Decision and Order regarding treatment of the disposition of certain deferral accounts by Union Gas Limited (Union). At issue is whether the Board has the jurisdiction to allocate any portion of the proceeds from the sale of cushion gas. In its Decision, the Board determined it has the power to apportion the proceeds of such asset sales between the utility and the ratepayer.
|
2006
2006 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 29, 2006 |
Thunder Bay Hydro Electricity Distribution Inc. (Thunder Bay Hydro) |
EB-2005-0419 |
Today the Ontario Energy Board issued a Vary Order regarding Thunder Bay Hydro Electricity Distribution Inc.’s (Thunder Bay Hydro) 2006 Electricity Distribution Rates.
|
Dec 21, 2006 |
Essex Powerlines Corporation (Essex) |
EB-2006-0176 |
Today the Ontario Energy Board (the Board) issued a Decision on a Motion from Essex Powerlines Corporation (Essex) in relation to the Board's April 12, 2006 Decision and Order regarding Essex's application for 2006 electricity distribution rates.
|
Nov 22, 2006 |
Ontario Energy Board (OEB) |
EB-2006-0087 |
The Board has posted a Decision issued on Monday November 20, 2006 in the Board's generic licence amendment proceeding - EB-2006-0087.
|
Oct 3, 2006 |
Enersource Hydro Mississauga Inc. (Enersource) |
EB-2006-0109 |
Today the Ontario Energy Board (the Board) issued a Decision on a Motion from Enersource Hydro Mississauga Inc. (Enersource) in relation to the Board’s April 12, 2006 Decision on Enersource’s 2006 electricity distribution rates.
|
Sep 22, 2006 |
PowerStream Inc.’s (PowerStream) |
EB-2006-0108 |
Today the Ontario Energy Board (the Board) issued an Order to vary certain aspects of PowerStream Inc.’s (PowerStream) 2006 Electricity Distribution Rates which were approved earlier this year and took effect on May 1, 2006.
|
Sep 13, 2006 |
Ontario Power Generation Inc. |
EB-2006-0110 |
The Board has issued a Decision and Order implementing a directive from the Ministry of Energy that amends the licence conditions relating to the OPG Rebate, of the generation licence of Ontario Power Generation Inc., and the licences of the Independent Electricity System Operator, the distributors and the retailers.
|
Jul 26, 2006 |
Hydro One Network Inc. |
EB-2006-0180 |
On July 21, 2006 the Ontario Energy Board (the Board) issued a Decision and Order granting Hydro One Networks an interim distribution licence to operate Cat Lake Power Utility Ltd.’s transmission and distribution system. This license to operate does not change the ownership of the assets which remain with Cat Lake Power for the transmission component, and the Ontario Electricity Financial Corporation (OEFC) for the distribution component. Hydro One is to take on this operational responsibility no later than August 14, 2006.
|
Jul 17, 2006 |
Northern Ontario Wires Inc. |
RP-2005-0020 |
An Application by Northern Ontario Wires Inc. for an order or orders approving or fixing just and reasonable distribution rates and other charges, effective May 1, 2006.
|
Jul 6, 2006 |
Ottawa River Power Corporation |
RP-2005-0020 |
Today the Ontario Energy Board (the Board) issued its 2006 electricity distribution rate Decision and Order for Ottawa River Power Corporation.
|
Jun 28, 2006 |
Toronto Hydro |
RP-2004-0203 |
The Ontario Energy Board (the “Board”) today approved Toronto Hydro’s request to implement a new conservation and demand management program aimed at rewarding consumers for electricity conservation during the summer months.
|
Apr 20, 2006 |
West Coast Huron Energy Inc. |
EB-2004-0513 |
The Board has released its decision regarding the review of the RP-2000-0263/EB-2000-0563/EB-2001-0226 distribution rates decision for West Coast Huron Energy Inc.
|
Apr 19, 2006 |
Hydro One Networks Inc. |
EB-2005-0528 |
The Board has released its decision on an application by Hydro One Networks Inc. to amend the distribution rates for its Distributed Generation customers on an interim basis.
|
Mar 29, 2006 |
Greenfield Energy Limited Partnership |
EB-2005-0478 |
Today, the Ontario Energy Board (OEB) issued a Decision and Order granting Greenfield Energy Limited Partnership (Greenfield) leave to construct 3.5 km of 230 kV transmission circuits to connect the Greenfield Energy Centre to the transmission facilities of Hydro One Networks Inc. in the Township of St. Clair.
|
Mar 21, 2006 |
2006 Electricity Distribution Rates. |
RP-2005-0020 |
Today, the Ontario Energy Board (OEB) issued a Decision on a number of common issues regarding 2006 electricity distribution rates.
|
Mar 13, 2006 |
Ontario Power Generation (OPG)
Independent Electricity System Operator (IESO) |
EB-2005-0490 |
Today, the Ontario Energy Board issued a Decision approving a reliability must-run contract between Ontario Power Generation (OPG) and the Independent Electricity System Operator for OPG's Lennox generating station. Reliability must run contracts keep generating stations available to maintain the reliability of the electricity system.
|
Mar 3, 2006 |
Conservation and Demand Management (CDM) |
RP-2005-0020 |
Today, the Ontario Energy Board (the "Board") issued a Decision to provide guidance for all utilities related to the filing and evaluation of certain Conservation and Demand Management (CDM) initiatives, for the purpose of 2006 rates.
|
Feb 21, 2006 |
Guelph Hydro Electric Systems Inc. (GHESI)
Wellington Electric Distribution Company Inc.(Wellington) |
EB-2005-0533 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting leave for Guelph Hydro Electric Systems Inc. (GHESI) and Wellington Electric Distribution Company Inc. ( Wellington) to amalgamate.
|
Feb 21, 2006 |
Hydro One Networks Inc. (Hydro One) |
EB-2005-0501 |
Today, the Ontario Energy Board (the Board) issued a Decision to establish a new deferral account to record any over-earnings realized in 2006 through Hydro One Networks Inc. (Hydro One) transmission rates.
|
Feb 14, 2006 |
Independent Electricity System Operator (IESO) |
EB-2005-0499 |
Decision
Interim Decision - Feb 3, 2006
|
2006 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 20, 2006 |
Enbridge Gas Distribution Inc. |
EB-2006-0288 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2007.
|
Dec 19, 2006 |
Natural Resource Gas Limited (NRG) |
EB-2006-0503 |
Today the Ontario Energy Board approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) charges its customers effective January 1, 2007.
