Ces publications spécialisées ne sont disponibles qu'en anglais en vertu du Règlement 671/92, qui en exempte l'application de la Loi sur les services en français. Pour obtenir de l'aide en français, veuillez communiquer avec la Commission au 416 481-1967 ou, sans frais, au 1-888-632-6273.
Vous pouvez filtrer les résultats en saisissant des mots-clés dans le champ de recherche ci-dessous. Au fur et à mesure que vous tapez, le tableau s'actualise automatiquement pour n'afficher que les lignes contenant vos mots-clés.
The Ontario Energy Board (OEB) has issued a partial decision and order on Toronto Hydro-Electric System Limited’s (Toronto Hydro) proposal to establish a customer-funded Innovation Fund.
The Ontario Energy Board (OEB) has issued a decision on Hydro One Networks Inc.’s (Hydro One) application for leave to construct approximately 64 kilometres of 230 kilovolt (kV) electricity transmission line and associated facilities in the Township of St. Clair, Municipality of Wallaceburg and the Chatham-Kent areas.
The OEB has issued a Decision and Order in the matter of regulatory charges effective January 1, 2025, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The Ontario Energy Board (OEB) issued its Decision and Order on a settlement proposal relating to most of Algoma Power Inc.’s (Algoma Power) application to change the rates it charges for electricity distribution.
The Ontario Energy Board (OEB) has issued its Decision and Order on a settlement proposal relating to most of Toronto Hydro-Electric System Limited’s (Toronto Hydro) application to change the rates it charges for electricity distribution effective January 1, 2025.
The Ontario Energy Board (OEB) has issued its Decision and Rate Order on Tillsonburg Hydro Inc.’s (Tillsonburg Hydro) application to change the rates it charges for electricity distribution.
The Ontario Energy Board (OEB) has issued its Decision and Order on Festival Hydro Inc.’s (Festival Hydro) application to change the rates it charges for electricity distribution.
The Ontario Energy Board (OEB) has issued its Decision and Order on Centre Wellington Hydro Limited’s (Centre Wellington Hydro) application to change the rates it charges for electricity distribution effective January 1, 2025.
The OEB has issued its decision on Hydro One Networks Inc. (Hydro One) application for approval to change its electricity transmission rates effective, January 1, 2025.
The OEB has issued its decision on Hydro One Sault Ste. Marie LP's application for approval to change its electricity transmission rates effective, January 1, 2025.
The OEB has issued its Decision and Order on Essex Powerlines' application for electricity distribution rates and other charges beginning January 1, 2025.
On August 29, 2024, the OEB issued its Decision and Order on Essex Powerlines' application seeking approval to establish a new deferral account (PowerShare Deferral Account) to capture commodity costs that exceed the Hourly Ontario Energy Price for any kWh procured by Essex Powerlines through its PowerShare pilot project.
The OEB has issued its decision on PUC & Hydro One Sault Ste. Marie's application for leave to construct transmission line and station facilities in the City of Sault Ste. Marie.
The OEB has issued its Decision and Order on the Independent Electricity System Operator's application for incremental expenditures for fiscal years 2024 and 2025.
The OEB has issued its Decision and Rate Order approving changes to the rates Hydro One Networks Inc. charges for electricity distribution effective July 1, 2024.
The OEB has issued its Decision and Order on Ontario Power Generation Inc's application relating to impacts from the Market Renewal Program on OPG’s prescribed generating facilities, and the disposition of balances in its deferral and variance accounts.
The OEB has issued its Decision and Order on Upper Canada Transmission Inc.'s application seeking approval of its 2024 electricity transmission revenue requirement and associated transmission rates.
The OEB has issued its Decision and Order on Hydro One Networks Inc. settlement proposal on an Application seeking approval for funding for renewable generation connection rate protection (RGCRP) compensation amounts effective January 1, 2024.
The OEB has issued its Decision and Rate Order approving changes to the rates Wasaga Distribution Inc. charges for electricity distribution effective May 1, 2024.
