2011 electricity distribution rate applications

Jump to:

As part of its regulation of electricity distributors, the Ontario Energy Board established a multi-year electricity distribution rate setting plan which indicated that, commencing with 2008 rates, a limited number of distributors would be identified each year to file a future test year cost of service application based on Chapter 2 of the Board’s Filing Requirements, re-issued June 29, 2010. The plan would run for four years enabling each rate regulated distributor in the province to rebase its rates once during the four year plan.

For any of the other distributors seeking approval to change their distribution rates, distributors would file a mechanistic, formulaic update to their current rates based on the Board’s incentive regulation mechanism (IRM).

On April 20, 2010, the Board issued a letter addressing the issue of electricity distributors filing rate applications to have their rates set through a cost of service proceeding earlier than scheduled. The letter requested that any distributor wishing to change their filing year should file a letter with the Board by May 31, 2010. The letter also identified a list of 18 electricity distributors that would be subject to the cost of service process in 2011.

It is anticipated that the following distributors will file cost of service applications for rates effective May 1, 2011:

  • Attawapiskat Power Corporation
  • Brant County Power Incorporated
  • Fort Albany Power Corporation
  • Horizon Utilities Corporation
  • Hydro One Brampton Networks Incorporated
  • Kaschechewan Power Corporation
  • Kenora Hydro Electric Corporation
  • Kingston Electricity Distribution Limited 
  • Milton Hydro Distribution Incorporated
  • Niagara Peninsula Energy Incorporated
  • Parry Sound Power Corporation
  • St. Thomas Energy Incorporated
  • Toronto Hydro-Electric Systems
  • Waterloo North Hydro Incorporated
  • West Perth Power Inc.
  • Woodstock Hydro Services Incorporated

The following table contains links to select documents of a distributor’s rate application.  These documents include: 

  • The “Application” as filed by the distributor, provided as an Adobe Acrobat PDF file;
  • The “Notice of Application” Issued by the Board and to be published by the distributor.  The purpose of the Notice is to inform the affected ratepayers and other stakeholders of the application, its nature and the impact on affected customers;
  • For those distributors applying for rates based on COS, excel models filed in support of the application such as the Cost Allocation model, Revenue Requirement Workform, etc;
  • For those distributors applying for rates based on IRM, the application models used to calculate the revised rates modified as necessary to reflect the Board’s Decision.
  • The Decision issued by the Board when it has adjudicated on the application and the subsequent Rate Order that reflects the Decision in the Tariff of Rates and Charges.
Related information

Estimated Total Bill Impacts (pdf) (For those utilities whose Rate Orders have not yet been issued, no information is supplied in the bill impact chart. The chart will be updated as Rate Orders are released)

Estimated Total Bill Impacts for Hydro One Networks (pdf)

 

 APPLICATION DOCUMENTS

This table provides a list of select documents for each application. To view all documents for the application, click the case number associated with that particular distributor.

Click the column header to sort the table by DistributorProcess, Application Received or Updated on. Click the column again to switch between ascending/descending order. To filter results, start typing in the search field below. As you type the table will re-sort to only show rows that match what you type (e.g. typing 'Niagara' will show only the rows for Canadian Niagara Power Inc., Niagara Peninsula Energy Inc. and Niagara-on-the-Lake Hydro Inc.).

DistributorProcessApplicationModelsNotice of ApplicationDecision and Rate OrderUpdated on
Atikokan Hydro Inc.
EB-2010-0064
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
Attawapiskat Power Corporation
EB-2010-0124
COSNo application received    
Bluewater Power Distribution Corp.
EB-2010-0065
IRM 3Application Final Models (.zip)

Revised Final Models (.zip)
Notice of ApplicationDecision and Order

Revised Rate Order
Apr 18-11
Brant County Power
EB-2010-0125
COSLetter re: delay in filing  Decision and OrderMay 9-11
Brantford Power Inc.
EB-2010-0066
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 28-11
Burlington Hydro Inc.
EB-2010-0067
IRM 3 Application Final Models (.zip)Notice of Application Decision and OrderMar 17-11
Cambridge and North Dumfries Hydro
EB-2010-0068
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 28-11
Canadian Niagara Power Inc. – Eastern Ontario Power 
EB-2010-0071
IRM 3