|
Dec 19, 2006 |
Union Gas Limited (Union) |
EB-2005-0520 |
The Ontario Energy Board (the Board) has approved changes to the rates Union Gas Limited (Union) charges its customers effective January 1, 2007. The new rates reflect four decisions of the Board that affect Union's 2007 rates. These decisions are the 2007 rates case, the Natural Gas Electricity Interface Review (NGEIR), the Demand Side Management review (DSM) and the Quarterly Rate Adjustment Mechanism (QRAM).
|
Nov 7, 2006 |
Natural Gas Electricity Interface Review (NGEIR) |
EB-2005-0551 |
Today the Ontario Energy Board issued a Decision with Reasons on the Natural Gas Electricity Interface Review (NGEIR) proceeding. The NGEIR proceeding followed on from the Natural Gas Forum Report, in which the Board determined that ensuring Ontario’s natural gas infrastructure can meet the demands created by new natural gas-fired electricity generators is an “important and immediate priority.”
|
Sep 28, 2006 |
Natural Resource Gas Ltd. |
EB-2006-0213 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Natural Resource Gas Ltd. effective October 1, 2006. These changes will increase total costs for a typical residential customer.
Decision and order (revised)
|
Sep 25, 2006 |
Enbridge Gas Distribution Inc. |
EB-2006-0195 |
Today the Ontario Energy Board approved changes to the rates charged by Enbridge Gas Distribution Inc. effective October 1, 2006. While there were no changes directly related to the forecast of the commodity rate, there were changes to the delivery rates charged by Enbridge as well as a change to the Gas Cost Adjustment between October 1, 2006 and December 31, 2006. These changes will result in a slight decrease to the total costs for a typical residential customer.
|
Sep 20, 2006 |
Natural Resource Gas Ltd’s (NRG) |
EB-2005-0544 |
The Board issued a Decision with Reasons on Natural Resource Gas Ltd's (NRG) application for changes to its delivery rates for the 2007 fiscal year, effective October 1, 2006. The Decision applies to approximately 6,500 residential and non-residential customers of NRG in Aylmer and surrounding areas.
|
Sep 19, 2006 |
Union Gas Limited (Union) |
EB-2006-0500 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.
|
Aug 25, 2006 |
Natural Gas Demand Side Management Generic Issues Proceeding |
EB-2006-0021 |
Today, the Ontario Energy Board (the “Board”) issued a Decision related to the filing and evaluation of certain Demand Side Management (DSM) initiatives undertaken by natural gas utilities.
|
Jul 18, 2006 |
Natural Gas Electricity Interface Review Issues and Storage Regulation |
EB-2005-0551 |
On Friday, July 14, 2006 in the NGEIR oral hearing the Board made a ruling on a "threshold issue" which is related to the Enbridge Gas Distribution Inc. Rates 125 and 300.
|
Jul 10, 2006 |
Enbridge Gas Distribution Inc. |
EB-2005-0539 |
An application by Enbridge Gas Distribution Inc. pursuant to subsection 90(1) of the Ontario Energy Board Act, 1998 for an Order granting leave to construct 6.5 kilometres of natural gas pipeline in the City of Brampton to supply natural gas to an electricity generating station.
|
Jun 29, 2006 |
Natural Gas Electricity Interface Review Issues and Storage Regulation |
EB-2005-0551 |
On June 27, 2006 the Board issued an oral decision on the Union Settlement Agreement, dated June 13, 2006. The decision addressed Union’s proposed procedure for determining access to F24-T service.
|
Jun 29, 2006 |
Union Gas Limited |
EB-2005-0520 |
The Board today issued its Decision with Reasons concerning Union Gas Limited's (Union) application for a Board Order approving rates for its 2007 fiscal year commencing January 1, 2007. The proceeding included a settlement process whereby Union and the other parties reached a settlement on a majority of the issues.
|
Jun 22, 2006 |
Enbridge Gas Distribution Inc. |
EB-2006-0099 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective July 1, 2006. These changes will decrease total costs for a typical residential customer.
|
Natural Resource Gas Limited (NRG) |
EB-2006-0111 |
The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective July 1, 2006. |
|
Jun 15, 2006 |
Union Gas Limited (Union) |
EB-2006-0106 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.
|
Jun 12, 2006 |
Union Gas Limited (Union) |
EB-2005-0550 |
Today the Ontario Energy Board (the Board) issued a Decision and Order granting Union Gas Limited (Union) leave to construct 18.1 kilometers of 48 inch diameter natural gas pipeline and ancillary facilities to expand the Trafalgar transmission system in the County of Middlesex.
|
Mar 30, 2006 |
Union Gas Limited |
EB-2005-0507 |
Today the Ontario Energy Board released its Order concerning Union Gas Limited's 2006 Demand Side Management Plan.
|
Mar 28, 2006 |
Union Gas Limited |
EB-2006-0015 |
Today, the Board issued a Decision and Order approving an application by Union Gas Limited respecting an assignment of an existing gas storage contract to Virginia Power Energy Marketing Inc. from Duke Energy Marketing Canada Corp.
|
Mar 28, 2006 |
Natural Resource Gas Ltd. |
EB-2005-0555 |
Today the Ontario Energy Board approved Natural Resource Gas Limited’s (NRG) application to dispense balances in its non-commodity related deferral/variance accounts as of September 30 2005.
|
Mar 27, 2006 |
Enbridge Gas Distribution Inc. |
EB-2006-0035 |
The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective April 1, 2006.
|
Mar 22, 2006 |
Natural Resource Gas Limited (NRG) |
EB-2006-0037 |
The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective April 1, 2006.
|
Mar 13, 2006 |
Union Gas Limited (Union) |
EB-2006-0033 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective April 1, 2006 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Consumers’ bills will change depending on the amount of natural gas used, type of consumer and the location of the consumer.
|
Feb 9, 2006 |
Enbridge Gas Distribution Inc.’s (EGDI) |
EB-2005-0001 |
Today the Ontario Energy Board (OEB) issued a Decision with Reasons pertaining to Enbridge Gas Distribution Inc.'s (EGDI) application for approval of delivery rates for its 2006 fiscal year.
|
Jan 30, 2006 |
Enbridge Gas Distribution Inc. |
EB-2006-0002 |
Today the Board issued a report to the Minister of Natural Resources concerning an application by Enbridge to drill two oil extraction wells in the Corunna Designated Gas Storage Area.