The OEB has issued its Decision and Rate Order approving changes to the rates Westario Power Inc. charges for electricity distribution effective January 1, 2024.
The OEB has issued its Decision and Order granting Hydro One Networks Inc. application for leave to refurbish an existing single-circuit electricity transmission line between Kirkland Lake Transformer Station and Matachewan Junction.
The OEB has issued its Decision and Rate Order approving changes to the rates Orangeville Hydro Limited charges for electricity distribution effective May 1, 2024.
The OEB has issued its Decision and Order granting Hydro One Network Inc.'s application for leave to construct transmission line in the regions of Thunder Bay, Rainy River and Kenora.
The OEB has issued its Decision on Synergy North Corporation's application for changes to the rates Synergy North charges for electricity distribution effective May 1, 2024.
The OEB has issued a Decision and Order in the matter of Renewable Generation Connection Rate Protection Compensation Amounts effective January 1, 2024.
The OEB has issued a Decision and Order in the matter of regulatory charges effective January 1, 2024, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued a Decision and Order on an Application for leave to construct: refurbishment of the existing section of electricity transmission line between Third Line Transformer Station and Mackay Transformer Station.
The OEB has issued a Decision and Order on an Application for leave to construct an electricity transmission line and associated facilities in the City of Toronto.
The OEB has issued a Decision and Order on an Application for variance account to capture the nuclear revenue requirement impact of the overturning of Bill 124.
The OEB has issued a Decision and Order in the matter of regulatory charges effective January 1, 2023, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued a Decision on Settlement Proposal and Order on Rates, Revenue Requirement and Charge Determinants on an Application for electricity transmission and distribution rates and other charges for the period from January 1, 2023 to December 31, 2027.
The OEB has issued a Decision and Order on an Application for leave to construct a double-circuit transmission line between Chatham Switching Station and Lakeshore Transformer Station and associated station facilities in the municipalities of Chatham-Kent and Lakeshore and the County of Essex.
The OEB issued a Decision On Accounting Order for the Application for Approval of a Smart Metering Charge for the years 2023 to 2027 and related matters.
The OEB has issued a Decision and Order on an Application for exemptions from certain provisions in the Distribution System Code and for an Accounting Order.
The OEB has issued a Supplementary Decision and Order in the matter of regulatory charges effective January 1, 2022, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued its Decision and Order on an Application from Kitchener-Wilmot Hydro Inc. and Waterloo North Hydro Inc. for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued its Decision and Order on an Application from Kitchener-Wilmot Hydro Inc. and Waterloo North Hydro Inc. for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued a Decision and Order on an Application to provide access to de-identified electricity consumption data to third parties that are Canadian Governmental Entities.
The OEB has issued its Decision and Order on an Application from North Bay Hydro Distribution Limited and Espanola Regional Hydro Distribution Corporation for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued its Decision and Order on an Application from North Bay Hydro Distribution Limited and Espanola Regional Hydro Distribution Corporation for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued its Decision and Order on an Application from Brantford Power Inc. and Energy + Inc. for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued its Decision and Order on an Application from Brantford Power Inc. and Energy + Inc. for approval to amalgamate and continue operations as a single electricity distribution company.
The OEB has issued a Decision and Order in the matter of regulatory charges effective January 1, 2022, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued its Decision and Order on an Application for leave to reconductor electricity transmission lines in the cities of Toronto and Mississauga.
The OEB has issued its Decision and Order on an Application for leave to construct: upgrade of high voltage electricity transmission line in the townships of Iroquois Falls, Black River-Matheson and Kirkland Lake.
The OEB issued a Decision and Order on the inflation factors to be used to set rates for certain electricity transmitters and electricity and natural gas distributors for 2022.
The OEB has issued its Decision and Order on an application for approval of electricity transmission revenue requirements for the period from April 1, 2022 to December 31, 2031.
The OEB has issued a Decision and Order amending electricity distributor licences to prohibit the issuance of disconnection notices for non-payment to residential consumers in light of the COVID-19 Stay-at-Home Order.