Letter re: withdrawal from CoS

OEB Response re: withdrawal from CoS

Application

Final Models (.zip)Notice of ApplicationDecision and Order

Rate Order
Apr 14-11
Canadian Niagara Power Inc. – Fort Erie
EB-2010-0070
IRM 3

 

Letter re: withdrawal from CoS

OEB Response re: withdrawal from CoS

Application

Final Models (.zip)Notice of ApplicationDecision and Order

Rate Order
Apr 14-11
Canadian Niagara Power Inc. - Port Colborne
EB-2010-0069
IRM 3

Letter re: withdrawal from CoS

OEB Response re: withdrawal from CoS

Application

Final Models (.zip)Notice of Application

Avis de requête et d’audience
Decision and OrderMar 28-11
Centre Wellington Hydro Ltd.
EB-2010-0072
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
Chapleau Public Utilities Corporation
EB-2010-0073
IRM 3ApplicationFinal Models (.zip)

Notice of Application

Avis de requête et d’audience

Decision and OrderApr 7-11
Chatham-Kent Hydro Inc.
EB-2010-0074
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Corrected Decision and Order
Apr 14-11
Clinton Power Corporation
EB-2010-0075
 IRM 3No application received    
COLLUS Power Corp.
EB-2010-0076
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Revised Rate Order
Apr 1-11
Cooperative Hydro Embrun Inc.
EB-2010-0077
IRM 3 ApplicationFinal Models
(.zip)
Notice of Application

Avis de requête et d’audience
Decision and OrderApr 7-11
E.L.K. Energy Inc.
EB-2010-0126
IRM 2ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 28-11
Enersource Hydro Mississauga Inc.
EB-2010-0078
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
ENWIN Utilities Ltd.
EB-2010-0079
IRM 3ApplicationFinal Models
(.zip)

Revised Final Models (.zip)

Notice of Application

Avis de requête et d’audience

 

Decision and Order

Revised Rate Order
Apr 21-11
Erie Thames Powerlines Corp.
EB-2010-0080
IRM 3Application

Final Models
(.zip)

 

Notice of ApplicationDecision and OrderApr 7-11
Espanola Regional Hydro Distribution Corporation 
EB-2010-0081
IRM 3ApplicationFinal Models (.zip)Notice of Application

Avis de requête et d’audience
Decision and OrderMar 28-11
Essex Powerlines Corporation
EB-2010-0082
 IRM 3Letter re: delay in filing

Application
Final Models (.zip)Notice of Application

Notice of Application (francais)
Decision and OrderMar 17-11
Festival Hydro Inc.
EB-2010-0083
 IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of ApplicationDecision and Order

Revised Rate Order
May 6-11
Fort Albany Power Corporation
EB-2010-0127
COS No application received    
Fort Frances Power Corporation
EB-2010-0128
IRM 2ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderApr 14-11
Greater Sudbury Hydro Inc.
EB-2010-0085
IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of ApplicationDecision and Order

Revised Rate Order
Apr 21-11
Grimsby Power Inc.
EB-2010-0129
IRM 2ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderApr 21-11
Guelph Hydro Electric Systems Inc.
EB-2010-0130
IRM 3Letter re: delay in filing

Application
Final Models (.zip)Notice of ApplicationDecision and Order (Mar 17-11)

Rate Order
Apr 7-11
Haldimand County Hydro Inc.
EB-2010-0086
IRM 3ApplicationFinal Models (.zip)Notice of Application

Decision and Order (Mar 28-11)

Revised Rate Order

Apr 7-11
Halton Hills Hydro Inc.
EB-2010-0087
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
Hearst Power Distribution Co. Ltd.
EB-2010-0088
IRM 3 No application received
 
   
Horizon Utilities Corporation
EB-2010-0131
COS  Decision on the Preliminary Issue of Early Rebasing and Procedural Order No. 4Decision and Order

Rate Order
Aug 9-11
Hydro 2000 Inc.
EB-2010-0089
IRM 3ApplicationFinal Models (.zip)

Notice of Application

Avis de requête et d’audience

Decision and OrderApr 21-11
Hydro Hawkesbury Inc.
EB-2010-0090
IRM 3 ApplicationFinal Models (.zip)Notice of Application

Avis de requête et d’audience
Partial Decision and Order Apr 29-11
Hydro One Brampton Networks Inc.
EB-2010-0132
COSApplication pt. 1