|
Jan 6, 2006 |
Greenfield Energy Centre Limited Partnership (GEC)
Union Gas Limited |
RP-2005-0022 |
Today the Ontario Energy Board issued a Decision and Order determining that competing applications from both Greenfield Energy Centre Limited Partnership (“GEC”) and Union Gas Limited (“Union”) to each construct a two kilometre natural gas pipeline and associated equipment in the Sarnia area were credible and in the public interest. The two competing applications would serve the same potential load – a planned 1,005 MW gas-fired generating station (being built by GEC) in Courtright, south of Sarnia.
|
2005
2005 Electricity Decisions and Reports
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 9, 2005 |
Great Lakes Power Limited GLPL |
EB-2005-0241 |
On December 8, the Ontario Energy Board issued a Decision and Order approving the rate schedule for the recovery of the revenue requirements of the electricity transmitters (Hydro One Networks Inc., Great Lakes Power Ltd., Canadian Niagara Power Inc. and Five Nations Energy Inc.). The schedule maintains the currently approved uniform transmission rates, but adjusts the allocation factors among the four transmitters, such that the share of revenue allocated to Great Lakes Power Ltd. increases to reflect its approved revenue requirement, the share of revenue allocated to Hydro One Networks Inc. decreases and the shares of revenue allocated to Canadian Niagara Power Inc. and Five Nations Energy Inc. are unchanged.
|
Nov 23, 2005 |
Hydro One Networks Electricity Transmission Licence |
RP-2005-0315 |
The Ontario Energy Board (OEB) today issued its Decision and Order regarding the need for additional electrical power in York Region north of Toronto.
|
Oct 14, 2005 |
Attawapiskat Power Corporation |
EB-2005-0233 |
Today the Ontario Energy Board issued a Decision and Order approving the joint application by Attawapiskat Power Corporation and the Attawapiskat First Nation for final rates based on interim rates approved by the Board on December 23, 2003.
|
Sep 30, 2005 |
Ontario Power Authority (OPA) |
EB-2005-0302 |
Today the Ontario Energy Board issued the licence of the Ontario Power Authority (OPA).
|
Sep 20, 2005 |
Independent Electricity System Operator (IESO) |
EB-2004-0477 |
Today the Board is issuing its Supplementary Decision in the matter of the IESO’s proposals on stakeholder engagement. The Board received one reply to its September 6, 2005 request for comments.
|
PowerStream Inc. |
EB-2005-0254 |
Today the Ontario Energy Board issued a Decision allowing PowerStream Inc. to acquire all outstanding shares in, and to subsequently amalgamate with, Aurora Hydro Connections Limited. |
|
Sep 16, 2005 |
Greater Sudbury Hydro Inc.
West Nipissing Energy Services Ltd. |
EB-2005-0234 |
Today the Ontario Energy Board issued a Decision allowing Greater Sudbury Hydro Inc. to acquire all outstanding shares in West Nipissing Energy Services Ltd.
|
Sep 16, 2005 |
Veridian Connections Inc.
Gravenhurst Hydro Electric Inc. |
EB-2005-0257 |
Today the Ontario Energy Board issued a Decision allowing Veridian Connections Inc. to acquire all outstanding shares in, and to subsequently amalgamate with, Gravenhurst Hydro Electric Inc.
|
Aug 31, 2005 |
Greater Sudbury Hydro Inc.
PowerStream Inc.
Aurora Hydro Connections Limited
Veridian Connections Inc.
Gravenhurst Hydro Electric Inc. |
RP-2005-0018 |
Today the Ontario Energy Board issued a Decision following a combined hearing involving three applications for approval in relation to the acquisition of shares in (and in two cases the amalgamation of) electricity distribution companies. The Decision sets out the test to be used in deciding applications for the approval of share acquisitions and amalgamations under section 86 of the Ontario Energy Board Act, 1998.
|
Jul 29, 2005 |
Tillsonburg Hydro Inc. |
EB-2005-0205 |
Today, the Ontario Energy Board issued its Decision and Order approving Tillsonburg’s application for a distribution rate adjustment to recover its 1999 net loss.”
|
Jul 28, 2005 |
Superior Wind Prince Power Inc. |
EB-2005-0249 |
The Ontario Energy Board today issued a Decision and Order granting Superior Wind Prince Power Inc. leave to construct transmission facilities which will connect a wind farm to the transmission system of Great Lakes Power Ltd. (GLPL).
|
Jul 27, 2005 |
Cambridge and North Dumfries Hydro Inc.’s (CNDHI) |
EB-2005-0285 |
Today the Ontario Energy Board issued a Decision denying Cambridge and North Dumfries Hydro Inc.’s (CNDHI) application for a rate adjustment to recover in rates, costs associated with its MTS#1 transformer station which was built in 2002.
|
Jul 25, 2005 |
Hydro One Networks Inc. |
RP-1999-0057 |
The Board issued a Decision and Order covering two elements of the TSC . The first, in Section 2.6 of the TSC (section 4.6 of the Revised Code), addresses the need for transmitters to develop rules and procedures in order to enable them to require that non-compliant customer equipment be brought into compliance with the performance standards and technical requirements of the TSC. The second, in Section 2.5 of the TSC (Section 4.5 of the Revised Code), requires transmitters to file delivery point performance standards with the Board for its review and approval.
|
Jul 18, 2005 |
De Beers Canada Inc., Hydro One Networks Inc. and Five Nations Energy Inc. (FNEI) |
EB-2004-0545 |
Today the Ontario Energy Board issued a Decision and Order approving the joint application by De Beers Canada Inc., Hydro One Networks Inc. and Five Nations Energy Inc. (FNEI) to construct transmission facilities that will connect De Beers Canada Inc.’s planned Victor Diamond Mine in Northern Ontario to Ontario’s transmission grid.
|
Jul 8, 2005 |
Hydro One Networks Inc. |
EB-2004-0476 |
Today the Ontario Energy Board issued a Decision and Order granting Hydro One Networks Inc. leave to construct transmission facilities in the Niagara region. The Board had previously issued an Interim Decision and Procedural Order outlining the additional evidence it required before it could make a final decision.
|
Jun 27, 2005 |
Erie Shores Wind Farm Limited Partnership |
EB-2005-0230 |
The Ontario Energy Board today issued an Order granting an application by Erie Shores Wind Farm Limited Partnership (Erie Shores) for leave to construct transmission facilities which will connect a wind farm to the transmission facilities of Hydro One Networks Inc. The Order follows an oral Decision made by the Board during a hearing last week.