The OEB has issued its Decision and Order on an Application for leave to reconductor existing transmission circuits between Hawthorne transmission station and Merivale transmission station.
The OEB has issued a Decision and Order amending electricity distributor licences to prohibit the issuance of disconnection notices for non-payment to residential consumers in light of the COVID-19 Stay-at-Home Order.
The OEB has issued a Decision and Order amending electricity distributor licences to prohibit the issuance of disconnection notices for non-payment to residential consumers in light of the COVID-19 Stay-at-Home Order.
The OEB has issued a Decision and Order amending Electricity Distributor and Unit Sub-Meter Provider licences to require licensees to administer the COVID-19 Energy Assistance Program (CEAP) and the COVID-19 Energy Assistance Program – Small Business (CEAP-SB).
The OEB has issued a Decision and Order amending the Independent Electricity System Operator’s Licence to require it to assist with the administration of the COVID-19 Energy Assistance Program (CEAP) and the COVID-19 Energy Assistance Program – Small Business (CEAP-SB).
The OEB has issued a Decision and Order on an Application for leave to construct electricity transmission line and associated facilities in the City of Toronto.
The OEB has issued its Decision and Order on the 2021 Renewable Generation Connection Rate Protection Compensation Amount (Ontario Regulation 330/09), effective January 1, 2021.
The OEB has issued a Decision and Order amending the licences of all electricity distributors and unit sub-meter providers to reflect revised eligibility criteria for CEAP and CEAP-SB (EB-2020-0162 / EB-2020-0185).
The OEB has issued its Decision and Order on an Application for electricity transmission revenue requirement beginning January 1, 2021 and related matters.
The OEB has issued its Decision and Order on an Application for electricity transmission revenue requirement beginning January 1, 2021 and related matters.
The OEB has issued a Decision and Order in the matter of regulatory charges effective January 1, 2021, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued its Decision and Payment Amounts Order regarding Ontario Power Generation Inc.’s application for 2021 Hydroelectric Payment Amount Adjustment to be effective January 1, 2021.
The OEB has issued a Decision and Order on a Motion to review and vary the Decision dated March 12, 2015 regarding Hydro One Networks Inc.’s electricity distribution rates and other charges beginning January 1, 2015 (EB-2013-0416/EB-2014-0247).
The OEB has issued a Decision and Order amending Electricity Distributor and Unit Sub-Meter Provider licences to require licensees to administer CEAP-SB.
The OEB has issued a Decision and Order amending the Independent Electricity System Operator’s Licence to require it to assist with the administration of the COVID-19 Energy Assistance Program.
The OEB has issued a Decision and Order amending Electricity Distributor and Unit Sub-Meter Provider licences to require licensees to administer the COVID-19 Energy Assistance Program (CEAP).
The OEB has issued its Decision and Order on an Application for approval to amalgamate Peterborough Distribution Inc. and Peterborough Utilities Services Inc. and to transfer the electricity distribution system to Hydro One Networks Inc.
The OEB has issued its Decision and Order on an Application for approval to purchase all issued and outstanding shares of Orillia Power Distribution Corporation.
The OEB has issued its Decision and Order on an Application for electricity transmission revenue requirements beginning January 1, 2020 until December 31, 2022.
The OEB has issued a Decision and Order amending electricity distributor licences to prohibit the disconnection of low-volume consumers in light of the COVID-19 Pandemic.
The OEB issued a Decision and Order that found that Hydro One had cited grounds that have led the OEB to determine that the 2015 Decision to eliminate the Hydro One seasonal rate class should be reviewed.
The OEB has issued its Decision and Order on the 2020 Renewable Generation Connection Rate Protection Compensation Amount (Ontario Regulation 330/09), effective January 1, 2020.
The OEB has issued a Decision and Order on an Application for approval of electricity transmission revenue requirements for the period commencing January 1, 2020 and for each following year through to December 31, 2024.
The OEB has issued its Decision and Order on Toronto Hydro's application for electricity distribution rates beginning January 1, 2020 until December 31, 2024.