Application pt. 2

Application pt. 3

Application pt. 4
 Notice of Application

Notice of Application (francais)
Decision and Order

Rate Order
Apr 28-11
Hydro One Networks Inc.
EB-2009-0096
COSClick here to view Hydro One's 2010 and 2011 distribution rate application Rate Order Dec 21-10
Hydro One Remote Communities Inc.
EB-2010-0092
IRM 3ApplicationFinal Models (.zip)Notice of Application

Notice of Application (francais)

Notice of Application (Cree)

Notice of Application (Ojicree)

Notice of Application (Ojibway)
Decision and OrderMar 28-11
Hydro Ottawa Limited
EB-2010-0133
COS 

Application pt. 1

Application pt. 2

 

Notice of Application

Notice of Application (francais)

Decision

 
Oct 27-10
Hydro Ottawa Limited
EB-2010-0326
IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)

Notice of Application

Notice of Application (francais)

Decision and Order

Corrected Decision and Order
Apr 28-11
Innisfil Hydro Dist. Systems Limited
EB-2010-0093
IRM 3ApplicationFinal Models (.zip)Notice of Application

Decision and Order

Revised Tariff Sheet

Mar 28-11
Kashechewan Power Corporation
EB-2010-0134
COS No application received    
Kenora Hydro Electric Corporation Ltd.
EB-2010-0135
COSLetter re: delay in filing  Decision and Order

Rate Order
Jul 6-11
Kingston Hydro Corporation
EB-2010-0136
COSApplication Notice of Application

Avis de requête et d’audience
Decision and Order

Rate Order
Jul 26-11
Kitchener-Wilmot Hydro Inc.
EB-2010-0094
IRM 3 ApplicationFinal Models (.zip)Notice of Application

Decision and Order (Mar 28-11)

Revised Rate Order

Apr 7-11
Lakefront Utilities Inc.
EB-2010-0095
IRM 3 ApplicationFinal Models (.zip)Notice of Application Decision and OrderMar 17-11
Lakeland Power Distribution Ltd.
EB-2010-0096
IRM 3ApplicationFinal Models (.zip)Notice of Application Decision and OrderMar 17-11
London Hydro Inc.
EB-2010-0097
IRM 3ApplicationFinal Models (.zip)Notice of Application

Avis de requête et d’audience
Decision and OrderApr 7-11
Middlesex Power Distribution Corp. - Dutton
EB-2010-0274
EB-2011-0109
IRM 2ApplicationFinal Models (.zip)Notice of Application Decision and Order

Decision and Order on Motions and Revised Rate Order
May 4-11
Middlesex Power Distribution Corp. - Middlesex
EB-2010-0098
EB-2011-0109
IRM 2ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Decision and Order on Motions and Revised Rate Order
May 4-11
Middlesex Power Distribution Corp. - Newbury
EB-2010-0275
EB-2011-0109
IRM 2ApplicationFinal Models (.zip)Notice of Application Decision and Order

Decision and Order on Motions and Revised Rate Order
May 4-11
Midland Power Utility Corporation
EB-2010-0099
IRM 3 ApplicationFinal Models (.zip)Notice of Application

Decision and Order (Mar 17-11)

Revised Rate Order

Apr 7-11
Milton Hydro Distribution Inc.
EB-2010-0137
COS Application Notice of ApplicationDecision and Order

Rate Order
Mar 22-11
Newmarket – Tay Power Distribution Ltd.
EB-2010-0100
IRM 3 No application received    
Niagara Peninsula Energy Inc.
EB-2010-0138
COSLetter re: delay in filing

Application
 Notice of Application Decision and Order

Rate Order
Jun 15-11
Niagara-on-the-Lake Hydro Inc.
EB-2010-0101
EB-2011-0099
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Decision and Order on Motion and Revised Rate Order
Apr 21-11
Norfolk Power Distribution Ltd.
EB-2010-0139
COS   Decision and Order on the Preliminary Issue of Early RebasingFeb 11-11
Norfolk Power Distribution Ltd.
EB-2011-0049
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMay 6-11
North Bay Hydro Distribution Limited
EB-2010-0102
IRM 3 ApplicationFinal Models (.zip)

Notice of Application

Avis de requête et d’audience

 