|
Jun 24, 2005 |
Chatham-Kent Energy Inc. |
EB-2005-0255 |
The Ontario Energy Board today issued a Decision allowing Chatham-Kent Energy Inc. (“CKEI”) to acquire all outstanding shares in Middlesex Power Distribution Corporation (“MPDC”).
|
Jun 21, 2005 |
Veridian Connections Inc. |
EB-2005-0256 |
Today the Ontario Energy Board today issued a Decision allowing Veridian Connections Inc. to acquire all outstanding shares in and subsequently amalgamate with Scugog Hydro Energy Corporation.
|
Jun 16, 2005 |
Oakville Hydro |
EB-2005-0292 |
The Ontario Energy Board has issued its oral Decision on the Oakville Hydro Motion to vary (EB-2005-0292) the Board's May 11, 2005 Reasons for Decision on Oakville's Large User Adjustment Application (EB-2004, 200527) and has amended those Reasons for Decision.
Amended EB-2004, 200527 Reasons, click here... |
Jun 1, 2005 |
Espanola Regional Hydro Distribution Corporation (Espanola Hydro) |
EB-2005-0243 |
The Ontario Energy Board has denied an application from Espanola Regional Hydro Distribution Corporation (Espanola Hydro) for a rate increase to its large commercial customers. The Board ruled that the distributor had not provided sufficient financial and regulatory information needed to make an informed decision.
|
May 24, 2005 |
Independent Electricity System Operator (IESO) |
EB-2004-0477 |
Today the Ontario Energy Board issued its Decision regarding 2005 fees for the Independent Electricity System Operator (IESO).
|
May 18, 2005 |
Hydro One Networks Inc. |
EB-2004-0476 |
Today the Ontario Energy Board issued an Interim Decision in Hydro One Networks Inc.’s application to construct transmission facilities in the Niagara region.
* Note: section 2.5, paragraph 2 was revised on May 24, 2005 |
May 12, 2005 |
Oakville Hydro Electricity Distribution Inc. |
EB-2004-0527 |
The Ontario Energy Board has issued reasons relating to its April 1, 2005 Decision on Oakville Hydro’s 2005 distribution rates.
Amended Decision with Reasons (June 15, 2005) |
Apr 5, 2005 |
Great Lakes Power Limited |
EB-2004-0505 |
The Board today issued an Order amending Great Lakes Power Limited's transmission rate order, prescribing Wholesale Meter Services Rebates and Exit Charges.
|
Apr 1, 2005 |
PowerStream Inc. |
EB-2005-0209 |
The Ontario Energy Board (the Board) has issued its Decision on an application by PowerStream Inc. authorizing changes to rates charged to customers for the utility’s Network Retail Transmission Service Rate (NRTSR) and Connection Retail Transmission Service Rate (CRTSR). Retail transmission service rates for distributors recover transmission service costs charged by the Independent Electricity System Operator (IESO) for transmission connection and network services.
|
Apr 1, 2005 |
2005 Electricity Distribution Rates |
n/a |
Between March 15-31, the OEB issued Decisions on utilities' applications for distribution rate changes for 2005. To view the Decisions and the impact on a typical residential consumer bill, click here. |
Mar 29, 2005 |
Approved Conservation and Demand Management (CDM) Plans |
n/a |
The OEB has approved all Conservation and Demand Management (CDM) Plan applications. To view a summary of the CDM Plan, Budget and a copy of the Decision and Order: Click here. |
Mar 15, 2005 |
Electricity Local Distribution Companies ("utilities") |
various |
Between March 15-31, the OEB issued Decisions on utilities' applications for distribution rate changes for 2005. To view the Decisions and the impact on a typical residential consumer bill, click here. |
Mar 11, 2005 |
Hydro One |
EB-2004-0436 |
Today the Board approved an application by Hydro One to build a 2.2km tunnel under the City of Toronto to carry cables which will increase the security, reliability and maintainability of the electricity grid in the Toronto area. The $44.7m project will place 230kV cables 20 metres below the road surface, connecting the John and the Esplanade transformer stations, and will enable future expansion of the grid to accommodate increasing load in the area. Read the full decision here.
|
Mar 8, 2005 |
Canadian Cable Television Association |
RP-2003-0249 |
The Ontario Energy Board today established rates for telecommunication and cable companies wanting to use electric utility poles for the purpose of supporting transmission lines. The ruling follows an application by the Canadian Cable Telecommunications Association on behalf of 23 CCTA members who operate systems in Ontario.
|
Mar 3, 2005 |
Hydro One Brampton Networks Inc. |
EB-2005-0215 |
On March 2, 2005, the Board issued its Decision and Order in connection with Hydro One Brampton Networks Inc.’s request to establish a deferral account to record pension contribution costs and associated carrying charges.
|
Feb 22, 2005 |
Hydro One Networks Inc. and Hydro One Networks Brampton Inc. |
RP-2004-0203 |
On February 18, 2005, the OEB, by the way of an oral decision, approved the Conservation and Demand Management (CDM) Plans of Hydro One Networks Inc. (HONI) and Hydro One Networks Brampton Inc. (Brampton).
|
Feb 11, 2005 |
Enersource Hydro Mississauga Inc. |
EB-2005-0196 |
Today the Board issued its Decision and Order in connection with Enersource Hydro Mississauga Inc.’s request to establish a deferral account to record pension contribution costs and associated carrying charges.
|
Jan 26, 2005 |
Ontario Energy Board |
RP-2004-0196 |
The Ontario Energy Board today submitted its proposed implementation plan on smart meters to the Minister of Energy. The plan outlines a basic smart meter system in Ontario to measure how much electricity a consumer uses each hour of the day.