The OEB has issued its Decision and Order in the matter of regulatory charges effective January 1, 2020, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued its Decision and Order on an Application for electricity transmission revenue requirement beginning January 1, 2020 and related matters.
The OEB issued its Decision and Order on the Côté Gold Project on December 6, 2018. On October 9, 2019 the OEB issued an Order Varying the Decision and Order.
The OEB has issued a Decision and Order on an Application for Approval of the Allocation of Construction Costs of the Supply to Essex County Transmission Reinforcement Project.
The OEB has issued its Decision and Rate Order on an Application for electricity transmission revenue requirement beginning January 1, 2019 and related matters.
The OEB has issued its Decision and Order on an Application for approval for Dubreuil Lumber Inc. to sell its distribution system to Algoma Power Inc. and related matters.
The OEB has issued its Decision and Order on an Application for leave to construct transmission lines and associated facilities in northwestern Ontario.
The OEB has issued its Decision and Order on an application for 2018 Transmission Revenue Requirement and Charge Determinants, Reconsideration of Future Tax Savings Issue.
The OEB has issued its Decision and Order on the 2019 Renewable Generation Connection Rate Protection Compensation Amount (Ontario Regulation 330/09), effective January 1, 2019.
The OEB has issued its Decision and Order in the matter of regulatory charges effective January 1, 2019, for the Wholesale Market Services rate and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued its Decision on Interim Rates on an application for electricity transmission revenue requirement beginning January 1, 2019 and related matters.
Application for approval to amalgamate Erie Thames Powerlines Corporation and West Coast Huron Energy Inc. and continue operations as a single electricity distribution company.
Application for approval to amalgamate Veridian Connections Inc. and Whitby Hydro Electric Corporation and continue operations as a single electricity distribution company.
The OEB has issued its Decision and Order on Thunder Bay Hydro and Kenora Hydro's application to amalgamate and continue operations as a new electricity distribution company.
The OEB has issued a Decision and Order on an Application for approvals to effect the amalgamation of Alectra Utilities
Corporation and Guelph Hydro Electric Systems Inc.
The OEB has issued a Decision and Order on an Application for approvals to effect the amalgamation of Alectra Utilities
Corporation and Guelph Hydro Electric Systems Inc.
The OEB has issued a decision dismissing the allegations against Active Energy Inc. in relation to the Energy Consumer Protection Act, 2010 and the Electricity Retailer Code of Conduct (EB-2017-0022 / EB-2017-0223).
The OEB has issued a Payment Amounts Order regarding Ontario Power Generation’s application for payment amounts for the period from January 1, 2017 to December 31, 2021.
The OEB has issued its Decision on Accounting Order on an application for approval of smart metering charge for the 2018-2022 period. The OEB has reviewed the draft Accounting Order filed by the SME and finds that it accurately reflects the accounting and reporting requirements for the Balancing Variance Account approved in the March 1, 2018 Decision.
The OEB has issued its Decision and Order regarding Ontario Power Generation’s application for payment amounts for the period from January 1, 2017 to December 31, 2021.
The OEB has issued its Decision and Order in the matter of regulatory charges effective January 1, 2018, for the Wholesale Market Service charge and the Rural or Remote Electricity Rate Protection charge.
The OEB has issued a Decision and Order amending the licences of all Ontario electricity distributors to ban the disconnection of residential consumers from November 15 through April 30, and to require that disconnected homes be reconnected at no charge.
The OEB has issued its Decision and Order on an Application for electricity transmission revenue requirement and related changes to the Uniform Transmission Rates beginning January 1, 2017 and January 1, 2018.
The OEB has issued its Decision and Order in the matter of the Rural or Remote Electricity Rate Protection charge and Distribution Rate Protection effective July 1, 2017.
The OEB issued its Decision and Order on the Green Energy Plan Electricity Rate Protection Benefit and Charge (Ontario Regulation 330/09), effective May 1, 2017.