Decision and OrderApr 7-11
Northern Ontario Wires Inc.
EB-2010-0103
IRM 3 ApplicationFinal Models (.zip)Notice of Application

Avis de requête et d’audience
Decision and OrderApr 7-11
Oakville Hydro Distribution Inc.
EB-2010-0104
IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of Application 

Decision and Order (Mar 14-11)

Rate Order

Revised Rate Order

Apr 15-11
Orangeville Hydro Limited
EB-2010-0105
IRM 3ApplicationFinal Models (.zip)Notice of Application Decision and OrderApr 7-11
Orillia Power Distribution Corp.
EB-2010-0106
 IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Revised Rate Order
Apr 28-11
Oshawa PUC Networks Inc.
EB-2010-0107
IRM 3

Letter re: withdrawal from COS

OEB acknowledgement letter

Application

Final Models (.zip)Notice of ApplicationDecision and OrderApr 7-11
Ottawa River Power Corporation
EB-2010-0108
IRM 3 No application received    
Parry Sound Power Corporation
EB-2010-0140
COSApplication Notice of ApplicationInterim Rate Order

Decision and Order

Supplementary Decision

Rate Order
Aug 9-11
Peterborough Distribution Inc.
EB-2010-0109
IRM 3ApplicationFinal Models (.zip)Notice of Application Decision and OrderMar 17-11
PowerStream Inc. - Barrie
EB-2010-0110
EB-2010-0365
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderApr 7-11
PowerStream Inc. - South
EB-2010-0110
IRM 3ApplicationFinal Models (.zip)Notice of Application Decision and OrderApr 7-11
PUC Distribution Inc.
EB-2010-0111
IRM 3ApplicationFinal Models (.zip)Notice of Application

Avis de requête et d’audience
Decision and OrderMar 28-11
Renfrew Hydro Inc.
EB-2010-0112
IRM 3 ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMay 4-11
Rideau St. Lawrence Distribution Inc.
EB-2010-0113
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Revised Rate Order
Apr 28-11
St. Thomas Energy Inc.
EB-2010-0141
COS Letter re: delay in filing  Decision and Order

Rate Order
Jul 28-11
Sioux Lookout Hydro Inc.
EB-2010-0114
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 28-11
Thunder Bay Hydro Electricity Distribution
EB-2010-0115
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and Order

Revised Rate Order
Apr 8-11
Tillsonburg Hydro Inc.
EB-2010-0116
 IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderApr 14-11
Toronto Hydro-Electric System Limited
EB-2010-0142
COS    Partial Decision and Order

Rate Order

Decision and Order on Suite Metering Issues

Final Order Regarding Suite Metering Issues
Apr 26-12
Veridian Connections Inc. -  Veridian
EB-2010-0117
IRM 3 ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of ApplicationDecision and Order

Revised Rate Order
Apr 18-11
Veridian Connections Inc. -  Gravenhurst
EB-2010-0117
IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of Application Decision and Order

Revised Rate Order
Apr 18-11
Wasaga Distribution Inc.
EB-2010-0143
IRM 2Letter re: withdrawal from COS

OEB acknowledgement letter

Application
Final Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
Waterloo North Hydro Inc.
EB-2010-0144
 COS   

Decision and Order

Draft Settlement Agreement

Rate Order

Revised Rate Order

May 19-11
Welland Hydro Electric System Corp.
EB-2010-0118
IRM 3 ApplicationFinal Models (.zip)

Notice of Application

Avis de requête et d’audience

Decision and Order

Revised Rate Order
Apr 11-11
Wellington North Power Inc.
EB-2010-0119
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderMar 17-11
West Coast Huron Energy Inc.
EB-2010-0120
IRM 3ApplicationFinal Models (.zip)Notice of ApplicationDecision and OrderApr 14-11
West Perth Power Inc.
EB-2010-0121
COS     
Westario Power Inc.
EB-2010-0122
IRM 3ApplicationFinal Models (.zip)

Revised Final Models (.zip)
Notice of ApplicationDecision and Order

Revised Rate Order
Apr 21-11
Whitby Hydro Electric Corporation
EB-2010-0123
 IRM 3No application received    
Woodstock Hydro Services Inc.
EB-2010-0145
COSLetter re: delay in filing

Application
 Notice of ApplicationDecision and Order

Rate Order

Decision and Order on Motion to Review and Vary Rate Order
Jul 27-11

 

UPDATES

DateIssue / Document
Mar 3-11

The Board has issued a letter which sets out the Cost of Capital Parameter Updates for Cost of Service Applications effective May 1, 2011.