Smart Meter Implementation Plan - Report of the Board to the Minister |
Jan 12, 2005 |
Hamilton Hydro Inc. and St. Catharines Hydro Utility Services Inc. |
EB-2004-0504 |
The Ontario Energy Board issued a decision allowing Hamilton Hydro Inc. (HHI) and St. Catharines Hydro Utility Services Inc. (SCHUSI) to amalgamate. The utilities made an application proposing the amalgamation to the Board on November 19, 2004.
|
2005 Gas Decisions and Reports
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 22, 2005 |
Enbridge Gas Distribution Inc. |
EB-2005-0001 |
The Ontario Energy Board has issued a partial decision on Enbridge Gas Distribution's DSM plan which was filed as part of its 2006 Rate application. The partial decision approves elements of that plan and includes information on a natural gas DSM generic hearing that will occur in 2006.
|
Dec 21, 2005 |
Enbridge Gas Distribution Inc. |
EB-2005-0001 EB-2005-0524 |
The Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective January 1, 2006.
|
Dec 19, 2005 |
Natural Resource Gas Limited (NRG) |
EB-2005-0540 |
The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective January 1, 2006.
|
Dec 12, 2005 |
Union Gas Limited |
EB-2005-0531 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Customers’ bills will change depending on the amount of gas used, type of customer and the location of the customer.
|
Nov 15, 2005 |
Gas Distribution Access Rule |
RP-2000-0001 |
Today the Ontario Energy Board issued a Decision and Order approving the form of Service Agreement and Electronic Business Transactions Standards for the purposes of the Gas Distribution Access Rule. That Rule was developed to facilitate competition in the sale of gas by establishing rules governing the gas distributor-gas vendor relationship.
|
Oct 28, 2005 |
Union Gas Limited (Union) |
RP-2005-0025 |
Today the Board issued its decision in regard to applications from Union Gas. The Board approved the terms, volumes, and parties to three long term gas storage agreements. The agreements are with Duke Energy Marketing Canada Corp., NJR Energy Services Company and Suncor Energy Products.
|
Oct 13, 2005 |
Union Gas Limited (Union) |
EB-2005-0449 |
Today the Ontario Energy Board ruled on a motion respecting an application by Union Gas Limited (Union) to establish new rates for 2006. The Board found the evidence provided was insufficient to grant Union’s request at this time. The procedural motion sought input from participants on how the Board ought to proceed with the application.
|
Oct 6, 2005 |
Natural Resource Gas Limited (NRG) |
RP-2004-0167 |
The Ontario Energy Board (the “Board”) today ruled on a motion by Natural Resource Gas (NRG) to re-hear and vary certain findings of the Board’s December 20, 2004 Decision regarding the utility’s rates.
|
Sep 23, 2005 |
Enbridge Gas Distribution Inc. |
EB-2005-0461 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. effective October 1, 2005. These changes will increase total costs for a typical residential customer.
|
Sep 23, 2005 |
Natural Resource Gas Limited |
EB-2005-0466 |
The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective October 1, 2005.
|
Sep 14, 2005 |
Union Gas Limited |
EB-2005-0462 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective October 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). Customers’ bills will change depending on the amount of gas used, type of customer and the location of the customer.
|
Sep 13, 2005 |
Gas Distribution Access Rule |
RP-2000-0001 |
The Board has issued a Procedural Order requesting comments on a staff Proposal for the Electronic Business Transactions (EBT) Standards Appendix to the Service Agreement under the Gas Distribution Access Rule (RP-2000-0001), in accordance with the Board’s Decision and Order issued May 9, 2005.
|
Aug 2, 2005 |
Union Gas Limited |
RP-2005-0017 |
Today the Ontario Energy Board issued a Decision and Order approving applications by Union Gas Limited (Union) to amend its natural gas storage contract with Gaz Metro Limited Partnership, and replace an expired natural gas storage contract with Nexen Marketing.
|
Jul 6, 2005 |
Union Gas Limited |
EB-2005-0201 |
The Ontario Energy Board today issued an Order granting Union Gas Limited (Union) leave to construct two sections of natural gas pipeline and associated compressor station modifications in the southwestern region of the province. The expansion will be used to meet the increasing natural gas demands of Ontario’s current and future customers. The Order follows an oral Decision made by the Board during a hearing last week.
|
Jun 23, 2005 |
Enbridge Gas Distribution Inc. |
EB-2005-0291 |
Today the Ontario Energy Board approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective July 1, 2005. These changes will increase total costs for a typical residential customer.
|
Jun 20, 2005 |
Natural Resource Gas Limited |
EB-2005-0235 |
The Ontario Energy Board has approved increases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to gas supply charges are effective July 1, 2005.
|
Jun 20, 2005 |
Tribute Resources Inc. and Tipperary Gas Corp. |
RP-2003-0253 |
On June 17, the Board issued it’s decision (with reasons to follow) approving Tribute Gas Corp.’s (Tribute) application to inject, store and withdraw gas in Tipperary designated storage pool in Huron County, Ontario and approving rates for the sale of gas storage services. Earlier in the proceeding, the Board approved Tribute’s applications for designation as gas storage area and issued a favorable report of the Board to the Minister of Natural Resources with respect to applications for licenses to drill three wells in the storage area. Also, by an earlier order, the Board determined compensation to be paid by Tribute to the landowners. The decision issued on June 17, 2005, collectively with the previous approvals will support the conversion of the existing Tipperary north pool in the Township of Central Huron from gas production to gas storage.
Reasons for June 17th Decision (Aug 25, 2005)
Decision with Reasons (Jun 17, 2005)
Compensation order (May 31, 2005)
Partial Decision (Oct 25, 2004) |
Jun 10, 2005 |
Union Gas Limited |
EB-2005-0290 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) charges its customers effective July 1, 2005 as part of its Quarterly Rate Adjustment Mechanism (QRAM). There will also be temporary credits for delivery and transportation rates from July 1, 2005 to December 31, 2005 reflected in the rate changes. The credits relate to 2004 deferral accounts and 2003 earning sharings. Spread over the five months, the credits are equivalent to a total of about $5 for Southern rate zone customers (residential) and about $20 for all other Union residential customers.
|
May 19, 2005 |
Union Gas Limited |
RP-2003-0063 |
Today, the Ontario Energy Board issued its Decision regarding an application from Union Gas to alter its M16 rate schedule for natural gas transportation for embedded storage pools.
|
May 9, 2005 |
Gas Distribution Access Rule |
RP-2000-0001 |
The Ontario Energy Board today announced that it will work with the natural gas sector to implement the Board’s Gas Distribution Access Rule. This decision comes after natural gas distributors and marketers were unable to agree on the terms of a Service Agreement and the supporting business / transaction standards required by the Rule. The Service Agreement outlines the entire relationship between natural gas distributors and marketers, including switching suppliers, billing and settlements.
|
Mar 30, 2005 |
Ontario Energy Board |
RP-2004-0213 |
The Ontario Energy Board today released its report outlining a regulatory framework for the province’s natural gas sector. The report provides the Board’s analysis of current issues and its conclusions to support the long-term evolution of a more efficient natural gas sector, leading to greater stability for industry and sustainable benefits for consumers.