The OEB has issued its Decision and Order on an application for Leave to Construct Transmission Facilities between Henvey Inlet First Nation Reserve No. 2 and Parry Sound, Ontario.
The OEB has issued a Decision and Order amending the licences of all Ontario electricity distributors to ban the disconnection of residential consumers for the period through April 30, 2017, and to require that disconnected homes be reconnected as soon as possible at no charge. This Decision and Order follows the passage of the Protecting Vulnerable Energy Consumers Act, 2017 by the Ontario Legislature on February 22, 2017.
The OEB has issued a Decision and Order setting regulatory charges effective January 1, 2017, including the charge for the Ontario Electricity Support Program.
The OEB issued its Decision with Reasons and Order on the Green Energy Plan Electricity Rate Protection Benefit and Charge (Ontario Regulation 330/09), effective May 1, 2016.
The OEB issued its Decision with Reasons and Order on the Green Energy Plan Electricity Rate Protection Benefit and Charge (Ontario Regulation 330/09), effective January 1, 2016.
The OEB has issued a Decision and Order setting regulatory charges effective January 1, 2016, including the charge for the Ontario Electricity Support Program.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective January 1, 2025.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective January 1, 2025.
The Ontario Energy Board (OEB) issued its Decision and Interim Rate Order on a settlement proposal (the proposal) related to Phase 2 of Enbridge Gas Inc.’s (Enbridge) application to change its natural gas rates and other charges beginning January 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective October 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective October 1, 2024.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s application for an order granting leave to construct approximately 13 kilometres of natural gas pipeline and associated facilities in the Community of Sandford in the Township of Uxbridge.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective July 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective July 1, 2024.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s request for approval to construct approximately 22 kilometres of natural gas pipeline and associated facilities in the Townships of Admaston/Bromley, North Algona Wilberforce and Bonnechere Valley (including Eganville).
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s request for approval to construct approximately 12 kilometres of natural gas pipeline in the Community of Neustadt within the Municipality of West Grey.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s request for approval to construct two pipelines and associated ancillary facilities, which are collectively referred to as the Panhandle Regional Expansion Project.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s application to construct the Bobcaygeon Community Expansion Project which involves the construction of pipelines through the City of Kawartha Lakes to Bobcaygeon and from the Township of Cavan-Monaghan into the City of Kawartha Lakes.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s Application for the disposition of 2021 Demand Side Management Deferral and Variance Accounts.
The OEB has issued an interim rate order setting out the rates to be charged by Enbridge Gas Inc. for the distribution, transmission and storage of natural gas, effective January 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective April 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective April 1, 2024.
The OEB has issued its Decision and Order on Enbridge Gas Inc.'s application for leave to construct natural gas pipeline and associated facilities in the Municipality of Brooke-Alvinston and the Township of Warwick and for a new Certificate of Public Convenience and Necessity for the Township of Warwick.
The OEB held a hearing on its own motion to determine the prudence of Enbridge Gas's contracts with Vector Pipeline, pursuant to sections 19(4) and 36 of the Ontario Energy Board Act, 1998.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective January 1, 2024.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective January 1, 2024.
The OEB has issued a Decision on Motion to Review and Vary the EB-2022-0184 Decision and Order (Phase 2) relating to the Customer Volume Variance Account.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective October 1, 2023.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective October 1, 2023.
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipeline and associated facilities in the Township of Selwyn.
The OEB has issued a Decision and Order on an Application for Leave to Construct Mohawks of the Bay of Quinte and Shannonville Community Expansion Project.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective July 1, 2023.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective July 1, 2023.
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipeline and associated facilities in the Municipality of Chatham Kent.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective April 1, 2023.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective April 1, 2023.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective January 1, 2023.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective January 1, 2023.
The OEB has issued a Decision on Settlement Proposal and Rate Order on Enbridge Gas Inc's 2021 Deferral and Variance Account Disposition and Earnings Sharing Application.