Mar 2-11

The Board has announced the price escalator (or inflation index) for the 2nd and 3rd Generation Incentive Regulation mechanisms for adjusting electricity distribution rates effective May 1, 2011.

 

Consistent with the Board’s findings in its December 20, 2006 Report of the Board on Cost of Capital and 2nd Generation Incentive Regulation for Ontario's Electricity Distributors, the Board will use the annual percent change in the Implicit Price Index for National Gross Domestic Product (GDP-IPI) for Final Domestic Demand.  On February 28, 2011, Statistics Canada published the change for 2010 over 2009 as part of the National Economic Accounts.  The percent change is 1.3% (click for Statistics Canada reference (1)Statistics Canada Reference (2) ).

 

The Board will adjust the price escalator in each distributor’s Incentive Regulation Mechanism model, if necessary, such that this change is reflected in the 2011 distribution rates for electricity distributors that are under the 2nd and 3rd Generation Incentive Regulation mechanisms.

Nov 15-10

The Board has issued a letter which sets out the Cost of Capital Parameter Updates for 2011 Cost of Service Applications effective January 1, 2011.

Sep 15-10

The Board has made available the following Microsoft Excel workbook for distributors to complete as part of their 2011 electricity rate application.

Aug 20-10

2011 2nd and 3rd Generation Rate Generators

The Board has made available the following Microsoft Excel workbooks, with completion instructions, for distributors to complete as part of their 2011 IRM rate application.

IRM2 Specific

IRM3 Specific

Related to Both

2011 Retail Transmission Service Rates (“RTSRs”)

The Board has made available the following Microsoft Excel workbook for distributors to complete as part of their 2011 electricity rate application.

Jul 9-10

The Board has issued an update of Chapter 3 of the Board’s “Filing Requirements for Transmission and Distribution Applications”. This chapter outlines the information that the Board requires an electricity distributor file when it makes an application seeking approval for incentive regulation mechanism (“IRM”) based rates.

 

Jul 8-10

The Board has issued revision 2.0 to Guideline G-2008-0001 - Electricity Distribution Retail Transmission Service Rates. This guideline outlines the information that the Board requires an electricity distributor file to seek approval to adjust its retail transmission service rates.

Jun 29-10

The Board has released an updated version of Chapter 2 of the Filing Requirements for Transmission and Distribution Applications which details the Board’s expectations as to what electricity transmitters and distributors are to file when requesting cost of service rate adjustments based on a forward test year.

Apr 20-10

The Board has issued a letter to all licensed electricity distributors addressing the issue of electricity distributors filing rate applications to have their rates set through a cost of service proceeding earlier than scheduled:

IRM FREQUENTLY ASKED QUESTIONS 

Question:
When I enter the rate classes on sheet B1.1 Curr&Appl Rt Class General the entry under "Fixed Metric" continues to show NA. How do I fix this?

Rate groupRate classFixed metricVol metric
RESResidentialNAkWh
GSLT50General service less than 50kWNAkWh

Answer
See Sheet B1dot1.doc

Question:
Sheet C1.1 Smart Meter Funding Adder does not show some of the rate classes I would expect to see. How do I fix this?

Answer
See Sheet B1dot1.doc

Question:
Global Adjustment Rate Riders don't appear on Sheet C4.1 Curr Rates & Chgs General or Sheet N1.1 Appl For Mthly R&C General.

Answer
Global Adjustment Rate Riders; both Electricity component and Delivery Component do not show on the subject sheets but will be shown on the model generated tariff sheet.

Question:
I cannot enter any values for USoA 1595 on sheet D1.5 Def Var - Cont Sch 2009. Why is this?

Answer
See Account 1595 Residual Disposition.doc

Question:
I filed our IRM rate application today, however, was unable to file the Excel models – I get an error saying invalid extension. What do I need to do?

Answer
See Saving Excel 2007 or higher documents in earlier version format.pdf

Was this page helpful?
Please tell us why, to help us improve:

Note: This form is intended for general feedback only. To report a specific problem that‘s time sensitive and/or may need further follow up, or to file a complaint with the OEB about an energy company, please contact us directly at contact us.