Natural Gas Regulation in Ontario: A Renewed Policy Framework |
Mar 24, 2005 |
Natural Resource Gas Limited |
EB-2005-0235 |
The Ontario Energy Board has approved decreases to the natural gas supply rates Natural Resource Gas Limited (NRG) bills its customers. The changes to natural gas supply charges are effective April 1, 2005.
|
Mar 24, 2005 |
Enbridge Gas Distribution Inc. |
EB-2005-0229 |
The Ontario Energy Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective April 1, 2005. These changes will decrease total costs for a typical residential customer.
|
Mar 18, 2005 |
Union Gas Limited |
RP-2003-0063 |
The Board issued its Decision and Order in the Notice of Motion filed by Union Gas Limited on February 2, 2005. Union's Notice of Motion sought an Order to vary certain provisions of the Board's December 15, 2004 Decision that set Union's 2005 rates (file number RP-2003-0063/EB2004/0480). The Board denied Union's request to vary the Board's December 15, 2004 Decision.
|
Jan 26, 2005 |
Enbridge Gas |
RP-2003-0203 |
Today the Ontario Energy Board issued a Decision disallowing Enbridge Gas Distribution Inc. (Enbridge) from including $7.1 million of Customer Care Services (“CCS”) costs as a deduction in its 2004 earnings sharing calculation.
|
2004
2004 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 10-04 |
Enersource, Hamilton, Hydro Ottawa, PowerStream, Toronto Hydro and Veridian |
RP-2004-0203 |
Today the Ontario Energy Board issued its Decision approving applications from six of the province’s largest local electricity distribution companies for their third installment (“tranche”) of incremental Market Adjusted Revenue Requirement (MARR) related to conservation and demand management (CDM) initiatives.
|
June 8-04 |
Initiated by the Ontario Energy Board |
RP-2002-0120 |
The Board today issued its Phase 1 Policy Decision in the Transmission System Code Proceeding. This Decision reflects the Board's findings regarding Available Capacity, Transmission System Bypass, Cost Responsibility, Contestability, Economic Evaluation and Contractual issues.
Appendix B - Settlement Conference Facilitator's Report
Appendix C - Synopsis of the Board Decision
(Note: For specific findings and reasoning supporting those findings, it is important to refer to the Decision itself. All matters of interpretation are dependent on the words of the Decision) |
Mar 1-04 |
Centre Wellington Hydro
Veridian Connections Inc.
EnWin Powerlines Ltd.
Erie Thames Powerlines Corp.
Chatham-Kent Hydro Inc.
Cooperative Hydro Embrun Inc.
Hydro One Networks Inc. |
RP-2003-0044 |
The Board has issued its Decision with Reasons in the matter of applications by various electricity distributors for amendments to their licensed service areas.
|
2004 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 22-04 |
Enbridge Gas Distribution Inc. |
RP-2003-0203 |
The Ontario Energy Board has approved changes to natural gas commodity and delivery rates charged by Enbridge Gas Distribution Inc. (Enbridge) effective January 1, 2005. These changes will increase total costs for a typical residential customer.
|
Natural Resource Gas Limited |
RP-2004-0167 |
The Board issued its Decision with Reasons in Natural Resource Gas' application for rates for its 2005 fiscal year. The Board has also issued its Decision in the QRAM application for rates effective January 1, 2005.
|
|
Dec 16-04 |
Union Gas Limited |
RP-2003-0063 |
The Ontario Energy Board has approved changes to the rates Union Gas Limited (Union) will charge to its customers effective January 1, 2005. The changes will result in an increase to customer bills, depending on the type of customer, location of the customer and the amount of natural gas used. The new charges incorporate Union’s approved 2005 delivery rates and the January 1st quarterly commodity price adjustments under the Quarterly Rate Adjustment Mechanism (QRAM).
|
Dec 3-04
|
Enbridge Gas Distribution Inc. |
RP-2003-0203 |
Decision
Decision - Nov 24-04
|
Nov 1-04
|
Enbridge Gas Distribution Inc. |
RP-2003-0203 |
Decision
Appendix B - Settlement Proposal
Appendix C - Decision on Motion
Partial Decision - issued Aug 31-04
|
May 27-04 |
Enbridge Gas Distribution Inc. |
RP-2003-0203 |
The Board issued a Decision on Motion in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2005 fiscal year, commencing October 1, 2004.
|
March 18-04 |
Union Gas Limited |
RP-2003-0063 |
The Board today has issued its Decision with Reasons in the matter of an Application by Union Gas Limited for an order or orders approving or fixing just and reasonable rates for the sale, distribution, storage, and transmission of gas for the period commencing January 1, 2004 (RP-2003-0063).
Decision (Chapter 12 - revised March 25-04)
Executive Summary (revised March 25-04)
Appendix A - Return on Equity Calculation
Appendix B - Financial Schedule (revised March 25-04)
Appendix C - Settlement Agreement
Press release (revised March 25-04) |
Jan 16-04 |
Union Gas Limited and Enbridge Gas Distribution Inc. |
RP-2002-0158 |
The Board issued a Decision and Order in respect of applications by Union Gas Limited and Enbridge Gas Distribution Inc. for a review of the Board's guidelines for establishing their respective Return on Equity.
|
2003
2003 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 19-03 |
Independent Electricity System Operator |
RP-2003-0220 |
The Board today issued its Decision with Reasons with respect to the Independent Electricity System Operator approving its proposed expenditures and revenue requirement and fixing fees which it may charge for the year 2004.
|
Apr 7-03 |
Ontario Power Generation (OPG) Inc. |
RP-2002-0142 |
OPG application to amend its licence obligations to provide a rebate to consumers under specified circumstances.
|
2003 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 3-03 |
Enbridge Gas Distribution Inc. |
RP-2002-0135 |
The Board issued a Decision with Reasons in an application by Enbridge Gas Distribution Inc. in respect of a proposal to establish a Deferred Income Tax Deferral Account and other related matters for its 2002 fiscal year.
|
Nov 7-03 |
Enbridge Gas Distribution Inc. |
RP-2002-0133 |
Decision
Appendix B - Settlement Proposal
Appendix C - Financial Statements (Excel file)
The Partial Decision deals with certain matters relating to the company's demand-side management programs.