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipeline and ancillary facilities in the Township of Dawn-Euphemia and St. Clair Township.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective October 1, 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (South Bruce) will charge its customers for natural gas effective October 1, 2022.
The OEB has issued a Decision and Order on an Application for approval to construct natural gas pipeline and ancillary facilities in the City of Hamilton.
The OEB has issued a Decision and Order on an Application for Leave to Construct NPS 12 East Sixteen Mile Creek Pipeline Replacement Project in the Town of Milton, Ontario.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective July 1, 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective July 1, 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective April 1, 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective April 1, 2022.
The OEB has issued its Decision and Order on an Application for Leave to Construct Natural Gas Pipeline and Associated Facilities in the Municipality of Greenstone.
The OEB has issued a Decision and Order on an Application by Enbridge Gas Inc. for approval to dispose 2020 balances in certain deferral and variance accounts and to review amounts for earnings sharing.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective January 1, 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective January 1, 2022.
The OEB issued a Decision and Order on the inflation factors to be used to set rates for certain electricity transmitters and electricity and natural gas distributors for 2022.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective October 1, 2021.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective October 1, 2021.
The OEB has issued a Decision and Order on Enbridge's application requesting OEB policy guidance on its Integrated Resource Planning (IRP) proposal. In response, the OEB is establishing a first-generation IRP Framework that provides direction on the OEB’s requirements as Enbridge Gas considers IRP to meet its system needs.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective July 1, 2021.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Aylmer) will charge its customers for natural gas effective July 1, 2021.
Application by Enbridge Gas Inc. for approval to dispose 2019 balances in certain deferral and variance accounts and to review amounts for earnings sharing.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Alymer) will charge its customers for natural gas effective April 1, 2021.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective April 1, 2021.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Alymer) will charge its customers for natural gas effective January 1, 2021.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective January 1, 2021.
The OEB has issued a Decision and Order on a Motion to review and vary the OEB's Decision and Order EB-2019-0007 (Leave to Construct Imperial Waterdown to Finch Project).
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipelines and associated facilities in the City of Toronto (NPS20 – Cherry to Bathurst project).
The OEB has issued a Decision and Rate Order on an Application for leave to construct natural gas pipelines and associated facilities in the City of Markham, Regional Municipality of York.
The OEB has issued its Decision and Order on an Application for leave to construct natural gas pipelines and associated facilities in the City of Markham, Regional Municipality of York.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Alymer) will charge its customers for natural gas effective October 1, 2020.
The OEB has approved changes to the prices EPCOR Natural Gas Limited Partnership (Southern Bruce) will charge its customers for natural gas effective October 1, 2020.
The OEB has issued its Decision and Order on an Application for approval to increase the maximum operating pressures of the Black Creek, Coveny and Wilkesport natural gas storage pools located near Sarnia, Ontario.
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipelines and associated facilities to serve the Northshore and Peninsula Roads area in the City of North Bay.
The OEB has issued its Decision and Order on an Application for an order to revoke the designation of the natural gas storage areas known as the Bayfield Pool and the Stanley 4-7-XI Pool, in the County of Huron.
The OEB has issued its Decision and Order on an Application for approval to construct a natural gas pipeline and associated facilities in the Municipality of Chatham-Kent and the Towns of Lakeshore and Tecumseh.
The OEB has issued its Decision and Order on an Application for approval to construct natural gas pipelines and ancillary facilities in the Township of St. Clair, in the County of Lambton (Sarnia Expansion Project).
The OEB has issued a Decision and Order on an Application for approval to construct a natural gas pipeline and associated facilities in the Town of Marathon, the Township of Manitouwadge, the Township of Schreiber, the Township of Terrace Bay and the Municipality of Wawa.
The OEB has issued its Decision and Order on an application for leave to construct natural gas pipelines and associated facilities to serve the community of Saugeen First Nation, north of Southampton in Bruce County.
The OEB has issued a Decision and Rate Order on EPCOR Natural Gas Limited Partnership's application for approval to change gas distribution rates and other charges effective January 1, 2020 to December 31, 2024.