|
Sep 4-03 |
Enbridge Gas Distribution Inc. |
RP-2003-0048 |
The Board issued its Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution, transmission and storage of gas for its 2004 fiscal year, commencing October 1, 2003.
|
May 8-03 |
Union Gas Limited |
RP-2002-0130 |
The Board issued its Decision with Reasons in an application by Union Gas Limited for rates for the year commencing January 1, 2003. This application arises under a Performance Based Regulation (PBR) methodology for setting rates. The Board had approved a three year trial PBR plan under which rates would be changed for years commencing January 1, 2001, 2002, 2003.
|
Feb 11-03 |
Enbridge Gas Distribution Inc. |
RP-2001-0032 |
The Board issued its Decision with Reasons in the matter of a motion by Enbridge Gas Distribution Inc. for review and variance of the decision of the Board as set out in its RP-2001-0032 Decision with Reasons dated December 13, 2002.
|
2002
2002 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
June 12-02 |
Hydro One Networks Inc. |
RP-2000-0023 |
The Board's Decision with Reasons in an application by Hydro One Networks Company Inc. for an order approving rates for the distribution of electricity. The Settlement Agreement is not available electronically, but is available for viewing in the Board's Public File Room. |
April 30-02 |
Uniform Pooled Transmission Rates |
RP-2001-0034 |
As a result of the passage of the Energy Competition Act, 1998, the former Ontario Hydro was required to separate its transmission function from its power generation function. And, as a result, the monopoly portion of the new entity, Hydro One Networks Inc., was required to apply to the Board for regulated transmission rates. The transmission rates of Hydro One are used to charge for the delivery of bulk electricity to the LDCs and directly connected industrial customers. For LDCs who are wholesale market participants these rates will be collected from the LDC by the IESO.
On April 30, 2002, after a hearing of an the application filed by Hydro One for transmission rates, the Board issued its Decision and Rate Order:
Transmission Rates Decision (RP-1999-0044)
|
Jan 28-02 |
Independent Electricity System Operator (IESO) |
RP-2001-0046 |
The Board's Decision with Reasons in a submission by the IESO for an order approving its proposed expenditures and revenue requirement and fixing fees which it may charge in 2002
|
2002 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 18-02 |
Enbridge Gas Distribution Inc. |
RP-2001-0032 |
The Board's Decision with Reasons in an application by Enbridge Gas Distribution Inc. for rates for the sale, distribution and storage of gas commencing October 1, 2001.
Decision (207 pages)
Financial Schedules (Excel) |
Sep 20-02 |
Union Gas Limited |
RP-2001-0029 |
The Board's Decision with Reasons in an application by Union Gas Limited for rates for 2001 and 2002 including annual inflation factors, tax rate and certain specific recoverable costs, all within an approved PBR (Performance-Based Regulation) plan.
Decision with Reasons (131 pages)
Settlement Agreement (The appendix is not available electronically, but is available for viewing in the Board's Public File Room.)
|
July 31-02 |
Union Gas Limited |
RP-2000-0078 |
The Board's Decision with Reasons in an application by Union Gas Limited for an order of the Board approving the unbundling of certain rates charged by Union Gas Limited for the sale, distribution, transmission and storage of gas.
Settlement Agreement (The appendices are not available electronically, but are available for viewing in the Board's Public File Room.)
|
2001
2001 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 17-01 |
Pooled Transmission Rates |
RP-1999-0044 |
The Board's Interim Decision and Order for pooled transmission rates, post market opening |
Jan 10-01 |
Independent Electricity System Operator (IESO) |
RP-2000-0134 |
The Board's Decision With Reasons in a submission by the IESO for an order approving its proposed expenditures and revenue requirement and fixing the fees which it may charge for the year 2001. |
2001 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Sep 6-01 |
Union Gas Limited |
EB-2001-0441 |
The Board's Decision with Reasons in an application by Union Gas Limited for the inclusion of Alliance Pipeline and Vector Pipeline contracts in the portfolio of upstream transportation to be allocated to customers electing direct purchase |
Aug 17-01 |
Enbridge Consumers Gas |
RP-2000-0040 |
The Board's Reasons for Decision in Enbridge Consumers Gas application for rates for the sale, distribution, transmission and storage of gas commencing October 1, 2000.
|
July 21-01 |
Union Gas Limited |
RP-1999-0017 |
The Board's Decision with Reasons in Union Gas Limited's application for rates and other charges in accordance with a performance based rate mechanism commencing January 1, 2000.
Decision PDF
Executive Summary PDF
Appendix A - Issues List PDF
Appendix B - PBR - Proposal Summary Excel spreadsheet or PDF
Appendix C - Summary of Board Adjustments to Delivery Revenue Excel spreadsheet or PDF
|
2000
2000 Electricity Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Sep 29-00 |
Generic Hearing on The Minister's Directive |
RP-2000-0069 |
The Board's Decision with Reasons, dated September 29, 2000 on the Generic Hearing on The Minister's Directive to the Ontario Energy Board dated June 7, 2000.
Decision with Reasons PDF
Executive Summary PDF
Appendix 1 - Ministers Directive PDF
Appendix 2 - Parties to the Proceeding PDF |
June 22-00 |
Toronto Hydro-Electric System |
RP-2000-0021 |
The Board's Decision with Reasons PDF in an application by Toronto Hydro-Electric System for an interim order or orders approving or fixing just and reasonable rates effective July 1, 2000. |
May 26-00 |
Ontario Hydro Networks Company (now Hydro One Networks Inc.) |
RP-1999-0044 |
The Board's Decision with Reasons for Year 2000 Transmission Cost Allocation and Rate Design.
Executive Summary PDF
Decision PDF |
Jan 18-00 |
Performance Based Regulation |
RP-1999-0034 |
The Board's Decision with Reasons which deals with certain issues raised by parties regarding the draft Rate Handbook to govern Performance Based Regulation for licensed electricity distributors.
Decision with Reasons PDF
Executive Summary PDF |
2000 Gas Decisions
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Oct 23-00 |
Heating, Ventilation and Air Conditioning Contractors Coalition ("HVAC") |
RP-1999-0058 |
The Board's Decision with Reasons on the complaint referred to the Board by HVAC under the Affiliate Relationships Code for Gas Utilities PDF |
June 29-00 |
Industrial Gas Users Association of Canada, the Consumers' Association of Canada and the Vulnerable Energy Consumers Coalition |
RP-1999-0001 |
The Board's Decision with Reasons in the matter of a Motion for Review and Variance by the Industrial Gas Users Association of Canada, the Consumers' Association of Canada and the Vulnerable Energy Consumers Coalition of the Board's decision for Enbridge Consumers Gas rates effective January 1, 2000.