The OEB has issued its Decision and Order on an Application for leave to construct a natural gas pipeline and associated facilities in the City of Ottawa.
The OEB has issued a Decision and Order on an Application for leave to construct natural gas pipelines and associated facilities to serve the Georgian Sands planned subdivision in Simcoe County.
The OEB has issued its Decision and Order on an Application for leave to construct natural gas transmission pipeline and associated facilities in the Municipality of Chatham-Kent.
The OEB has issued its Decision and Order on an Application for leave to construct natural gas transmission pipeline and associated facilities to serve the Municipality of Arran-Elderslie, the Municipality of Kincardine and the Township of Huron-Kinloss.
The OEB has issued its Decision and Interim Rate Order on EPCOR Natural Gas Limited Partnership's application for approval to change gas distribution rates and other charges effective January 1, 2020 to December 31, 2024.
The OEB has issued a Decision and Order on an Application for leave to construct a natural gas transmission pipeline and associated facilities in the Town of Lakeshore and the Town of Kingsville in the County of Essex.
The OEB has issued its Decision and Order on Enbridge Gas Distribution Inc. and Union Gas Limited's Application for Amalgamation (EB-2017-0306) and Rate-Setting Mechanism (EB-2017-0307).
The OEB has issued its Decision and Order on Enbridge Gas Distribution Inc. and Union Gas Limited's Application for Amalgamation (EB-2017-0306) and Rate-Setting Mechanism (EB-2017-0307).
The OEB has issued its Decision and Order on applications to serve the Municipality of Arran-Elderslie, the Municipality of Kincardine and the Township of Huron-Kinloss with natural gas distribution services (South Bruce Expansion Applications).
Application for approval to construct natural gas pipelines to serve the community of Fenelon Falls and charge a System Expansion Surcharge to all new customers in the community of Fenelon Falls.
The OEB has issued its Decision and Rate Orders on applications by Enbridge Gas Distribution Inc.(EB-2016-0300), Natural Resource Gas Limited (EB-2016-0330) and Union Gas Limited (EB-2016-0296) for approval of 2017 Cap and Trade Compliance Plan cost consequences.
The OEB has issued its Decision and Order on applications by Enbridge Gas Distribution Inc.(EB-2016-0300), Natural Resource Gas Limited (EB-2016-0330) and Union Gas Limited (EB-2016-0296) for approval of 2017 Cap and Trade Compliance Plan cost consequences.
The OEB has issued its Decision and Rate Order on Union Gas Limited's application for natural gas distribution, transmission and storage rates effective January 1, 2017.
The OEB issued a decision that enables utilities to recover costs of natural gas expansion to rural and remote communities, increasing energy options for residential and commercial consumers.
The OEB has issued its Decision and Order on Enbridge Gas Distribution Inc. and Union Gas Limited’s 2015-2020 natural gas conservation (or Demand Side Management – DSM) plans.
The OEB has issued its Decision and Order for a Combined Proceeding regarding NRG’s April 2014 QRAM, NRG’s request for interest rate relief and the OEB’s own motion to review the Decision and Order in Union’s Penalty Reduction Proceeding.
The OEB has issued its Decision and Interim Rate Order on Enbridge Gas Distribution's application for natural gas distribution, transmission and storage rates commencing January 1, 2016.
The OEB has issued its Decision and Rate Order on Union Gas Limited's application for natural gas distribution, transmission and storage rates effective January 1, 2016.
The Board has issued a Rate Order on an application by Enbridge Gas for an order or orders approving or fixing rates for the sale, distribution, transmission and storage of gas commencing January 1, 2015.
The Board has issued its Decision and Order on an application by Greenfield South Power Corporation for a certificate of public convenience and necessity pursuant to section 8 of the Municipal Franchise Act, R.S.O. 1990, c. M.55.
The Board has issued its Decision on an application by Natural Resource Gas Limited for an Order or Orders approving or fixing just and reasonable rates and other charges for the sale, distribution, transmission and storage of gas effective October 1, 2014.