Decision with Reasons PDF |
June 22-00 |
Union Gas Limited |
E.B.A. 825/872 |
The Board's Decision with Reasons in the matter of an application by Centra Gas (Ontario) Inc. (now Union Gas Limited) for a franchise renewal within the City of Kingston to serve the area of the former Township of Pittsburgh Decision with Reasons PDF |
Mar 10-00 |
Natural Resource Gas Limited |
RP-1999-0031 |
Fiscal 2000 Rates Decision with Reasons:
Decision with Reasons PDF
Executive Summary PDF
Settlement Agreement PDF
Addendum to Settlement Agreement PDF
Impact of Board's Findings in this Decision PDF |
1999 and earlier (significant Decisions and Reports issued by the Board prior to January 1, 2000)
Significant Decisions and Reports issued by the Board prior to January 1, 2000
Date | Applicant | Case # | Description and documents |
---|---|---|---|
Dec 16, 1999 |
Enbridge Consumers Gas |
RP-1999-0001 |
In the matter of an application by The Consumers’ Gas Company Ltd., carrying on business as Enbridge Consumers Gas, for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas for its 2000 fiscal year.
|
Oct 18, 1999 |
Ontario Energy Board |
RP-1999-0040 |
In the matter of a hearing on the Board’s own Motion on a proposed Standard Supply Service Code for electricity distributors.
|
Aug 17, 1999 |
Enbridge Consumers Gas |
EBO179-14 |
The Board's ruling on a motion by Enbridge Consumers Gas requesting the Board to review or rehear portions of its Decision with Reasons dated March 31, 1999 in E.B.O. 179-14/15. The motion requested that the Board review or rehear that portion of the Decision with Reasons dealing with the subject of deferred taxes associated with the Company's Rental Program.
|
Apr 22, 1999 |
Consumers' Gas Company Ltd. |
EBRO497-01 |
Decision with Reasons concerning an application by The Consumers’ Gas Company Ltd. for an order or orders approving rates to be charged for the sale, distribution, transmission and storage of gas for its 1999 fiscal year, and concerning requests for approval of an incentive mechanism in relation to the Operation and Maintenance Expense component of its cost of service, effective during the 2000 through 2002 fiscal years, and an incentive mechanism in relation to Demand Side Management.
|
Aug 20, 1998 |
Natural Resource Gas Limited |
EBRO496 |
In the matter of an application by Natural Resource Gas Limited for rates.
|
Mar 31, 1998 |
Centra Gas Ontario Inc. |
EBA767 |
Applications by Centra Gas Ontario Inc. for Orders renewing the terms and conditions upon which the Corporations of the City of Orillia, the Town of Gravenhurst, the Township of Severn and the Town of Bracebridge are, by by-law, to grant to Centra Gas Ontario Inc.
|
Jan 30, 1998 |
Consumers' Gas Company Ltd., |
EBO 188 |
A hearing to inquire into, hear and determine certain matters relating to natural gas system expansion for The Consumers' Gas Company Ltd., Union Gas Limited and Centra Gas Ontario Inc.
|
Jul 23, 1993 |
Ontario Energy Board |
EBO169III |
A report on the demand-side management aspects of gas integrated resource planning for The Consumers' Gas Company Ltd., Centra Gas Ontario Inc. and Union Gas Limited.
|
Sep 16, 1991 |
Ontario Energy Board |
EBO169 |
A report on gas integrated resource planning.
|
Aug 27, 1991 |
Canadian Pacific Forest Products Limited |
EBRO471 |
In the matter of an application by Canadian Pacific Forest Products Limited for a bypass competitive rate.
|
Mar 1, 1991 |
Consumers' Gas Company Ltd. |
EBRO465 |
An application by The Consumers' Gas Company Ltd. for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution and transmission of gas for its fiscal year commencing October l, 1990.
|
Oct 15, 1990 |
British Gas plc |
EBRLG35 |
Proposed acquisition of the common shares of the Consumers' Gas Company Ltd. by British Gas plc.
|
Jan 31, 1990 |
Inter-City Gas Corporation |
EBRLG34 |
In the matter of an application for leave of the Lieutenant Governor in Council with respect to the proposed change in control of ICc Utilities (Canada) Ltd.
|
Nov 1, 1988 |
Ontario Energy Board |
EBO146 |
Status report of the review by the Ontario Energy Board of its jurisdiction over gathering/production lines.
|
Sep 1, 1988 |
Union Gas Limited |
EBLO226 |
An application by Union Gas Limited for leave to construct a natural gas pipeline and ancillary facitities in the Townships of Moore and Sombra, both in the County of Lambton.
Addendum (Sep 30, 1988) |
Jun 1, 1987 |
Ontario Energy Board |
EBO134 |
A review by the Ontario Energy Board of the Expansion of the Natural Gas System in Ontario.
|
Nov 17, 1986 |
Gulf Canada Corporation |
EBRLG30 |
In the matter of an application for leave of the Lieutenant Governor in Council under subsection 26(2) of the Ontario Energy Board Act.
|
May 21, 1986 |
Ontario Energy Board |
EBO125 |
In the matter of the Ontario Energy Board's review of franchise agreements and certificates of public convenience and necessity.
|
Apr 4, 1986 |
Ontario Energy Board |
EBRO410 |
In the matter of a hearing relating to interim contract carriage arrangements on the Consumers' Gas Company Ltd.'s, Northern and Central Gas Corporation Limited's and Union Gas Limited's Ontario distribution systems.
|
Aug 2, 1985 |
Ontario Energy Board |
EBRLG28 |
In the matter of a public hearing to examine and report upon certain matters respecting the implications for energy supply, gas rates and service of a proposed acquisition of certain shares of Union Enterprises Ltd. by Unicorp Canada Corporation.
|
Jan 1, 1985 |
Inter-City Gas Corporation |
EBO118 EBO119 |
In the matter of applications under the Ontario Energy Board Act.
|
Jan 30, 1981 |
Consumers' Gas Company |
EBRO376-I & II |
In the matter of a rate application by The Consumers' Gas Company.
|
Apr 2, 1980 |
Consumers' Gas Company |
EBRO369-II |
In the matter of a rate application by The Consumers' Gas Company.
|